ENS 53656
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
05:00 Oct 9, 2018 | |
Title | Unplanned Loss of Emergency Response Equipment |
Event Description | At 2115 CST on October 9, 2018, South Texas Project Electric Generating Station (STPEGS) experienced an unplanned loss of the Integrated Computer System (ICS) to the Emergency Operations Facility (EOF). The loss of ICS resulted in a major loss of emergency assessment capability to the STPEGS Emergency Operations Facility (EOF) for greater than 75 minutes. Assessment capability has been verified to be available in the Unit 1 and Unit 2 Technical Support Centers (TSC) and the Unit 1 and Unit 2 Control Rooms.
This report is being made pursuant to 10 CFR 50.72(b)(3)(xiii), any event that results in a major loss of emergency assessment capability, off site response capability, or off site communications ability. The NRC Resident Inspector has been informed. The cause of the unplanned loss is currently being investigated and compensatory measures are in place.
Integrated Computer System was returned to service as of 0810 CDT on October 10, 2018. Notified R4DO (Gepford) and CAT via email. |
Where | |
---|---|
South Texas Texas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness | |
Time - Person (Reporting Time:+20.48 h0.853 days <br />0.122 weeks <br />0.0281 months <br />) | |
Opened: | Silvestre Romero Jr. 01:29 Oct 10, 2018 |
NRC Officer: | Steven Vitto |
Last Updated: | Oct 10, 2018 |
53656 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Cold Shutdown (0 %) |
After | Cold Shutdown (0 %) |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 542842019-09-18T12:50:00018 September 2019 12:50:00
[Table view]10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Communication with Emergency Operations Facility ENS 541452019-07-03T15:26:0003 July 2019 15:26:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Offsite Notification Due to Radio Transmitter Out of Service ENS 536562018-10-09T05:00:0009 October 2018 05:00:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unplanned Loss of Emergency Response Equipment ENS 531182017-12-12T23:57:00012 December 2017 23:57:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Unplanned Loss of Emergency Response Equipment ENS 527752017-05-30T14:29:00030 May 2017 14:29:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Emergency Operations Facility Integrated Computer System Data for Planned Maintenance ENS 511152015-06-01T15:26:0001 June 2015 15:26:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Unit 2 Ventilation Radiation Monitor Operability ENS 484482012-10-27T19:15:00027 October 2012 19:15:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Offsite Communications ENS 465882011-02-02T14:30:0002 February 2011 14:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Partial Loss of Prompt Notification System (Pns) Emergency Sirens Due to a Loss of Power ENS 435952007-08-25T12:30:00025 August 2007 12:30:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Erds System and Portions of Plant Computer Out of Service for Planned Maintenance Outage ENS 430862007-01-10T18:35:00010 January 2007 18:35:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Loss of Offsite Landline Communications Capability Due to Cut Fiber Optic Cable ENS 425792006-05-16T14:45:00016 May 2006 14:45:00 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Disruption of Incoming and Outgoing Telephone Communciation Capability 2019-09-18T12:50:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_53656&oldid=1090491"