ENS Event | |
---|---|
05:01 Nov 24, 2013 | |
Title | Momentary Loss of Reactor Building Ventilation |
Event Description | On 11/24/2013 at 00:00:54 seconds [EST], Reactor Building ventilation tripped due to low outside air temperature. At 00:01:42 seconds, Secondary Containment Differential pressure went positive, with a maximum of +0.08 inches WC [water column]. This is a loss of Secondary Containment function. At 00:02:30 seconds, Standby Gas Treatment System was started and Secondary Containment pressure then decreased to <0 inches WC at 00:03:18 seconds. All the above data parameters were taken from the Division 2 Reactor Building Differential pressure recorder.
Secondary Containment pressure is stable with differential pressure negative <-0.30 inches WC. The loss of Secondary Containment function is reportable under 10CFR 50.72(b)(3)(v)(c) as an event or condition that could have prevented the fulfillment of a safety function needed to control the release of radioactive material. Technical Specification requirement are to maintain secondary containment pressure <-0.125 WC. No actual radiation release occurred during the event. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Fermi Michigan (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material | |
Time - Person (Reporting Time:+-2.12 h-0.0883 days <br />-0.0126 weeks <br />-0.0029 months <br />) | |
Opened: | Mark Eghigian 02:54 Nov 24, 2013 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Nov 24, 2013 |
49575 - NRC Website | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |