Category:Inspection Plan
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML21012A4282021-01-13013 January 2021 Security Inspection Plan ML20017A2412020-01-15015 January 2020 Security Inspection Plan for Oyster Creek Generating Station - 2020 IR 05000219/20170062018-02-28028 February 2018 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Reports 05000219/2017006 05000219/2017402 and 05000219/2017501) IR 05000219/20170052017-08-28028 August 2017 Updated Inspection Plan Report 05000219 2017005 with Report 22 IR 05000219/20160062017-03-0101 March 2017 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2016006) with Report 22 ML16235A0792016-08-31031 August 2016 Mid Cycle Assessment Letter 2016-005 IR 05000219/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Inspection Report 05000219/2015006) IR 05000219/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2015005) ML15239A4742015-08-28028 August 2015 54(p) Eval IR 05000219/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2014001) IR 05000219/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000219-14-006 IR 05000219/20130012014-03-0404 March 2014 ROP-14 2013 Oyster Creek Nuclear Generating Station Annual Assessment Letter, Report 05000219-13-001, and Inspection Plan IR 05000219/20120012013-03-0404 March 2013 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2012001) IR 05000219/20120062012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Oyster Creek Nuclear Generating Station (Report 05000219/2012006) IR 05000219/20110012012-03-0505 March 2012 Annual Assessment Letter for Oyster Creek Generating Station (Report 05000219/2011001) ML1124401172011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Oyster Creek Nuclear Generating Station IR 05000219/20100012011-03-0404 March 2011 Annual Assessment Letter for Oyster Creek Generating Station, EOC-11 (Report 05000219/2010001) ML1024406162010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Oyster Creek ML1006212562010-03-0303 March 2010 Annual Performance Review and Inspection Plan - Oyster Creek 2009 EOC Letter and Report 22 (5000219-10-001) ML0914606122009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility Oyster Creek ML0914606132009-05-0606 May 2009 Inspection Cover Sheet, Report No. 50-219-08-007, Facility: Oyster Creek, with Handwritten Notes ML0914703552009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 ML0914703562009-05-0606 May 2009 License Renewal Outage Commitments Inspection Plan 2 IR 05000219/20090012009-03-0404 March 2009 Annual Assessment Letter - Oyster Creek Generating Station (05000219-09-001) ML0914606812008-10-23023 October 2008 E-mail from J. Richmond of USNRC to Various, Regarding Oc License Renewal Inspection Plan ML0915403162008-10-23023 October 2008 Inspection Cover Sheet, Facility: Oyster Creek, with Handwritten Notes ML0914606192008-10-22022 October 2008 E-mail from J. Richmond of USNRC to M. Modes of USNRC, Regarding Oc Lri Inspection Plan, Rev. 2 ML0824705692008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek IR 05000219/20080012008-03-0303 March 2008 (05000219-08-001), Annual Assessment Letter, EOC 2007 ROP8 ML0805900142008-02-27027 February 2008 Notification of Triennial Fire Protection Baseline Inspection ML0734706102007-12-13013 December 2007 ROP 8 - Oyster Creek - Change to Inspection Plan, 12/13/07 ML0724309392007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan ML0706105922007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Oyster Creek Station (05-219-07-001) ML0706004472006-10-31031 October 2006 1R21 Outage - NRC Inspection Question Log Complied by Amergen (12 Pages) ML0624401992006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Oyster Creek Nuclear Plant ML0606604692006-03-0606 March 2006 3/06/2006 - Oyster Creek Pre-Inspection Cover Sheet and Inspection Plan for License Renewal ML0606201302006-03-0202 March 2006 2006-001 Annual Assessment Letter - Oyster Creek Generating Station (Report 05-219/2006001) ML0524207272005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Oyster Creek Nuclear Power Plant ML0518801352005-07-0707 July 2005 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0406308112004-03-0303 March 2004 2003-04 Annual Assessment Letter - Oyster Creek ML0713401642003-09-0505 September 2003 Post Strike Briefing Including Oyster Creek Post Strike (Reintegration) Inspection Plan August 12, 2003 ML0323906832003-08-27027 August 2003 2003 Mid-Cycle Performance Review and Inspection Plan for Oyster Creek Nuclear Generating Station ML0713401622003-08-21021 August 2003 Post Strike Monitoring Activities - Updated 8/21/03 ML0713401562003-08-12012 August 2003 Post Strike (Reintegration) Inspection Plan, August 12, 2003 ML0713401532003-08-0707 August 2003 Post Strike (Reintegration) Inspection Plan Draft IR 05000219/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Oyster Creek Generating Station (Report 50-219/02-01) ML0610206381990-11-26026 November 1990 Drywell Containment, Attachment 1 to Letter Dated 04/07/2006 2024-01-09
[Table view] Category:Inspection Report
MONTHYEARIR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 IR 05000219/20214032021-12-21021 December 2021 EA-21-093 Notice of Violation and Proposed Imposition of Civil Penalty - $150,000, Inspection Report No. 05000219/2021403 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) ML21202A2312021-07-28028 July 2021 Discretionary Security Decommissioning Inspection Report No. 05000219/2021403 - Public Version IR 05000219/20210022021-07-27027 July 2021 NRC Inspection Report No. 05000219/2021002 and Independent Spent Fuel Storage Installation Report 07200015/2021002 IR 05000219/20210012021-05-18018 May 2021 NRC Inspection Report No. 05000219/2021001 and Independent Spent Fuel Storage Installation Report 07200015/2021001, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station IR 05000219/20204022020-12-14014 December 2020 Security Decommissioning Inspection Report 05000219/2020402 (Public - No Findings) IR 05000219/20200032020-10-21021 October 2020 NRC Inspection Report No. 05000219/2020003, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20204012020-07-27027 July 2020 Security Baseline Inspection Report 05000219/2020401 IR 05000219/20200022020-07-20020 July 2020 NRC Inspection Report No. 05000219/2020002, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20200012020-04-20020 April 2020 Forked River, New Jersey, NRC Inspection Report 05000219/2020001 IR 05000219/20190042020-01-0606 January 2020 NRC Inspection Report 05000219/2019004, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20190032019-10-28028 October 2019 NRC Inspection Report No. 05000219/2019003, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20190022019-07-24024 July 2019 NRC Inspection Report 05000219/2019002 IR 05000219/20190012019-04-15015 April 2019 NRC Inspection Report No. 05000219/2019001, Oyster Creek Nuclear Generating Station IR 05000219/20194012019-03-25025 March 2019 NRC Inspection Report No. 05000219/2019401 (Public) IR 05000219/20180122019-02-19019 February 2019 NRC Inspection Report No. 05000219/2018012, Oyster Creek Nuclear Generating Station IR 05000219/20180032018-11-0808 November 2018 Integrated Inspection Report 05000219/2018003 IR 05000219/20180022018-08-0202 August 2018 Integrated Inspection Report 05000219/2018002 and Independent Spent Fuel Storage Installation Report 0700015/2018001 IR 05000219/20184102018-06-18018 June 2018 Security Inspection Report 05000219-2018410 (Cover Letter) IR 05000219/20180012018-05-0808 May 2018 Integrated Inspection Report 05000219-2018001 and Exercise of Enforcement Discretion IR 05000219/20170062018-02-28028 February 2018 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Reports 05000219/2017006 05000219/2017402 and 05000219/2017501) IR 05000219/20180102018-02-28028 February 2018 Design Bases Assurance Inspection (Programs) Report 05000219/2018010 IR 05000219/20170042018-01-24024 January 2018 NRC Integrated Inspection Report 05000219/2017004 IR 05000219/20170092017-11-30030 November 2017 Temporary Instruction 2515-191 Inspection Report 05000219/2017009 IR 05000219/20174052017-10-25025 October 2017 Problem Identification and Resolution Sample Security Inspection Report 05000219/2017405 (Cover Letter) IR 05000219/20170082017-10-17017 October 2017 Supplemental Inspection Report 05000219/2017008 and Assessment Follow-Up Letter IR 05000219/20170032017-10-17017 October 2017 Integrated Inspection Report 05000219/2017003 IR 05000219/20175022017-10-16016 October 2017 Evaluated Emergency Preparedness Exercise Inspection Report 05000219-2017502 IR 05000219/20170052017-08-28028 August 2017 Updated Inspection Plan Report 05000219 2017005 with Report 22 IR 05000219/20174042017-08-15015 August 2017 Problem Identification and Resolution Cyber Security Inspection Report 05000219/2017404 (Cover Letter) IR 05000219/20170022017-08-0303 August 2017 Integrated Inspection Report 05000219/2017002 IR 05000219/20174032017-05-0909 May 2017 Security Inspection Report 05000219-2017403 (Cover Letter) IR 05000219/20170012017-05-0808 May 2017 Integrated Inspection Report 05000219/2017001 IR 05000219/20170072017-05-0101 May 2017 IR 05000219/20160042017-04-13013 April 2017 Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation - Inspection Report 05000219/2016004 IR 05000219/20160062017-03-0101 March 2017 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2016006) with Report 22 IR 05000219/20164042016-12-22022 December 2016 Material Control and Accounting Program Inspection Report 05000219/2016404 IR 05000219/20160082016-12-14014 December 2016 Problem Identification and Resolution Inspection Report 05000219/2016008 IR 05000219/20160032016-10-31031 October 2016 Integrated Inspection Report 05000219-2016003 IR 05000219/20160072016-08-10010 August 2016 IR 05000219/2016007;6-13-16-7/15/16; Oyster Creek Nuclear Generating Station-Component Design Bases Inspection-CDBI) IR 05000219/20160112016-08-10010 August 2016 Supplemental Inspection Report 05000219/2016011 and Assessment Follow-Up Letter 2023-08-22
[Table view] Category:Letter
MONTHYEARML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML22207B8382022-07-26026 July 2022 NRC Confirmatory Order EA-21-041 ML22130A6882022-05-10010 May 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22118A6122022-04-28028 April 2022 Annual Radioactive Environmental Operating Report for 2021 ML22118A5822022-04-28028 April 2022 Annual Radioactive Effluent Release Report for 2021 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22069A3762022-03-10010 March 2022 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML22032A0582022-03-0808 March 2022 EA-21-139; EA-150: Oyster Creek Nuclear Generating Station - NRC Investigation Report Nos.. 1-2021-002 & 1-2021-014 ML22060A2202022-03-0202 March 2022 NRC Office of Investigations Case No. 1-2021-009 ML22049B2452022-02-19019 February 2022 Late Low Level Radwaste Shipment Report Pursuant to 10 CFR 20 Appendix G IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 ML22025A3422022-01-25025 January 2022 and Big Rock Point - Changes to Site Organization ML22025A2182022-01-25025 January 2022 Late LLRW Shipments Investigation Report Pursuant to 10 CFR 20, Appendix G ML22021B5512022-01-21021 January 2022 Compensatory Measures Not Implemented Per Site'S Physical Security Plan Due to Multiplexer (Mux) Power Supply Failure L-21-134, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations2021-12-17017 December 2021 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Independent Spent Fuel Storage Installations ML21349A5192021-12-15015 December 2021 Commitment Change Summary Report ML21285A1912021-11-30030 November 2021 Nrc'S Analysis of Holtec Decommissioning International'S Decommissioning Funding Status Report for Oyster Creek Nuclear Generating Station and Pilgrim Nuclear Power Station, Docket Nos 50-219 and 50-293 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 L-21-118, Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades2021-11-0909 November 2021 Changes to Signature Authority & Addressee for Holtec Decommissioning International, LLC Correspondence Re to Oyster Creek Nuclear Generating Station, Pilgrim Nuclear Power Station, Indian Point Nuclear Generating Units 1, 2, 3, & Palisades IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) 2024-01-09
[Table view] |
Text
[Addressee, First UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 September 2, 2014 Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.
Warrenville, IL 60555 SUBJECT: MID-CYCLE ASSESSMENT AND ASSESSMENT FOLLOW-UP LETTER FOR OYSTER CREEK NUCLEAR GENERATING STATION (REPORT 05000219/2014006)
Dear Mr. Pacilio:
On August 12, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Oyster Creek Nuclear Generating Station. The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Oyster Creek Nuclear Generating Station was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Oyster Creek Nuclear Generating Station during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all performance indicators indicated that your performance was within the nominal, expected range (i.e, green).
Although plant performance was within the Licensee Response Column throughout the previous four quarters, as a result of its continuous review of plant performance, the NRC identified that the, Unplanned Scrams per 7000 Critical Hours performance indicator crossed the Green-to-White threshold with the unplanned scram on July 11, 2014. Specifically, Oyster Creek Nuclear Generating Station crossed the Green-to-White threshold following unplanned scrams on October 3, October 6, and December 14, 2013, and July 11, 2014. Although the Action Matrix column designation for the Oyster Creek Nuclear Generating Station will not change until the PI data are submitted, reviewed and posted following the end of the third calendar quarter, planning and scheduling activities in anticipation of an Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, can occur. The NRC will be in contact to discuss when your staff will be ready for this inspection.
This inspection is conducted to provide assurance that the root cause and contributing causes of risk significant performance issues are understood, the extent of condition is identified, and the corrective actions are sufficient to prevent recurrence.
The enclosed inspection plan lists the inspections scheduled through December 31, 2015.
Routine inspections performed by resident inspectors, as well as the IP 95001 which will result from the White performance indicator at the end of the third calendar quarter, are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
In response to the accident at Fukushima, the Commission issued Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond-design-basis external event. Additionally, the Commission issued Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond-design-basis external event. The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site-specific submittals, and to receive and review information relative to associated open items. This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff.
A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 will reflect this revision to Inspection Manual Chapter (IMC)
0310. Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310, and were evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRC's Agencywide Document Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Silas Kennedy at (610)337-5046 with any questions you have regarding this letter.
Sincerely,
/RA/
Ho K. Nieh Director Division of Reactor Projects Docket Nos.: 50-219 License Nos.: DPR-16 Enclosure: Inspection Plan cc w/encl: Distribution via ListServ
ML14239A222 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME JKulp/ LC for LCline/ LC SKennedy/SRK HNieh/ HKN DATE 08/21/14 08/26/14 08/27/14 08 /28 /14 Distribution w/encl:
W. Dean, RA D. Lew, DRA H. Nieh, DRP M. Scott, DRP J. Trapp, DRS B. Welling, DRS S. Kennedy, DRP L. Cline, Acting, DRP C. Roettgen, DRP B. Bollinger, DRP J. Kulp, DRP, SRI Amar Patel, DRP, RI J. DeVries, DRP, AA A. Bowers, RI OEDO R. J. Powell, DRP DRS Branch Chiefs (6)
N. McNamara, RI, SLO D. Tifft, RI, SLO D. Screnci, RI, PAO N. Sheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource RidsNrrPMOysterCreek Resource RidsNrrDorlLpl1-2 Resource ROPReports Resource
Page 1 of 2 Oyster Creek 08/26/2014 09:34:44 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP INSPECTION RAD HAZARD ALARA 1 1 08/11/2014 08/14/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/11/2014 08/14/2014 IP 71124.02 Occupational ALARA Planning and Controls 7111108G - INSERVICE INSPECTION 1 1 09/22/2014 09/26/2014 IP 7111108G Inservice Inspection Activities - BWR 71124 - HP INSPECTION IP 71124.01 .02 .03 04 1 1 09/22/2014 09/26/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/22/2014 09/26/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 09/22/2014 09/26/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09/22/2014 09/26/2014 IP 71124.04 Occupational Dose Assessment EP PROG - EP PROGRAM INSPECTION 1 1 09/22/2014 09/26/2014 IP 7111402 Alert and Notification System Testing 1 09/22/2014 09/26/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/22/2014 09/26/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71152B - PI&R BIENNIAL 5 1 11/03/2014 11/07/2014 IP 71152B Problem Identification and Resolution 1 11/17/2014 11/21/2014 IP 71152B Problem Identification and Resolution 71152 - PIR SAMPLE - EDG DEGRADED WRIST PIN 1 1 10/06/2014 10/10/2014 IP 71152 Problem Identification and Resolution 71124 - 71124.05 RAD MONITORING INSTRUMENTATION 1 1 10/20/2014 10/24/2014 IP 71124.05 Radiation Monitoring Instrumentation 71151 - 71151 PI VERIFY 71124.01.02.03.04 SAMPLE 1 1 11/17/2014 11/21/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/17/2014 11/21/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 11/17/2014 11/21/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 11/17/2014 11/21/2014 IP 71124.04 Occupational Dose Assessment 1 11/17/2014 11/21/2014 IP 71151-OR01 1 11/17/2014 11/21/2014 IP 71151-PR01 71124 - HP INSPECTION 71124.01 AND .02 1 1 01/26/2015 01/30/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 01/26/2015 01/30/2015 IP 71124.02 Occupational ALARA Planning and Controls 7111107T - TRIENNIAL HEAT SINK 1 1 03/09/2015 03/13/2015 IP 7111107T Heat Sink Performance This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Oyster Creek 08/26/2014 09:34:44 Inspection / Activity Plan Report 22 07/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site MODS - PERMANENT PLANT MODIFICATIONS 3 1 04/06/2015 04/10/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 1 04/20/2015 04/24/2015 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 71124 - RADIOACTIVE EFFLUENT CONTROL RETS 1 1 05/25/2015 05/28/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 7111111B - REQUAL INSP W/ P/F RESULTS 2 1 06/08/2015 06/12/2015 IP 7111111B Licensed Operator Requalification Program 71124 - REMP 1 1 08/03/2015 08/06/2015 IP 71124.07 Radiological Environmental Monitoring Program EP - EP EXERCISE 6 1 09/28/2015 10/02/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1 09/28/2015 10/02/2015 IP 7111408 Exercise Evaluation - Scenario Review 71151 - RP CHEM PI VERIFY RAD HAZARD 1 1 11/02/2015 11/05/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 11/02/2015 11/05/2015 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.