ENS Event | |
---|---|
22:00 Oct 31, 2011 | |
Title | General Electric Cr-120B Relays Supplied by National Technical Systems Fail Bench Test |
Event Description | On October 31, 2011, NextEra Energy Seabrook, LLC completed a 10 CFR 21 evaluation of a condition associated with General Electric (GE)-CR-120B relays supplied by National Technical Systems, Inc. and intended for use at Seabrook. Six (6) Quality Level 1 GE-CR-120B relays failed bench testing. During bench testing, the subject relays failed to reset when de-energized. An evaluation was performed to determine the applications where these relays could have been and were installed and to determine if the failure of the subject relays could result in a Substantial Safety Hazard as defined in 10 CFR 21.3. The evaluation concluded that there is one safety significant application relative to the failure of the GE-CR-120B relays to reset in the Seabrook Diesel Air Handling System (DAH).
Each DAH system train (includes one supply fan and one exhaust fan per train) has one relay that provides a start permissive for the ventilation fans. An analysis of the failure of a GE-CR-120B relay in the DAH system determined that, if the relays were installed, the condition could create a substantial safety hazard due to a subsequent loss of the emergency power function. Therefore, this report is being submitted pursuant to the requirements of 10 CFR 21.21(d)(3)(i). A written notification will be made to the NRC within 30 days pursuant to 10 CFR 21.21(d)(3)(ii). No actual safety consequences resulted from this condition because the GE-CR-120B relays were not installed in the plant in this safety significant application. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Seabrook New Hampshire (NRC Region 1) | |
Reporting | |
10 CFR 21.21 | |
Time - Person (Reporting Time:+11.63 h0.485 days <br />0.0692 weeks <br />0.0159 months <br />) | |
Opened: | Michael O'Keefe 09:38 Nov 1, 2011 |
NRC Officer: | Pete Snyder |
Last Updated: | Nov 1, 2011 |
47395 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
Seabrook with 10 CFR 21.21, Notification of failure to comply or existence of a defect and its evaluation | |
WEEKMONTHYEARENS 473952011-10-31T22:00:00031 October 2011 22:00:00
[Table view]10 CFR 21.21, Notification of failure to comply or existence of a defect and its evaluation General Electric Cr-120B Relays Supplied by National Technical Systems Fail Bench Test ENS 404532004-01-15T05:00:00015 January 2004 05:00:00 10 CFR 21.21, Notification of failure to comply or existence of a defect and its evaluation Part 21 Report Involving an Undersized Emergency Feedwater Pump Shaft ENS 401592003-09-15T04:00:00015 September 2003 04:00:00 10 CFR 21.21, Notification of failure to comply or existence of a defect and its evaluation Part 21 Issue at Seabrook on Spent Fuel Pool Test Coupons 2011-10-31T22:00:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_47395&oldid=424266"