In-Service Inspection Summary Report for the Twenty-Fifth Refueling (R25)
ML21238A236
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/26/2021
From: Dittmer J
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-21-107
Download: ML21238A236 (5)


Text

         

ENERGY J Kent Dittmer Columbia Generating Station NORTHWEST P.O. Box 968, PE01 Richland, WA 99352-0968 Ph. 509.377.4348 l F. 509.377.4150 jkdittmer@energy-northwest.com August 26, 2021 GO2-21-107 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 IN-SERVICE INSPECTION

SUMMARY

REPORT FOR THE TWENTY-FIFTH REFUELING OUTAGE (R25)

Dear Sir or Madam:

Article IWA-6000 of Section XI of the 2007 Edition with the 2008 Addenda of the American Society of Mechanical Engineers (ASME) Code requires an In-Service Inspection Summary Report be submitted to regulatory and enforcement authorities having jurisdiction at the plant site at the completion of each refueling outage for the examinations, tests, and repair replacement activities conducted since the preceding summary report.

This report is to be submitted within 90 calendar days of the completion of the refueling outage. In this case, the report is for Columbia Generating Stations (Columbia) 25th operating cycle, which ended with the start-up from refueling outage R25 on June 19, 2021.

Code Case N-532 allows Energy Northwest to prepare an Owners Activity Report Form, OAR-1, in place of the Code required NIS-1 and NIS-2 forms for the summary report. The latest revision of this code case, N-532-5, is listed in Regulatory Guide 1.147, Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 19, Table 1, Acceptable Section XI Code Cases. Therefore, prior U.S. Nuclear Regulatory Commission (NRC) approval to implement this code case is not required.

The enclosure to this letter is herewith being submitted, which includes the completed OAR-1 form for Columbia. Included with the form are tables listing the Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service and Abstract of Repair/Replacement Activities Required for Continued Service in accordance with Code Case N-532-5. The results that are contained in this completed form are for activities performed during cycle 25 up to and including refueling outage R25.

         

GO2-21-107 Page 2 of 2 There are no commitments being made to the NRC by this letter. By means of this submittal, the reporting requirement of IWA-6000 is fulfilled for Columbias 25th operating cycle.

Should you have any questions or require additional information, please contact Mr. R.M.

Garcia, Licensing Supervisor, at (509) 377-8463.

 

Executed on this _____day of ___________, 2021.

Respectfully, J Kent Dittmer Vice President, Engineering

Enclosure:

Form OAR-1, Owners Activity Report for Columbia Generating Station Cycle R25 cc: NRC Region IV Administrator NRC NRR Project Manager NRC Senior Resident Inspector/988C CD Sonoda - BPA/1399 L Williamson - WA Department of L&I

         

Enclosure GO2-21-107 Form OAR-1 Owners Activity Report for Columbia Generating Station Cycle R25

4F-8389F5D4AAF4 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number ISI-SR-R25 Plant Columbia Generating Station, 76 North Power Plant Loop , Richland, WA 99354 Refueling outage Unit No. NA

([ applicable)

Commercial service date


12/13/1984 no. R25 Current inspection interval - - -- -- -- - - ----'- th _.,(1" "2""/-'-

4_ 5_-_1~2:;.,/1""2"'/-=

0-"1""'

3/""'2"'

1,;;;. 02 2,;;;.  ;;;..5"")' - - - - - - -- -----

(1" . 2", 3"' , 4*, other)

Current inspection period _ _ __ _ _ _ _ __ _ _ 2_nd_ (~1_2_/1_3_/2_0_1_9_-_12 _ /_1_2_/2_0_2_2~) _ _ __ __ __ _ _ _

(1", 2°' , 3"')

Edition and Addenda of Section X I applicable to the inspection plans 2007 Edition with 2008 Addenda Date I revision of inspection plans _ _ _ _ _ _ _ _ _ _ _ _ _M _ a~ y _5_th_ 2_0_2_1~,_R_e_v_is_i_ o _n_7_ _ _ _ _ _ _ _ __ __

Edition and Addenda of Section XI applicable to repair/replacement activities , if different than the inspection plans NA Code Cases used for inspection and evaluation : _ _ _ _ _ _ 0_8_-4 N_-5 _,_N _ -5_3_2_-5 ,N

__,,__ 3"-

-6'--1--'3--2""','""'N_-6..c..c.6-'-

'-'--' -7_1--'6--1'---'N-'---"7--'4-'-7_ _ __

,N

(~ applicable, including cases modified by Case N-532 and later revisions)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct: (b) the examinations and tests, meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of R25 (refueling outage number)

Conform to the requirements of Section XI Signed Steve Ri bate _A_u~g_u_st_ 1_0_1h--',_2_0_2_1_ _ _ _ _ _ _ _ _ __ _

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspector and employed by OneCIS Insurance Company of Lynn, Massachusetts have inspected the ijems described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XL By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employee shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commission Date 08'- I ~ - ~

Page 1 of 2

TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Item Description Evaluation Description Number None TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number In-Core Local Power Replaced dry tube 1 Range Monitor Assembly assembly 06/14/2021 2-3151 (LPRM-DET- 24/57) (Work Order 02179221)

Repair indications found in Residual Heat Removal the upper support 2 Heat Exchanger 05/31/2021 2-3147 attachment weld (RHR-HX-1A)

(Work Order 02177380)

Date Completed refers to the date of the completed NIS-2 or NIS-2A form. The physical repair/replacement work was performed prior to June 19, 2021 .

Page 2 of2