MONTHYEARDCL-2019-521, Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant2019-08-20020 August 2019 Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant ML16048A2182015-11-10010 November 2015 Compress Air Energy Storage (Caes) ML15160A2362015-07-0101 July 2015 Enclosures Drawing/Map for All DCPP (2015) Environmental Report ML16048A2052015-06-30030 June 2015 Storm Water Pollution Prevention Plan DCL-2015-525, Marine Mammal Stranding Report (Sea Lion)2015-05-27027 May 2015 Marine Mammal Stranding Report (Sea Lion) ML14364A2652014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 1 of 4 ML14364A2662014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 2 of 4 ML14364A2692014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 3 of 4 DCL-14-103, License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 42014-12-22022 December 2014 License Renewal Application Appendix E Applicant'S Environmental Report - Operating License Renewal Stage Amendment 1. Part 4 of 4 DCL-2014-523, Submittal of NOAA Form 89-864 Marine Mammal Stranding Report (Sea Lion)2014-06-17017 June 2014 Submittal of NOAA Form 89-864 Marine Mammal Stranding Report (Sea Lion) DCL-2014-517, Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant2014-04-17017 April 2014 Letter from Kenneth W. Cortese Report on Discharge Monitoring at Diablo Canyon Power Plant ML16048A2862013-12-31031 December 2013 CEC-1304 Schedule 3 Part a (Page 1), Year 2013. Part 2 of 2 DCL-13-045, Annual Nonradiological Environmental Operating Report2013-04-30030 April 2013 Annual Nonradiological Environmental Operating Report DCL-12-042, 2011 Annual Nonradiological Environmental Operating Report2012-04-30030 April 2012 2011 Annual Nonradiological Environmental Operating Report ML16048A2142011-03-0707 March 2011 2010 Air Emission Inventory Report DCL-2010-505, 2010 Annual Sea Turtle Report for Diablo Canyon Power Plant2011-01-28028 January 2011 2010 Annual Sea Turtle Report for Diablo Canyon Power Plant DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-32011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-3 DCL-11-005, Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization2011-01-0707 January 2011 Diablo Canyon, Units 1 and 2, Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization DCL-11-005, Report on the Analysis of the Shoreline Fault Zone, Appendix C, Seismicity Reviews Through Appendix D, Potential Field Data - Magnetic Surveys2011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix C, Seismicity Reviews Through Appendix D, Potential Field Data - Magnetic Surveys ML1101404142011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix I, Identification, Mapping, and Analysis of Offshore Wave-Cut Platforms and Strandlines (Paleoshorelines) in the Shoreline Fault Zone Study Area ML1101404122011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix E, Potential Field Data - Gravity Surveys - Appendix H, High Resolution Marine Seismic Reflection Surveys ML1101404202011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Chapter 6.0 - Seismic Hazard Analysis - Appendix A-3 ML1101404082011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Appendix B, Onshore-Offshore Geologic Map the Shoreline Fault Zone Study Area ML1101404252011-01-0707 January 2011 Report on the Analysis of the Shoreline Fault Zone, Central Coastal California, Table of Contents Through Chapter 5.0 - Seismic Source Characterization ML16048A2842010-12-31031 December 2010 CEC-1304 Schedule 3 Part a (Page 1), Year 2010. Part 1 of 2 DCL-10-124, Information to Support NRC Review of DCPP License Renewal Application (LRA) Environmental Report - Operating License Renewal Stage2010-10-27027 October 2010 Information to Support NRC Review of DCPP License Renewal Application (LRA) Environmental Report - Operating License Renewal Stage DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish2009-12-31031 December 2009 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish ML11166A1532009-12-31031 December 2009 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report,Technical Data Report, Impingement of Fish and Shellfish DCL-10-083, Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock2008-12-31031 December 2008 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock ML11166A1512008-12-31031 December 2008 Diablo Canyon Power Plant (Dcpp), Units 1 & 2, Renewal Feasibility Study, Environmental Report, Technical Data Report, Heat Shock ML16050A2922008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 2 of 2 ML16050A2912008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 1 of 2 DCL-2008-508, Marine Mammal and Marine Turtle Stranding Report for a Dead California Sea Lion (Zalophus Californianus) Discovered in the Power Plant Intake Structure2008-02-15015 February 2008 Marine Mammal and Marine Turtle Stranding Report for a Dead California Sea Lion (Zalophus Californianus) Discovered in the Power Plant Intake Structure DCL-2008-504, 2007 Annual Sea Turtle Report2008-01-29029 January 2008 2007 Annual Sea Turtle Report DCL-2007-535, National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure2007-08-0909 August 2007 National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure DCL-07-049, Annual Nonradiological Environmental Operating Report2007-04-26026 April 2007 Annual Nonradiological Environmental Operating Report DCL-2006-511, Annual Summary Report on Discharge Monitoring at the Diablo Canyon Power Plant for 20052006-02-27027 February 2006 Annual Summary Report on Discharge Monitoring at the Diablo Canyon Power Plant for 2005 DCL-05-002, Appendix a, Rupture Process of the 2003 San Simeon Earthquake.2004-11-30030 November 2004 Appendix a, Rupture Process of the 2003 San Simeon Earthquake. DCL-04-071, Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake2004-06-0707 June 2004 Update to the Seismicity Evaluation of the December 22, 2003 San Simeon Earthquake ML0312500752003-04-25025 April 2003 Annual Nonradiological Environmental Operating Report ML0229503042002-10-15015 October 2002 ISFSI Safety Analysis Report - Amendment 1 to Diablo Canyon Independent Spent Fuel Storage Installation Submittal of License Application Amendment 1, Table 4.3-1 - Section 8.2.2 DCL-02-051, 2001 Annual Radiological Environmental Operating Report2002-04-30030 April 2002 2001 Annual Radiological Environmental Operating Report ML0203003982001-12-21021 December 2001 Part 1 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports ML0203004112001-12-21021 December 2001 Part 2 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports, Photographs of Core Boxes ML0203004332001-12-21021 December 2001 Part 3 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports. Attachment 1: Field Boring Logs in ISFSI Study Area ML0203004422001-12-17017 December 2001 Part 4 of 5, Diablo Canyon Independent Spent Fuel Storage Installation, Submittal of Geologic Data Reports. Data Report D: Trenches in the ISFSI Study Area ML0203100092001-12-17017 December 2001 Data Report F: Field Discontinuity Measurements, Diablo Canyon ISFSI, Book 3 of 4 2019-08-20
[Table view] Category:Letter type:DCL
MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] |
Text
/PBJ!J;ffffffc {!;BJ$ aJUOrdf
. !EU~u:Utrffff: C@Ul!Dff>>BltmJ/ C IDlialbJ!o ieafil'\lfil IJllower IP'!auJ1t P. 0. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-2019-521 Certified/Return Receipt
- 7014-2120-0004-6299-8333 August 20, 2019 Justin Viezbicke California Stranding Network Coordinator NOAA Fisheries 501 West Ocean Blvd., Suite 4200 Long Beach, California 90802-4213 Sea Turtle Stranding Report (Green Sea Turtle) Diablo Canyon Power Plant Enclosed is NOAA Fisheries West Coast Sea Turtle Stranding Report (Copy) for a sea .turtle discovered in the Diablo Canyon Power Plant (DCPP) intake structure. This report was previously provided to NOAA Fisheries by the Marine .Mammal Center (MMC) Morro Bay which managed the specimen following recovery from the power plant intake structure.
On July 26, 2019, a live sea turtle was discovered by commercial divers at approximately 13:04 hours. within the power plant intake structure 2-5 forebay.'The turtle was subsequently identified as a green sea turtle (Che/onia mydas). '
As authorized in* DCPP's incidental take statement issued September 18, 2006, facility staff removed the turtle from the intake structure forebay that afternoon (July 25th) and transferred the turtle to the management and care of MMC staff at the direction of NMFS. The turtle was removed using a netted platform, then transported from the intake structure in the bed of a truck. Photographs taken of the recovered turtle are enclosed.
MMC transferred the turtle to the Aquarium of the Pacific in Long Beach, CA on July 25th for further examination, assessment, and eventual release (l?cheduled for Thursday, August 15).
The aquarium measured the turtle's weight at 22.7 kilograms and shell length (notch-tip) at 64.3 centimeters, and noted the animal appeared to be in average health based on visual observation. There were no apparent abrasions or indication of any injury. The turtle was transferred to MMC staff for initial transport to the Morro Bay Care facility and later to the
- Aquarium of the Pacific. The turtle was tagged by Aquarium staff on the right front flipper with Tag 4810705765. Discovery and disposition of the turtle was reported by MMC to NOAA Fisheries on July 26, 2019, within the required 48-hour facility reporting period.
Live green sea turtles have been discovered at DCPP's intake structure on twelve previous occasions during commercial operations: September 22, 2014, September 21, 2012, August 08, 2010, September 08, 2009, July 23, 2007, February 27, 2001, April 16, 2000, August 24, 1999, May 29, 1999, June 12, 1997, January 10, 1997, and April 27, 1994. Green sea turtles are infrequently observed in the coastal waters in the vicinity of the power plant.
( ...
If ydu have any questions or concerns regarding the enclosed report, or require additional information, please contact Ninah Rhodes Hartley at (805) 545-3326.
Sincerely, J.JJ)r-David Cortina Manager - Chemistry and Environmental Operations 2019521/bkc/nrh Enclosures (2)
PG&E Letter DCL-2019-521 Justin Viezbicke, NOAA Fisheries August 20, 2019 cc w/en<;;losures: Balwant K. Singal NRR Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 8 H4A 11555 Rockville Pike Rockville, MD 20852-2738 Chris Newport NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Scott Morris Regional Administrator
- Licensing Assistant, Operations Branch U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard., Suite 400 Arlington, TX 76011-4511 U.S. Nuclear Reg1,1latory Commission Document Control Desk Washington, D.C. 20555-0001 Marine Region California Department of Fish and Wildlife 20 Lower Ragsdale Dr. Suite 100 Monterey, CA 93940 Robin LeRoux National Marine Fisheries Service Southwest Fisheries Science Center 8901 La Jolla Shores Drive La Jolla, CA 92037
August 20, 2019 Enclosure 1 Copy NMFS Stranding Report Green Sea Turtle (Chelonia mydas)
Diablo Canyon Power Plant (DCPP) - July 26, 2019 Report Generated by Marine Mammal Center (MMC) Morro Bay
- _.:1n *.o.rJiiaii:fW~ihJiigfon:c11i:k io.submfffo'> .
. '._.:-\\ : *.K~~:tin:W.ii~iri~~~@NqM.:g6{.. _ i:'.*. :.
Revised 10/18/2016 U.S.
- WEST COAST SEA TURTLE STRANDING REPORT FIELD# ST- °'J 't NMFSREGIONAL#- - - - - - - - - - Other# f,;vr L'/fJ 1f'tDL DATEINITIALLYOBSERVED:' .Jl'L ~,£ 20J_.9_ DATEEXAMINED: ~]_ ~~ 20J_'7 RESTRANDER? 0 Month Dny Year Moll th D.ay Year INITALLY OBSERVED BY: ~~-n~ - ""b,c..\?\o c gt,-!CJfl EXAMINED BY: \J\ e,~ct \- \:>,a no..,~ rct-""'-er 1~J;;;r~~"\,.~"'~o.e.~ ,
'le. (: - f ?e,\(
Phone ('8055"15-LfL/01* Email 1J IA Phone ~):l:1:l..- s.soo Email \.,e;n:;v::fJiU"d@_+/-rom<:-*"~
D Private citizen D Beach official O Stranding newiork member Affiliallon._:"t__,__,_M'--'-Lrvl-"--"'C...=-------------- J SPECIES: OUnidentified LOCATION: Checkoneoption. 0Beached ~loa!inginwater A G reeo CilY. Avi ICl 13l'Cl C.h . county San LI.A./':::.. ol:::,1' ~70 state_(_ _
Commonname Localitydetai!s(bespecific): 'l>,o.\o\D (D.O'-Jt?C\ 'fo:a:bo.... . .,1 / \KJ-\-a.~e.
Genus Spe!bci Dig~tal phot?s taken: ¥es P ~q Latitude :2L 5 .~J_ ~~ "-N--Longitude- I ';}...Q.. ll..5..x.'i?. "ifrRacord in decimal degrees.
Venfredby:Pf'-\.Wa: ~ 1-\u.-.";> Howdetennined(checkone): OGPS 0Map ~temet/software r-~ ~~c,,..\e fV\C,OS AGE: (NMFS Us11 Only) J J D Hatchling D Immature SEX: D Male D Female *-i;;a_'Unknown MEASUREM~S: D Whole carcass 0Partia. Uscavenged D Adult D Unknown Does tail extend beyond carap{ce?' Body weight l,'2.l_Actual D Estimate '2. '2 ;] kg D Yes D No CARAPACE:
CO)JDITI ON: How was sex determined? Curved Carapace Length (nuchal notch to tip) 11;<-I . ~ cm
, :Ef-:1.= Alive D Tail length D Penis D Necropsy Curved Carapace Width (at widest point) bo, b cm D 2::: Fresh dead 1-------------; Straight Carapace Length D Calipers &Tape ~ Q , S'" cni D 3 = Moderate decomposition BOD)' CONDITION: Straight Carapace Width D Calipers~Tape {d---Z. J cm D 4::: Advanced decomposmon D 1 =Poor D 4 =Good TAIL:
0 5 = Dried mummified/ skeleton O 2 = Fair D 5 = Excellent End of plastron to !ail tip (ventral side) I S:: cm D 6 =Unknown Gondition (== :~~*~erag~) . q 6= Unknown Cloaca to tail tip (ventral side) ? .6 cm TAGS: Contar:tNMFSbeforedisposingofanytag[!!!panimalll HUMAN INTERACTION: 0 Yes O No Ocanno!BeDeterrnined .
FLIPPER: Existing metal fags present? D Yes ~ o If yes, choose one or more. De.scribe and draw on diagram on back of page.
Tag# left/ Right _ _._Front/ Rear D 1 = Boat collision _ _ _ _ _ _ _ _*_ _ _ _ _ _ _ _ __
Tag# left/ Right _ _ Front/Rear D 2 =Shot _ _ _ _= - - - - : = - - - - - - - - , = - - - - - = , - - - -
Retum address: D 3:: Fishery interaction D Hook D Monofilament O Braided line D Netting Evidence of old fag holes/ rips in flippers D Yes O No !:I)= Oiled - - - - - - = - - - , - - ~ - - - - - - - -
If yes, draw on diagram on back of page. ~ * ~ Power plant entrainment* hw.,\:.,o...'I / 1 o ~ 6 lL..12.. u.:ce a PIT: Existing PIT tags pres~! D Yes No D 6:: Other ~
Scanner type: DAVID niversa! tag reader How determined? D External exam O!ntemal exam D Necropsy PIT tag#
- Evidence collected? D Yes D No Describe
- Location: _J,eftl Right _ _ Front/ Rear Storage localion_ _ _ _ _ _ _-.::=,--=-------'------
PIT tag# Digital photos sent to NMFS coordinator? ijfYes D No Loca!lon: _Leff/ Right ~Front/ Rear APPLl~D NEW TAGS (live turtle): ~*~Yes !J.tlo t-0-T-H-ER-FI_N_D_IN_G_S_:-0-Y-es~~~--0-C_an_n-ot_B_eD-e-te-rm-in-ed-----1 Tag # lf/3/o 7:DSr/p.5" Le RI - - ~ Rear If.yes, choose one or more. Describe and draw on diagram on back of page.
Tag# left/ 1ght _ _ Front/Rear D 1=Disease PIT tag# 02=Trauma~-------.---------
location: __J_eft/ Right _Front/ Rear D 3 == Cold stunning _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
PIT tag# D 4 = Other,_--=,------c--~--------==-------
Locatlon: _Leff/ Right _Front/ Rear How detennined? 0 External exam D Internal exam D Necropsy AL DISPOSITION: Check all that apply.
- 1 = Al!ve, released O At site .~Relocated 2
- :: Ahve, transferred to rehab1lfaiion Date 7/2/a ff7 i . lffishery interaction, giseetangled prior to release? O Yes D No Facility __:__t'<.":f1tun e, £ f/..g /a(~; 4c* .
D 3 = Euthanized at site By ' Carcass d' osition
- D 4 = Dead, left at site Marked? D Yes 0No How? '-------------------
0 5 = Dead, buried: D On beach D Off beach Where?_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
0 6 = Dead, salvaged: 0 Whole carcass O Part(s) D Frozen for later exam Please note all specimens collected and disposition on baclr.
D 7 = Necropsied; 0 Field D L~boratory Date By:_ _ _ _ _ _ _ _ _ __
D 8 = Leftfloating, not recovered Why?_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 1 D 9 = D!spositlon unknown Explain: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
PG&E Letter DCL-2019-521 August 20, 2019 Enclosure 2 Specimen Photographs - Green Sea Turtle (Che/onia mydas)
Diablo Canyon Power Plant (DCP~)- July 26, 2019 Photographs Page 1 of 1