ENS Event | |
---|---|
04:10 Oct 3, 2012 | |
Title | Unanalyzed Condition Due to High Energy Line Break Barrier Being Partially Open |
Event Description | At 0010 [EDT] on 10/3/12, it was determined that an unanalyzed condition existed for the switchgear rooms on Unit 1. A degraded condition of a high energy line break (HELB) barrier was created during security surveillance. A HELB barrier door for the 27' elevation switchgear room was partially opened for a 14 minute period and could have allowed steam from a HELB on the 27' elevation of the Turbine Building to potentially impact equipment in both the 27' and 45' elevation switchgear rooms because these rooms are connected by a common ventilation system. The switchgear rooms are not analyzed for a steam environment. The degree of the impact could not be readily determined, but could likely affect the safety related equipment in the switchgear rooms. At 0024 [EDT] on 10/3/12, the HELB barrier door for the 27' elevation switchgear room was closed and the barrier restored which eliminated the potential unanalyzed condition. An 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> report to the NRC is required under 10 CFR 50.72(b)(3)(ii)(B), 'Any event or condition that results in the nuclear power plant being in an unanalyzed condition that significantly degrades plant safety' since there was not a reasonable expectation that the switchgear room environment could support operation of safety related equipment with the 27' elevation switchgear room door partially open. Further analysis is underway.
The licensee has notified the NRC Resident Inspector.
Subsequent engineering analysis conducted for this condition demonstrated that having the roll-up door stuck open six inches would not, should a HELB occur in the vicinity of the 27' switchgear room roll-up door, result in conditions within both switchgear rooms that would challenge the design limits and which would render the Class 1E electrical busses inoperable. Therefore the unit was not in a degraded or unanalyzed condition. As a result this condition is not reportable under 50.72(b)(3)(ii)(B). Based on this information, Calvert Cliffs is retracting notification message EN #48367. The licensee has notified the NRC Resident Inspector. Notified R1DO (Dwyer). |
Where | |
---|---|
Calvert Cliffs Maryland (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+3.25 h0.135 days <br />0.0193 weeks <br />0.00445 months <br />) | |
Opened: | Joseph Gioffre 07:25 Oct 3, 2012 |
NRC Officer: | Dong Park |
Last Updated: | Nov 19, 2012 |
48367 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 536632018-10-11T04:00:00011 October 2018 04:00:00
[Table view]10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Air Start Solenoid Closure Failure ENS 534012018-05-14T17:05:00014 May 2018 17:05:00 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Saltwater System Non-Conforming with Licensing Basis for Tornado Generated Missiles ENS 509612015-04-07T16:45:0007 April 2015 16:45:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Dual Unit Automatic Reactor Trips Due to a Voltage Transient Resulting in Generator Trips ENS 507522015-01-22T22:45:00022 January 2015 22:45:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Heat Exchanger Lineup Could Exceed Design Basis Temperatures ENS 498892014-03-10T20:53:00010 March 2014 20:53:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Postulated Hot Short Fire Event That Could Adversely Impact Safe Shutdown Equipment ENS 494492013-10-18T12:30:00018 October 2013 12:30:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Postulated Hot Short Fire Event That Could Adversely Impact Safe Shutdown Equipment ENS 483672012-10-03T04:10:0003 October 2012 04:10:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Due to High Energy Line Break Barrier Being Partially Open ENS 476192012-01-23T18:00:00023 January 2012 18:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Breach in High Energy Line Break Barrier ENS 475122011-12-08T22:55:0008 December 2011 22:55:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition Potentially Could Affect the Common Control Room ENS 474132011-11-03T22:00:0003 November 2011 22:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Diesel Generator Starting Air Not Compliant with Appendix R Requirements ENS 438302007-12-08T05:50:0008 December 2007 05:50:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Reactor Power Inadvertently Increased Above Accident Analysis Limit 2018-05-14T17:05:00 | |