Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-029/85-25. Corrective & Preventive Actions Will Be Examined During Future Insp
ML20202G304
Person / Time
Site: Yankee Rowe
Issue date: 04/10/1986
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Heider L
YANKEE ATOMIC ELECTRIC CO.
References
NUDOCS 8604140322
Download: ML20202G304 (1)


Text

_. . _

6

$ -

,

~

APR 101986 Docket No. 50-29

. Yankee Atomic Electric Company ATTN: Mr. L. H. Heider Vice President of Operations 1671 Worcester Road Framingham, Massachusetts 01701

, Gentlemen:

!

Subject: Inspection Report No. 50-29/85-25 l This refers to your letter dated March 5,1986, in response to our letter dated January 17, 1986.

~

, Thank you for informing us of the corrective and preventive actions documented :

! in your letter. These actions will be exam'ned during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely, crit:inni signed By:

Jacque P. Durr Stewart D. Ebneter, Director

, Division of Reactor Safety

'CC:

Public Document Room (POR)

Nuclear Safety Information Center (NSIC)

Commonwealth of Massachusetts bec:

Region I Docket Room (w/ concurrences)

Management Assistant, DRMA

'

DRP Section Chief M. McBride, RI, Pilgrim

$ ofd,bbM,$@" " g* *

RI:DRS RI.DRS RI:DRS Pullant/djh Anderson "g g j 3/d/86 3/4/86 f//f/86

OFFICIAL RECORD COPY llL YANKEE - 0001.0.0 l

03/18/86 t204140:J22 DR 860410 -+

'

ADOCK 05000029

, PDR l 1 0 \ l6 O

r ,

O w*o"ne ") 8' -8 '00

.s YANKEE ATO~lC ELECTRIC COMPANY TWX 710 380-7619

.M /

l 96g 1671 Worcester Road, Framingham, Massachusetts 01701 FYR 86-027 2,c2,11

,N[NKEE

,

March 5, 1986 United States Nuclear Regulatory Commission {

Region I 631 Park Avenue King of Prussia, PA 19406 ,

Attention: Dr. Thomas E. Murley Regional Administrator References: (a) License No. DPR-3 (Dceket No. 50-29)

(b) USNRC Letter to YAEC, dated January 17, 1986 Subject: Response to Inspectior No. 50-029/85-25

Dear Sir:

.

Reference (b) provided the results of the Staff's inspection of the Yankee Nuclear Power Station in regard to compliance with 10CFR50, Appendix R Sections III.G, J, and O. This report concluded that no violations were identified; however, an item regarding the Breaker coordination Study remained unresolved at the end of the inspection. This letter provides our response to the unresolved item.

As part of the associated circuit analysis, we performed a Breaker Coordination Study. At the time of the inspection, the results of the study were preliminary and corrective action plans had not been developed. At the exit interview on December 19, 1985, we agreed to inform the NRC of our intentions.

We have evaluated the results of our Breaker Coordination Study and have determined that no major modifications are required to correct study findings. Hinor changes to improve coordination will be done during the next two refueling outages presently scheduled for May 1987 and October 1988.

Please contact us if you have any questions.

Very truly yours, YANKEE ATOMIC ELECTRIC COMP NY C

GP/mec Senine Project Ensinocr-Licencing

' *

\" ~