ENS 54203

From kanterella
Jump to navigation Jump to search
ENS 54203 +/-
Where
Perry FirstEnergy icon.png
Ohio (NRC Region 3)
Reporting
10 CFR 50.72(b)(3)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident
Time - Person (Reporting Time:+-0.1 h-0.00417 days <br />-5.952381e-4 weeks <br />-1.3698e-4 months <br />)
Opened: Ed Condo
17:29 Aug 6, 2019
NRC Officer: Andrew Waugh
Last Updated: Aug 6, 2019
54203 - NRC Website