ENS 46780
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
13:21 Apr 23, 2011 | |
Title | Valid Auxiliary Feedwater Pump Start While Cooling Down Reactor |
Event Description | At 0921 [EDT] on 4/23/11, CNS Unit-1 received an auxiliary feedwater pump auto start due to low-low level in the 1B steam generator. The 1A auxiliary feedwater pump started and restored steam generator level to the normal operating band.
A cooldown was in progress at the time of the event and the tagout isolated feedwater flow to the 1B steam generator. The licensee notified the NRC Resident Inspector. The states of North and South Carolina, and York, Gaston, and Mecklenburg Counties will be notified. |
Where | |
---|---|
Catawba South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-0.73 h-0.0304 days <br />-0.00435 weeks <br />-9.99954e-4 months <br />) | |
Opened: | Donald Wisneiwski 12:37 Apr 23, 2011 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Apr 23, 2011 |
46780 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Not Critical |
Scram | No |
Before | Hot Shutdown (0 %) |
After | Hot Shutdown (0 %) |
WEEKMONTHYEARENS 570262024-03-13T01:11:00013 March 2024 01:11:00
[Table view]10 CFR 50.72(b)(3)(iv)(A), System Actuation Loss of Power to Containment Radiation Monitors ENS 561772022-10-24T12:57:00024 October 2022 12:57:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip and Auxiliary Feedwater System Actuation ENS 558562022-04-23T06:24:00023 April 2022 06:24:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip During Control Rod Testing ENS 555492021-10-27T18:29:00027 October 2021 18:29:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Actuation of the 1B EDG Load Sequencer on Bus Undervoltage Condition ENS 552292021-05-01T11:55:0001 May 2021 11:55:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip and Actuation of the Auxiliary Feedwater System ENS 543072019-10-02T08:15:0002 October 2019 08:15:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Actuation of Containment Spray System ENS 532712018-03-19T07:29:00019 March 2018 07:29:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unplanned Actuation of Auxiliary Feedwater System During Maintenance ENS 467802011-04-23T13:21:00023 April 2011 13:21:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid Auxiliary Feedwater Pump Start While Cooling Down Reactor ENS 435972007-08-25T14:58:00025 August 2007 14:58:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Autostart of All Emergency Diesel Generators Due to a Grid Disturbance ENS 412462004-12-06T02:35:0006 December 2004 02:35:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Turbine Trip/Reactor Trip Due to Moisture Separator Reheater (Msr) High Level Trip Signal. ENS 411542004-10-28T04:52:00028 October 2004 04:52:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip After Shutdown Bank Dropped Into Core ENS 405382004-02-22T22:30:00022 February 2004 22:30:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unit 1 Manually Tripped After the "B" Sg Feedwater Isolation Valve Failed Closed ENS 401142003-08-29T06:03:00029 August 2003 06:03:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Catawba Unit 1 Automatic Reactor Trip Due to Reactor Protection System Actuation 2024-03-13T01:11:00 | |