ENS Event | |
---|---|
22:40 Jan 8, 2013 | |
Title | Unusual Event Declared Due to Main Transformer Fire |
Event Description | Fire in Unit 2 main transformer 2A. Reactor trip. Two train of offsite power lost to Unit 2.
An Unusual Event was declared based on EAL HU-2 - Fire or explosion in protected area or switchyard which affects normal plant operations. At 1655 CST, South Texas Unit 2 declared an Unusual Event due to a main transformer fire. Unit 2 tripped from 100% power and is currently at 0% power in Mode 3. The transformer fire is out. In addition to the loss of the main transformer, several safety related electrical busses and non-safety electrical busses lost offsite power. The appropriate emergency diesel generators started and powered the safety related busses. Unit 2 is currently stable and on natural circulation due to the loss of power to the reactor coolant pumps. Auxiliary feedwater is functioning as required and decay heat is being removed through the steam generator atmospheric relief valves. Unit 1 was unaffected by the event. The licensee notified the NRC Resident Inspector. Notified DHS SWO, FEMA, DHS NICC and NuclearSSA via email.
On January 8, 2013, at 1640 CST, a failure of the Unit 2 Main Transformer occurred which resulted in a Unit 2 automatic trip. The failure of the main transformer resulted in a fire and damage to the transformer. The onsite fire brigade responded to the fire. The fire was declared under control at 1649 CST and declared out at 1656 CST. No offsite assistance was required. An Unusual Event was declared at 1655 CST for initiating condition HU-2 (Fire or explosion in protected area or switchyard which affects normal plant operations) due to the main transformer fire. Due to the site electrical lineup at the time, the loss of the main transformer resulted in a loss of power to 4160 ESF buses 2A and 2C, and associated Standby Diesel Generators 21 and 23 started as required and loaded on to their respective buses. 4160 ESF bus 2B remained energized from offsite power during this event and Standby Diesel Generator 22 did not start since an undervoltage condition did not exist on its ESF bus. All three (3) motor-driven and the steam-driven Auxiliary Feedwater Pumps started as required. The Main Steam Isolation Valves were closed in accordance with procedure to limit plant cooldown. Decay heat is being removed via Auxiliary Feedwater with Steam Generator Power Operated Relief Valves. Following the reactor trip, Pressurizer Power Operated Relief Valve 656A momentarily lifted and re-closed. There were no personnel injuries and no radiological release as a result of this event. A press release has been issued. The plant is currently stable in Mode 3 and the cause of the event is under investigation. The Unusual Event was terminated at 1947 CST on 1/8/2013. The licensee notified the NRC Resident Inspector. Notified R4DO (Gaddy), NRR (Leeds), R4 (Reynolds), IRD (Gott), NRR EO (Hiland). Notified DHS SWO, FEMA, USDA, HHS, DOE, DHS NICC, EPA, and NuclearSSA via email. |
Where | |
---|---|
South Texas Texas (NRC Region 4) | |
Reporting | |
Emergency class: | Unusual Event |
10 CFR 50.72(a) (1) (i), Emergency Class Declaration 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-4.42 h-0.184 days <br />-0.0263 weeks <br />-0.00605 months <br />) | |
Opened: | Eric Maxwell 18:15 Jan 8, 2013 |
NRC Officer: | Donald Norwood |
Last Updated: | Jan 8, 2013 |
48659 - NRC Website | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | A/R |
Before | Power Operation (100 %) |
After | Hot Standby (0 %) |
South Texas with 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
WEEKMONTHYEARENS 568772023-12-02T12:10:0002 December 2023 12:10:00
[Table view]10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation - Auto Start of Emergency Diesel Generator ENS 556922022-01-06T12:03:0006 January 2022 12:03:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation - Auto Start Emergency Diesel Generator ENS 551042021-02-15T11:26:00015 February 2021 11:26:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation Automatic Reactor Trip Due to Low Steam Generator Level ENS 546052020-03-24T15:46:00024 March 2020 15:46:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Specified System Actuation - Auto Start Emergency Diesel Generators ENS 543512019-10-25T01:51:00025 October 2019 01:51:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Undervoltage Actuation During Edg Sequencer Maintenance ENS 518972016-05-02T01:21:0002 May 2016 01:21:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Generator Lockout ENS 516872016-01-27T05:25:00027 January 2016 05:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Loss of Feedwater to a Single Steam Generator ENS 516152015-12-21T21:33:00021 December 2015 21:33:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip Due to Feedwater Isolation ENS 515362015-11-13T12:39:00013 November 2015 12:39:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Notification of Unusual Event Due to Unidentified Rcs Leakage Greater than 10 Gpm ENS 497402014-01-18T10:01:00018 January 2014 10:01:00 10 CFR 50.72(a)(1)(i), Emergency Class Declaration Unusual Event Due to Fire in the Protected Area ENS 496662013-12-20T04:33:00020 December 2013 04:33:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Actuation of Main Steam Isolation Valves That Was Not Part of a Preplanned Sequence ENS 486592013-01-08T22:40:0008 January 2013 22:40:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Declared Due to Main Transformer Fire ENS 486512013-01-04T15:41:0004 January 2013 15:41:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 2 Manually Tripped After Two Shutdown Control Rods Unexpectedly Dropped During Surveillance Testing ENS 474852011-11-29T09:29:00029 November 2011 09:29:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Turbine Trip on Generator Lockout ENS 463872010-11-03T15:21:0003 November 2010 15:21:00 10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release, 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(a)(1)(i), Emergency Class Declaration, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unusual Event Declared Due to an Explosion in the Protected Area Which Affects Normal Operations ENS 462982010-10-01T00:04:0001 October 2010 00:04:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Standby Diesel Generator Autostart Due to Loss of a Switchyard Bus During Maintenance ENS 461912010-08-20T20:25:00020 August 2010 20:25:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to an Inadvertent Turbine Trip Signal During Testing ENS 446052008-10-26T04:42:00026 October 2008 04:42:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Safety Injection Signal Due to Maintenance Error ENS 404732004-01-23T22:16:00023 January 2004 22:16:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to High-High Steam Generator Level 2023-12-02T12:10:00 | |