ENS Event | |
---|---|
04:50 Apr 12, 2016 | |
Title | Loss of Both Emergency Diesel Generators |
Event Description | On April 12, 2016, with the reactor at 100 percent power and the mode switch in RUN, Pilgrim Nuclear Power Station entered an unplanned 24-hour Limiting Condition for Operation (LCO) action statement due to both emergency diesel generators (EDG) being inoperable (Technical Specification 3.5.F.1). At 0050 [EDT] this morning, with EDG B out of service for a planned LCO maintenance window, EDG A was declared inoperable due to a 130 drop per minute leak on a line to a jacket water pressure indicator.
Repairs to EDG A are underway at this time. The following plant equipment has been verified operable: both 345 Kv transmission lines; 23kV transmission line; Station Blackout EDG. This condition is reportable to the NRC Staff as an Event or Condition that Could Have prevented Fulfillment of a Safety Function (Mitigate the consequences of an accident) under 10 CFR 50.72(b)(3)(v)(D), and requires an 8-hour notification. The licensee has notified the NRC Senior Resident Inspector. The licensee will notify the Commonwealth of Massachusetts. |
Where | |
---|---|
Pilgrim Massachusetts (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+2.95 h0.123 days <br />0.0176 weeks <br />0.00404 months <br />) | |
Opened: | Mike Mcdonnell 07:47 Apr 12, 2016 |
NRC Officer: | Jeff Herrera |
Last Updated: | Apr 12, 2016 |
51862 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |