L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report | 6 December 2023 | Turkey Point | Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML23334A182 | 30 November 2023 | Pilgrim | Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 | Safe Shutdown High winds High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Emergency Lighting Locked High Radiation Area Tornado-Generated Missile Aging Management Abnormal operational transient Design basis earthquake Annual Radiological Environmental Operating Report License Renewal Earthquake Control of Heavy Loads Accidental discharge Fire Protection Program Fire Watch Scaffolding |
ML23332A177 | 28 November 2023 | Saint Lucie | Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Recently irradiated fuel Power change |
ML23345A088 | 28 November 2023 | Susquehanna | Technical Requirements Manual | Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Water Inventory Control Post Accident Monitoring Annual Radiological Environmental Operating Report Process Control Program Battery sizing Hourly Fire Watch Power change |
ML23345A084 | 28 November 2023 | Susquehanna | Technical Requirements Manual | Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Water Inventory Control Post Accident Monitoring Annual Radiological Environmental Operating Report Process Control Program Battery sizing Power change |
ML23320A242 | 16 November 2023 | | Ots Chapter 246-231 Wac Package Transportation (002) | Condition Adverse to Quality Exclusive Use Depleted uranium |
ML23310A312 | 8 November 2023 | Zion | Enclosure - Final Status Survey Safety Evaluation Report - Remaining Survey Units Outside the ISFSI | Annual Radioactive Effluent Release Report |
ML23312A165 | 6 November 2023 | | NRC-2016-000539 - Nrr&Nro_Released Set | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report License Renewal Chernobyl Environmental Justice Power change |
ML23310A108 | 3 November 2023 | Zion | Confirmatory Survey Report 2023 | |
ML23319A076 | 31 October 2023 | Farley | 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Fuel cladding Pressure Boundary Leakage Power Uprate |
ML23304A361 | 31 October 2023 | 05200050 | LLC Revision 1 to Standard Design Approval Application, Part 2, Chapter 12, Radiation Protection | Loop seal High Radiation Area Ultimate heat sink Grab sample Anticipated operational occurrence Coatings Emergency Lighting Fuel cladding |
ML23177A008 | 12 October 2023 | | Interim Staff Guidance on Subsurface Investigations | Machine learning |
ML23291A377 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Hydrologic Engineering | Safe Shutdown Ultimate heat sink Hydrostatic Operating Basis Earthquake Design basis earthquake Earthquake Power Uprate |
ML23292A149 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 11, Section 11.5, Process and Effluent Radiological Monitoring and Sampling Systems | Grab sample Anticipated operational occurrence |
ML23292A171 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 11, Section 11.2, Liquid Waste Management Systems | Grab sample Anticipated operational occurrence |
ML23292A166 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 11, Section 11.6, Low Level Radwaste Holding Facility (Llrwhf) | Offsite Dose Calculation Manual Earthquake Fire Protection Program Scaffolding |
ML23292A165 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 11, Section 11.4, Solid Waste Management System | Process Control Program |
BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 | 10 October 2023 | Vermont Yankee | License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 | Time of Discovery Offsite Dose Calculation Manual Coatings Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report License Renewal Exemption Request Earthquake Chernobyl Environmental Justice Scaffolding Fatality Power Uprate |
L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report | 18 September 2023 | Saint Lucie | Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report | 6 September 2023 | Saint Lucie | Corrections to the 2021 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Process Control Program |
LIC-23-0005, Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 | 24 August 2023 | Fort Calhoun | Response to Fort Calhoun Station, Unit No. 1 - Review of License Amendment Request to Add License Condition to Include License Termination Plan Requirements - 2nd Request for Additional Information (EPID L-2021-LIT-0000) June 2, 2023 | Annual Radiological Effluent Release Report |
ML23241A914 | 23 August 2023 | | t180-13 Effective 2021-04-05 Highlighted | Incorporated by reference Condition Adverse to Quality Exclusive Use |
ML23241A917 | 23 August 2023 | | t180-13 Effective 2022-11-02 Highlighted | Incorporated by reference Condition Adverse to Quality Exclusive Use |
ML23241A933 | 23 August 2023 | | t180-3 Effective 2021-06-15 Highlighted | Safe Shutdown Incorporated by reference Decommissioning Funding Plan Authorized possession limits License Renewal Static Eliminator |
ML23240A537 | 18 August 2023 | San Onofre | Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA | Annual Radiological Environmental Operating Report |
ML23270B389 | 11 August 2023 | | NRC-2021-000227 - Released Set Part 1 | Enforcement Discretion Cyber Security Open House License Renewal Pandemic COVID-19 Brachytherapy Environmental Justice |
ML23208A145 | 4 August 2023 | 07109393 | Safety Evaluation Report | Coatings Nondestructive Examination Finite Element Analysis |
ML23279A146 | 4 August 2023 | University of Texas at Austin | University of Texas-Austin Triga Research Reactor Safety Analysis Report - Redacted Version | Safe Shutdown Shutdown Margin High Radiation Area Fire Barrier Hydrostatic Coatings Emergency Lighting Earthquake Fuel cladding Fire Protection Program Power change |
ML23234A102 | 27 July 2023 | La Crosse | Decommissioning Plan (Dplan) and Post-Shutdown Decommissioning Activities Report (Psdar), Revised August 2023 | Offsite Dose Calculation Manual Decommissioning Funding Plan Process Control Program Fire Protection Program Environmental Justice |
ML23206A244 | 25 July 2023 | Columbia | Energy Northwest Columbia Generating Station, Response to Apparent Violation in NRC Inspection Report 05000397/2023092; EA-23-054 | High Radiation Area Preliminary White Finding |
BVY 23-019, Update to 2022 Radiological Effluent Release Report | 24 July 2023 | Vermont Yankee | Update to 2022 Radiological Effluent Release Report | Annual Radiological Effluent Release Report |
NUREG/CR-2907 Volume 26, Radioactive Effluents from Nuclear Power Plant - Annual Report 2020 | 30 June 2023 | | NUREG/CR-2907, Vol 26, Radioactive Effluents from Nuclear Power Plant - Annual Report 2020 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Chernobyl |
ML23181A166 | 30 June 2023 | Palo Verde | Enclosure 2 - Palo Verde Nuclear Generating Station Units 1, 2, and 3, Revision 22 to Updated Final Safety Analysis Report, Redacted Per RIS 2015-17 | Safe Shutdown Boric Acid High winds Shutdown Margin High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Weld Overlay Hydrostatic Probabilistic Risk Assessment Coatings Met Tower Operating Basis Earthquake Nondestructive Examination Emergency Lighting Incorporated by reference FLEX Fukushima Dai-Ichi Pressure and Temperature Limits Report Tornado Missile Protection Surveillance Frequency Control Program Spent Fuel Pool Instrumentation License Renewal Earthquake Turbine Missile Fuel cladding Liquid penetrant Pressure Boundary Leakage Grace period Power change Unidentified leakage |
ML23193A883 | 28 June 2023 | Millstone | 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Annual Radioactive Effluent Release Report Fuel cladding |
ML23193A875 | 28 June 2023 | Millstone | 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Processing and Radiation Protection Systems | Boric Acid Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radiological Effluent Release Report Fuel cladding |
ML23082A220 | 26 June 2023 | Fort Calhoun | Consultation on the Decommissioning of the Fort Calhoun Station Unit 1 Pressurized Water Reactor in Fort Calhoun, Nebraska | |
ML23167A360 | 14 June 2023 | | Wac Chapter 246-231 Packaging and Transportation of Radioactive Material | Condition Adverse to Quality |
ML23165A215 | 13 June 2023 | Vogtle | Enclosure 1: Vogtle Electric Generating Plant, Units 3 and 4, Updated Final Safety Analysis Report, Revision 12 | Safe Shutdown Boric Acid Fitness for Duty High winds Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Anticipated operational occurrence Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Internal Flooding Hydrostatic Enforcement Discretion Probabilistic Risk Assessment Coatings Operating Basis Earthquake Squib Cyber Security Emergency Lighting Incorporated by reference Test box Main transformer failure Significance Determination Process Job Performance Measure Scram Discharge Volume Process Control Program Safeguards Contingency Plan Hemyc License Renewal Earthquake Control of Heavy Loads Power-Operated Valves Pandemic Power Operated Valves Chernobyl Turbine Missile Fuel cladding Pressure Boundary Leakage Offsite Circuit Fire Protection Program Fatality Power Uprate Failure to Scram Depleted uranium |
ML23160A005 | 9 June 2023 | Calvert Cliffs | Annual Radioactive Effluent Release Report | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program |
ML23107A273 | 7 June 2023 | Crystal River | Orise Independent Survey Report Dcn 5366-SR-01-0 | |
ML23137A163 | 31 May 2023 | Dresden | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report |