DCL-19-024, and Humboldt Bay Power Plant 2019 Annual Statement of Insurance

From kanterella
Jump to navigation Jump to search
and Humboldt Bay Power Plant 2019 Annual Statement of Insurance
ML19087A298
Person / Time
Site: Diablo Canyon, Humboldt Bay
Issue date: 03/28/2019
From: Welsch J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
DCL-19-024, HBL-19-008
Download: ML19087A298 (2)


Text

m Pacific Gas and Electric Company 0

James M. Welsch Vice President Nuclear Generation and Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Chief Nuclear Officer 805.545.3242 E-Mail: James.Welsch@pge.com March 28, 2019 PG&E Letter DCL-19-024 PG&E Letter HBL-19-008 U.S. Nuclear Regulatory Commission 10 CFR 50.54 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 2019 Annual Statement of Insurance for Pacific Gas and Electric Company's Diablo Canyon Power Plant and Humboldt Bay Power Plant

Dear Commissioners and Staff:

As required by 10 CFR 50.54(w)(3), listed below is the annual reporting of nuclear property insurance coverage with Nuclear Electric Insurance Limited (NEIL) and European Mutual Association for Nuclear Insurance (EMANI) for the Diablo Canyon Power Plant (DCPP) and Humboldt Bay Power Plant (HBPP):

ln_s urer(s)ffype of _Policy Policy Policy

  • Plant Covera e Limits Number Period DCPP NEIL & EMANI /Primary $1,500,000,000 P19-027 04/01 /19 to 4/01 /20 A14/1006/

2019/1 NEIL Blanket Excess $1,250,000,000 BX19-007 04/01 / 19 to 4/01 /20 TOTAL $2,750,000,000 HBPP NEIL Primary $ 131,100,000 P19-028 04/01 /19 to 4/01 /20 Pacific Gas and Electric Company (PG&E) procures from EMANI an additional

$200,000,000 of Property Damage coverage in excess of the stated NEIL limits.

The Policy Number is A 14/1006/2019/0 for the Policy Period from April 1, 2019, to April 1, 2020.

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Document Control Desk PG&E Letter DCL-19-024 March 28, 2019 PG&E Letter HBL-19-008 Page 2 PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions regarding this information, please contact Ms. Janaize Markland at (415) 973-8756.

Sincerely,

&-~

James M. Welsch Vice President, Nuclear Generation and Chief Nuclear Officer cc: Robert J. Evans, NRC Region IV Inspector John B. Hickman, NRC Reactor Decommissioning Branch Project Manager Janaize Markland, PG&E Director, Enterprise Risk Management Scott A. Morris, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Jennifer K. Post, PG&E Law Balwant K. Singal, NRC Project Manager .

Diablo Distribution Humboldt Distribution A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek