Title | Part 21 - Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect |
Event Description | The following information is excerpted from an Engine Systems, Inc. (ESI) report received via fax:
COMPONENT: Diode Surge Suppressor Allen-Bradley P/N: 199-FSMZ-1 SUMMARY: Engine Systems Inc. (ESI) began a 10CFR21 evaluation on February 10, 2017 after receiving notification from FirstEnergy Corp - Perry Nuclear Power Plant (PNPP) of a manufacturing defect in a diode supplied by ESI. The evaluation was concluded on March 27, 2017 and it was determined that this issue is a reportable defect as defined by 10CFR21. The manufacturing defect identified was in a diode of the same date code as two diodes that failed while installed at PNPP. The failed diodes resulted In loss of class 1E control power which could have prevented the emergency diesel generator set from performing its safety related function. Discussion: In January 2007, ESI supplied a governor system upgrade to PNPP. The upgrade replaced the existing Woodward EGB-35C governor/actuator, EGA control (w/ resistor box), and MOP with an EGB-35P governor/actuator, 2301A control, and DRU. The electrical components were housed in a control panel assembly. To support the slow start feature of the new system, 4 relays were used, each of which used a surge suppressor (flyback) diode. PNPP experienced two failures in 2016 of the aforementioned diodes supplied by ESI. The diodes are Allen Bradley part number 199-FSMZ-1 and they were installed across the coils of Allen-Bradley 700DC series relays. The Allen-Bradley date code stamped on the side of the diodes is BX9. The failure in both cases resulted in a short circuit condition that resulted in a loss of class 1E control power to the EDG. Root cause evaluation: The root cause of the failure is determined to be a manufacturing defect internal to the diode. Though an analysis of the diodes that failed at PNPP was unable to be performed due to their condition, the analysis performed on a degraded diode of the same date code, BX9, detected an internal manufacturing defect. Affected Users: A listing of users with suspect diodes includes FirstEnergy - Perry, Entergy - Grand Gulf, Progress - Shearon Harris, and Duke - Shearon Harris. A total quantity of 34 diodes are suspect. Corrective Action: All affected users . . . [identified above] . . . should perform the following: 1. Review their inventory for suspect diodes listed in Table 1. Any suspect diodes should be removed from inventory and discarded. 2. Determine if suspect diodes listed in Table 1 have been installed. Thus far, ESI has identified degraded diodes from date codes BX9 and ZX9 and it is possible that diodes from the other date codes are degraded as well. ESI has been unable to determine an expected service life. Therefore, the recommendation is to remove or replace any installed suspect diodes as soon as possible. Note that the applications for which this diode has been supplied (Enterprise engine control panels) used the same style Allen-Bradley relays as original equipment but without diode surge suppressors. It is therefore acceptable to remove the diodes and expect no change or impact to the existing equipment. To prevent recurrence of this issue, the following has been Implemented by ESI: 1. The test procedure for the diode has been enhanced to increase the test voltage and decrease the allowable leakage current. Although this was not the cause of the failure, it may have prevented identification of a degraded condition. This corrective action has already been implemented. 2. A review has been performed of other diodes supplied by ESI and at this time only this one part number is affected. A typical diode would be procured and/or sold under the diode manufacturer part number; whereas in this case it was procured from the relay manufacturer. Testing was performed using typical relay values in lieu of the diode manufacturer's acceptance criteria. If you have any questions, you may call: Tom Horner Quality Assurance Manager Tel: (252) 977-2720 ESI Report ID: 10CFR21-0116, dated 03/27/17 |
Where | |
---|---|
Engine Systems, Inc. Rocky Mount, North Carolina (NRC Region 1) | |
Organization: | Engine Systems, Inc. |
Reporting | |
10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
Time - Person (Reporting Time:+12.85 h0.535 days <br />0.0765 weeks <br />0.0176 months <br />) | |
Opened: | Tom Horner 16:51 Mar 27, 2017 |
NRC Officer: | Bethany Cecere |
Last Updated: | Mar 27, 2017 |
52642 - NRC Website | |
Engine Systems, Inc. with 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect | |
WEEKMONTHYEARENS 569132023-11-27T05:00:00027 November 2023 05:00:00
[Table view]10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - EMD Cylinder Liner with Bore Deficiency ENS 566032023-05-17T04:00:00017 May 2023 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Emergency Diesel Generator - Incorrect Bus BAR Installation ENS 558072022-01-27T04:00:00027 January 2022 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - ELECTRO-MOTIVE Diesel (EMD) Cylinder Head with Fireface Thickness Below Specification ENS 545882020-03-19T04:00:00019 March 2020 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Notification - Test Stand Deficiency ENS 530842017-11-20T05:00:00020 November 2017 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part-21 - Auxiliary Feedwater Pump Power Supply Failure ENS 530372017-10-25T04:00:00025 October 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Speed Switch Issue Results in Emergency Diesel Generator Failure to Start ENS 526422017-03-27T04:00:00027 March 2017 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 - Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect ENS 514952015-08-26T04:00:00026 August 2015 04:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Speed Switch Capacitor Failure ENS 498302014-02-10T05:00:00010 February 2014 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part 21 Report - Failed Pressure Regulator During Post-Installation Edg Pressure Testing ENS 495342013-10-25T05:00:00025 October 2013 05:00:00 10 CFR 21.21(d)(3)(i), Failure to Comply or Defect Part21 - Diode Cr7 Wiring Reversed on Automatic Voltage Regulator Panels 2023-05-17T04:00:00 | |