ENS 49804

From kanterella
Jump to navigation Jump to search
ENS 49804 +/-
Where
Perry FirstEnergy icon.png
Ohio (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-2.68 h-0.112 days <br />-0.016 weeks <br />-0.00367 months <br />)
Opened: Robert Kidder
08:19 Feb 7, 2014
NRC Officer: Pete Snyder
Last Updated: Feb 7, 2014
49804 - NRC Website