ENS 41447

From kanterella
Jump to navigation Jump to search
ENS 41447 +/-
Where
Point Beach NextEra Energy icon.png
Wisconsin (NRC Region 3)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-1.48 h-0.0617 days <br />-0.00881 weeks <br />-0.00203 months <br />)
Opened: Jack Gadzala
16:29 Feb 27, 2005
NRC Officer: Bill Huffman
Last Updated: Feb 27, 2005
41447 - NRC Website