| Quarter | Site | Title |
---|
05000373/FIN-2018003-04 | 2018Q3 | LaSalle | Failure to Manage the Increase in Risk During a Battery Charger Capacity Tes |
05000255/FIN-2018003-01 | 2018Q3 | Palisades | Wire Not Landed on Safety Injection Initiation Relay Circuit |
05000410/FIN-2018003-01 | 2018Q3 | Nine Mile Point | Failure to Ensure that Thermal Power is Less Than or Equal to the Licensed Power Limit |
05000289/FIN-2018003-01 | 2018Q3 | Three Mile Island | 1A Emergency Diesel Generator Lube Oil Leak Inadequate Corrective Actions |
05000366/FIN-2018003-01 | 2018Q3 | Hatch | Inoperability of 2A EDG Due to Inadequate Acceptance Criteria for Determining Cleaning Requirements of Emergency Diesel Generator Day Tanks |
05000354/FIN-2018002-01 | 2018Q2 | Hope Creek | Inadequate Instructions for Station Service Water Pump Maintenance |
05000461/FIN-2018002-02 | 2018Q2 | Clinton | Failure to Establish Adequate Leak Rate Test Procedures for Shutdown Service Water Isolation Valve Testing |
05000424/FIN-2018001-02 | 2018Q1 | Vogtle | Inadequate Acceptance Criteria for Testing of NSCW Pump Discharge Valves |
05000247/FIN-2018001-01 | 2018Q1 | Indian Point | Failure to Incorporate Adequate Test Controls for Quarterly Stroke Close Testing of the Steam Supply Valves to Turbine-Driven Auxiliary Feedwater Pump |
05000338/FIN-2018001-01 | 2018Q1 | North Anna | Failure to Assure Service Water Pump Sheds from Emergency Bus upon LOOP or SBO |