Category:TSTF

From kanterella
Jump to: navigation, search

for TSTF

This category uses the form TSTF.

B&W-L-LP [For B&W-L-LP]
B&W-R-LP [For B&W-R-LP]
CE [For CE]
GE-2 [For GE-2]
GE-3 [For GE-3]
GE-4 [For GE-4]
GE-5 [For GE-5]
GE-6 [For GE-6]
W-AP1000 [For W-AP1000]
Westinghouse PWR 2-Loop [For Westinghouse PWR 2-Loop]
Westinghouse PWR 3-Loop [For Westinghouse PWR 3-Loop]
Westinghouse PWR 4-Loop [For Westinghouse PWR 4-Loop]
 TitleIOW
TSTF-448Control Room Habitability140565
TSTF-425Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B82425
TSTF-493Clarify Application of Setpoint Methodology for LSSS Functions57387
TSTF-523Generic Letter 2008-01, Managing Gas Accumulation38290
TSTF-510Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection3664
TSTF-449Steam Generator Tube Integrity35142
TSTF-419Revise PTLR Definition and References in ISTS 5.6.6, RCS PTLR3040
TSTF-545TS Inservice Testing (IST) Program Removal2872
TSTF-511Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262771
TSTF-479Changes to Reflect Revision of 10 CFR 50.55A2620
TSTF-497Limit Inservice Testing Program SR 3.0.2 Application to Frequencies of 2 Years or Less2510
TSTF-535Revise Shutdown Margin Definition to Address Advanced Fuel Designs2540
TSTF-522Revise Ventilation System Surveillance Requirements to Operate for 10 Hours PER Month2090
TSTF-490Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec1781
TSTF-501Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control16111
TSTF-372Addition of LCO 3.0.8, Inoperability of Snubbers1670
TSTF-475Control Rod Notch Testing Frequency and SRM Insert Control Rod Action1580
TSTF-427Allowance for Non Technical Specification Barrier Degradation on Supported System Operability1550
TSTF-513Revise Operability Requirements and Actions for RCS Leakage Instrumentation1550
TSTF-495Bases Change to Address GE Part 21 SC05-031400
TSTF-363Revise Topical Report References in ITS 5.6.5, Colr1330
TSTF-439Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO12101
TSTF-529Clarify Use and Application Rules1140
TSTF-312Administratively Control Containment Penetrations1140
TSTF-359Increase Flexibility in Mode Restraints1130
TSTF-505Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B10223
TSTF-360DC Electrical Rewrite1074
TSTF-343Containment Structural Integrity1011
TSTF-447Elimination of Hydrogen Recombiners and Change to Hydrogen and Oxygen Monitors1010
TSTF-514Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation1020
TSTF-542Reactor Pressure Vessel Water Inventory Control10140
TSTF-340Allow 7 Day Completion Time for a TURBINE-DRIVEN AFW Pump Inoperable910
TSTF-374Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil821
TSTF-484Use of TS 3.10.1 for SCRAM Time Testing Activities833
TSTF-52Implement 10 CFR 50, Appendix J, Option B810
TSTF-426Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B and 6C810
TSTF-284Add Met Vs. Perform to Specification 1.4, Frequency710
TSTF-491Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications750
TSTF-308Determination of Cumulative and Projected Dose Contributions in Recp710
TSTF-248Revise Shutdown Margin Definition for Stuck Rod Exception611
TSTF-412Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable601
TSTF-163Minimum Vs. Steady State Voltage and Frequency610
TSTF-485Correct Example 1.4-1620
TSTF-258Changes to Section 5.0, Administrative Controls600
TSTF-283Modify Section 3.8 Mode Restriction Notes620
TSTF-418RPS and ESFAS Test Times and Completion Times - WCAP-14333650
TSTF-423Technical Specifications End States, NEDC-32988-A660
TSTF-269Allow Administrative Means of Position Verification for Locked or Sealed Valves510
TSTF-330Allowed Outage Time - Ultimate Heat Sink510
TSTF-273SFDP Clarifications510
... further results

Pages in category "TSTF"

The following 200 pages are in this category, out of 540 total.

(previous page) (next page)

T

(previous page) (next page)