DCL-19-085, Material Status Report for the Period Ending August 31, 2019

From kanterella
Jump to navigation Jump to search
Material Status Report for the Period Ending August 31, 2019
ML19290F891
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/17/2019
From: Harbor C
Pacific Gas & Electric Co
To: Cettin J
Document Control Desk, Office of Nuclear Reactor Regulation, US Dept of Energy (DOE)
References
DCL-19-085
Download: ML19290F891 (2)


Text

m Pacific Gas and Electric company"'

Cary D. Harbor Station Director Diablo Canyon Power Plant Mail code 104/5/502 P.O. Box 56 Avila Beach, CA 93424 805,545.4102 Internal: 691.4102 Fax: 805.545.4234 October 17, 2019 PG&E Letter DCL-19-085 John Cettin NMMSS Program, NA-532 Germantown Building U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585-1290 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Material Status Report for the Period Ending August 31, 2019

Dear Mr. Cettin:

Pursuant to 10 CFR 74.13, Enclosure 1 provides completed Forms DOE/NRC-742, "Material Balance Report," and DOE/NRC-742C, "Physical Inventory Listing." The data on these forms provide inventory balances at Diablo Canyon Power Plant (DCPP) Units 1 and 2 (RIS:XHC) for the period ending August 31, 2019, for the following nuclear materials: enriched uranium fuel, plutonium in fuel, depleted uranium in fuel, and enriched uranium in neutron flux detectors.

Pursuant to 10 CFR 74.15, Enclosure 2 provides a Form DOE/NRC-741, "Nuclear Material Transaction Report." This transaction report reflects normal operational use of enriched uranium, and the production, fission, and decay of plutonium at DCPP Units 1 and 2 for the period ending August 31, 2019.

Enclosure 3 provides a personal computer disk transmittal form containing information on the data files for the above forms. The files were prepared in accordance with NMMSS Report D-24, "Personal Computer Data Input for NRC Licensees," dated August 1, 2016.

Pacific Gas and Electric Company makes no new or revised regulatory commitments (as defined by NEI 99-04) in this report.

If you have any questions regarding the enclosures, please contact Mr. Gregory V. Johnson at (805) 545-4376.

A member of the STARS Alliance Callaway

  • Di ablo Canyon
  • Palo Verde
  • Wolf Creek

Mr. John Cettin PG&E Letter DCL-19-085 October 17, 2019 Page 2 Sincerely,

~

Ad<:,.,.,,-- ~~~ I Cary D. Harbor Station Director armb/4743 Enclosures cc: Diablo Distribution Scott A. Morris, NRC Region IV Administrator Balwant K. Singal, NRR Senior Project Manager John Reynoso, NRC Senior Resident Inspector (Acting)

NRC Document Control Desk A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek