ENS Event | |
---|---|
14:24 Oct 15, 2003 | |
Title | a Manual Reactor Trip from 1% Power as Per Abnormal Operating Procedures Occurred |
Event Description | The plant was in mode 2 (1% power) making preparations to place the unit on-line per procedures. At 0921, the plant had entered ER-SC.1, Adverse Weather Plan, due to sustained winds greater than 55 mph. At 1024, offsite power circuit "751" was lost due to offsite storm damage(tree down on powerline). The loss of circuit "751" led to the loss of the "B" reactor coolant pump on undervotltage. Procedure AP-RCS.2, loss of Reactor Coolant flow was entered. At 1026 a manual Reactor Trip was initiated as directed by procedures. All rods fully inserted, no ECCS injection or safety valves lifted and all ESF systems functioned as designed. Due to the partial loss of offsite power, the "B" emergency diesel auto started and loaded to supply safeguards equipment. The "A" and "B" aux feedwater pumps also auto started. Offsite power was restored to safeguards equipment being supplied power by the "B" emergency diesel within 15 minutes from the second offsite power line.
The NRC Resident inspector was notified. |
Where | |
---|---|
Ginna New York (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
Time - Person (Reporting Time:+-0.98 h-0.0408 days <br />-0.00583 weeks <br />-0.00134 months <br />) | |
Opened: | Robert Mccoy 13:25 Oct 15, 2003 |
NRC Officer: | Chauncey Gould |
Last Updated: | Oct 15, 2003 |
40248 - NRC Website | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | Yes, Manual Scram |
Before | Startup (1 %) |
After | Hot Standby (0 %) |
Ginna with 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
WEEKMONTHYEARENS 567902023-10-13T01:27:00013 October 2023 01:27:00
[Table view]10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Manual Reactor Trip ENS 567312023-09-09T15:43:0009 September 2023 15:43:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip ENS 555042021-10-04T04:31:0004 October 2021 04:31:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Valid System Actuation ENS 536962018-10-26T04:00:00026 October 2018 04:00:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness Automatic Start of the Emergency Diesel Generator and Loss of Radiation Monitor ENS 517302016-02-12T04:05:00012 February 2016 04:05:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Generator Auto-Started Due to the Loss of a Station Service Transformer ENS 492142013-07-24T18:19:00024 July 2013 18:19:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip from Full Power ENS 479882012-06-03T06:39:0003 June 2012 06:39:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Autostart of "B" Edg Due to Loss of Offsite Power Circuit 767 ENS 473382011-10-12T03:28:00012 October 2011 03:28:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Turbine Auto Stop Valve Closure ENS 469172011-06-03T04:39:0003 June 2011 04:39:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Unexpected Emergency Diesel Generator Actuation ENS 432432007-03-17T02:09:00017 March 2007 02:09:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Caused by Safety Injection Signal ENS 431282007-01-28T01:40:00028 January 2007 01:40:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Automatic Reactor Trip Due to Loss of Load Transient Caused by Ehc Problem ENS 417652005-06-10T17:51:00010 June 2005 17:51:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Loss of Offsite Bus Due to a Lighting Strike with Actuation of Emergency Diesel Generator ENS 415582005-04-01T19:02:0001 April 2005 19:02:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Emergency Diesel Generator Start Due to a Partial Loss of Offsite Power ENS 414142005-02-17T02:12:00017 February 2005 02:12:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation Reactor Trip Due to Turbine Trip as a Result of Failed Power Supply ENS 403192003-11-13T14:54:00013 November 2003 14:54:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation Auto Start and Loading of the "B" Emergency Diesel Generator ENS 402482003-10-15T14:24:00015 October 2003 14:24:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(3)(iv)(A), System Actuation a Manual Reactor Trip from 1% Power as Per Abnormal Operating Procedures Occurred 2023-09-09T15:43:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_40248&oldid=428924"