Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-219/89-03
ML20248D216
Person / Time
Site: Oyster Creek
Issue date: 09/22/1989
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fitzpatrick E
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 8910040157
Download: ML20248D216 (2)


Text

- -

ce n, y - ;7 =- ' ; ,

}

h'

pmye 3,3 .

'

I

,

^ ~ y(

.

3 '

p V SEP 2 2; 1989 -

.1

!

P ;4e u

' , ;lf : _

..

s 4&  : Docket No. 50-219' '

'GPU Nuclear Corporation . .. 'j

' ATTN: Mr;: Eugene E; Fitzpatrick

,

, 1 Vice President-and Director 'i

' Oyster. Creek Nuclear Generating . Station . '

j

,

'P. O. Box 388- 1

!

~ Forked River, New Jersey 08731;

, ,

]

P w

Gentlemen:

s

)

J Subject: ' Inspection No. 50-219/89-03

. j

.]

This refers to your. letter: dated ~ July 19,- 1989', in response to our letter -l dated March 8, 1989. .;

.

.

-

!

- Thank'you for informing us of th.e corrective and preventive actions documented 1

!

in. 'your letter. These actions'will be. examined during'a' future inspection of. j

. your; licensed program. 4 Your cooperation with us is appreciated.

Sincerely, Original Signed By:

Ronald R. Ed3m7 -

Ronald R. Bellamy, Chief Facilities Radiological Safety,

,

and Safeguards Branch Division of Radiation Safety and Safeguards 1

!

y CC.

M.-Laggart, BWR Licensing Manager Public Document Room (PDR)

Local Public Document Room.(LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Ins ~pector

. State of New Jersey 0FFICIAL RECORD COPY RL GPU 89-03 - 0001.0.0 1\

09/21/89

8910040157 8909222 yW PDR ADOCK 03000'19

-

g

_ ____ - __

FDC

_ - - _ _ _ _ _ _ - - _ _ _ - - - ------

E g--

p.

[ ..

 .
 .
 ,
 .

GPU Nuclear Corporation 2 SEP 2 2 1989, bcc: Region I Docket Room (with concurrences) Management Assistant,.DRMA (w/o enc 1) Section Chief, DRP A. Dromerick, Project Manager, NRR J. Dyer, EDO RI:DRSS RI: S ato/mk J RI:DG[/ Lazarus ' Bellamy 9////89 09/p/'89 09/ #/89 0FFICIAL RECORD COPY RL GPU 89-03 - 0002.0.0 09/21/89 _ _ _ - _ _ - __

- _ _ .
.
.w9
 ,
< ~

<

.,

I i Ei - Nuclear GPU Nuclear Corporation

      =str a Forked River, New Jersey 08731-0388 609 971-4000 Wnter's Direct Dial Nurnber:

July 19,1989 U.S. Nuclear Reguletory Commission ATTN: Document Control Desk Washington, DC 20555 Subject: Oyster Creek Nuclear Generating Station Docket No. ~ 50-219 Inspection Report 89-03, Clarification

Dear Sir:

The purpose of this letter is to update you regarding several items contained in the subject inspection. report. In order to ensure that no misunderstandings exist we would like to clarify the current status of the following items: 1) Section 4.1 states that " Weekly training drills will begin in the near future." This is still the case but it should be realized that the term " weekly" may be misleading. It is our intention to perform thirty to forty such drills per year.

2) Section 7.3 of the Inspection Report indicates that a communicators room will be provided in the Emergency Operations Facil.ity (EOF).

This room is currently being considered, however, a final determination has not been made.

3) Section 10.1 of the Inspection Report indicates that ten phones are provided for the Bureau of Nuclear Engineering (BNE) at the EOF. In fact there are six phones. If the BNE desires additional phones they will be provided.

4) Section 11.1 states that a senior DC station engineer reports to the Media Center. A senior manager with a background in Oyster Creek systems reports to the media center, however, this individual is not necessarily an engineer. The same section also states that monthly training is given to press release writers. This is an informal, undocumented drill session that is held about six times a year. It is not formal training as defined by GPU Nuclear Training and Education Department.

GPU Nuclear Corporation is a subsidiary of General Public Utihties Corporation 1777IDW7 '2- M

_ _ - _ _ - - . - . ___. _ - _ ,. 1 W .. ,

.. .

l-p .' , l-2-5) Section 12.5 states that the OCNGS Evacuation Time Estimate is being ' updated and should be ready by 1989. .This was true at the time of-the inspection, however, the update has been delayed to allow inclusion of the 1990 census data.

Should you have any questions concerning these items, please contact l Brenda DeMerchant, Oyster Creek Licensing Engineer, at (609) 971-4642.

Very truly yours, ,,

     /, -
   . J. Barton ty Director Oyster Creek i

JJB:BDe: dmd (0754A:02) cc: NRC Resident Inspector Dyster Creek Nuclear Generating Station Forked River, NJ 08731 JJ4r..W1111am~ x T. Russell, Administrator"

 '~ Region I"

U.S. Nuclear Regulatory Commission 475 Allendale Road

 . King of Prussia, PA 19406 Mr. Alexander W. Dromerick, Project Manager U.S. Nuclear Regulatory Commission Division of Reactor Projects I/II Washington, DC 20555 o
 .

_ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ - }}