Category:Letter type:GO
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:GO"
The following 200 pages are in this category, out of 736 total.
(previous page) (next page)G
- GO2-00-038, Independent Spent Fuel Storage Installation 2004 Annual Operating Report
- GO2-00-086, Change in Distribution
- GO2-02-013, Security & Training Qualification Plan, Revison 13
- GO2-02-014, License Amendment Request - Alternative Source Term Proprietary Versions of Ph & MSLB Calculations
- GO2-02-015, License Amendment Request - Alternative Source Term Non-Proprietary Versions of Ph and MSLB Calculations
- GO2-02-016, Operating License NPF-21 Reply to Final Significance Determination for a Yellow Finding and Notice of Violation (NRC IR 05000397/2001-008)
- GO2-02-023, Physical Security Plan, Revision 46
- GO2-02-024, Response to NRC Request for Additional Information Re Request for Amendment Re Unisolable Drain Line Between Control Rod Drive/Condensate Pump & Reactor Core Isolation Cooling Pump Rooms
- GO2-02-027, Station'S Clarification and Response Regarding NRC IR 05000397/2001-008 and Final Significance Determination Letter
- GO2-02-035, Emergency Response Data System, Change to Data Point Library
- GO2-02-036, Annual Operating Report 2001
- GO2-02-046, Incoming - J.V. Parrish-Columbia GS-Reply to Response to Order for Interim Safeguards and Security Compensatory Measures
- GO2-02-047, 2001 Annual Environmental Operating Report
- GO2-02-049, Request for Enforcement Discretion Re Technical Specification Completion Time for Inoperable Primary Containment Isolation Valves
- GO2-02-051, Submittal of Financial Protection Amounts for Columbia Generating Station
- GO2-02-054, 14-Day Follow-up Report Regarding a Violation of Operating License Condition 2.E
- GO2-02-087, Letter Discussing Columbia Generating Station License Amendment Request - Alternative Source Term & the Need for Approval by November 2002
- GO2-02-112, License Amendment Request - Alternative Source Term, Non-Proprietary Versions of CRDA, FHA & LOCA Calculations
- GO2-02-113, 2002 Exercise Scenario Submittal
- GO2-02-115, NRC Inspection Report Notice of Violation Response Extension
- GO2-02-119, License Amendment Request - Alternative Source Term, Proprietary Version of LOCA Calculation
- GO2-02-134, Energy Northwest, Docket No. 50-397, NRC Inspection Report 50-397/02-05, Response to Notice of Violation
- GO2-02-135, Revised Request for Amendment on the Alternate Source Term
- GO2-02-136, License Amendment Request - Alternative Source Term Response to Request for Additional Information
- GO2-02-138, (WNP-2) Application for Amendment to License NPF-21, for Three Changes to Technical Specifications 4.2.1 & 5.6.5.b
- GO2-02-142, Report of Compliance with Interim Safeguards and Security Compensatory Measures
- GO2-02-145, Commitment Related to Inservice Inspection Program Plan Relief Request 2ISI-25
- GO2-02-158, Physical Security Plan, Revision 48
- GO2-02-159, Report of Pipe Wall Thinning Examination Results
- GO2-02-160, Changes to Distribution List
- GO2-02-165, Registration of Spent Fuel Cask Use
- GO2-02-166, Operating License NPF-21, Transmittal of Revision 34 to the Columbia Generating Station Emergency Plan
- GO2-02-167, 14-Day Follow-Up Report Pursuant to Operating License Condition 2.F
- GO2-02-177, Registration of Spent Fuel Cask Use
- GO2-02-181, Written Follow-up Report Pursuant to Operating License NPF-21 Condition 2.F
- GO2-02-189, Registration of Spent Fuel Cask Use
- GO2-02-192, Request for Amendment to TS 4.2.1 and 5.6.5.b, Corrections to Original Submittal
- GO2-02-193, 14 Day Follow Up Report Pursuant to Operating License Condition 2.F
- GO2-02-199, Guarantee of Payment of Deferred Premium
- GO2-02-201, Registration of Spent Fuel Cask Use
- GO2-03-007, 2002 Annual Financial Report for Columbia Generating Station
- GO2-03-016, Schedule for Achieving Compliance with Compensatory Measures Related to Access Authorization
- GO2-03-029, Request for Enforcement Discretion from Technical Specification 3.8.1, A.C. Sources - Operating.
- GO2-03-036, Annual Environmental Operating Report
- GO2-03-038, Transmittal of Columbia Generating Station Radioactive Effluent Release Report for 2002
- GO2-03-040, Annual Operating Report 2002
- GO2-03-055, Level of Financial Protection Annual Reporting Requirement
- GO2-03-063, Request for Amendment to Technical Specification 4.2.1 & 5.6.5.b, Corrections to Original Submittal
- GO2-03-075, Clarification to Response to Order for Compensatory Measures Related to Access Authorization
- GO2-03-082, Docket No. 50-397; Updated Report of Service Water System Pipe Wall Thinning
- GO2-03-126, July 2003 Monthly Operating Report for Columbia Generating Station
- GO2-03-134, Physical Security Plan, Revision 50
- GO2-03-138, Fitness-for-Duty Semi-Annual Performance Data Report, 01/01 - 06/30/2003
- GO2-03-146, August 2003 Monthly Operating Report for Columbia Generating Station
- GO2-03-147, Inservice Inspection Summary Report for Refueling Outage R-16
- GO2-03-149, Response to to NRC Regulatory Issue Summary 2003-14
- GO2-03-158, September 2003 Monthly Operating Report for Columbia
- GO2-03-165, Reduction of Commitment to the Operational Quality Assurance Program Description
- GO2-03-166, Report of Compliance with Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Security Force Personnel
- GO2-03-170, October 2003 Monthly Operating Report for Columbia Generating Station
- GO2-03-177, Guarantee of Payment of Deferred Premium
- GO2-03-182, November 2003 Monthly Operating Report for Columbia Generating Station
- GO2-03-185, Implementation of the Performance Demonstration Methods Supplement Ten (10) Qualification Requirements for Dissimilar Metal Welds.
- GO2-03-187, Letter of Intent to Participate in Probabilistic Risk Assessment Quality Pilot Application Program
- GO2-04-002, Response to NRC Bulletin 2003-04, Rebaselining of Data in the Nuclear Materials Management and Safeguards System
- GO2-04-006, December 2003 Monthly Operating Report for Columbia Generating Station
- GO2-04-012, Transmittal of 2003 Annual Financial Report
- GO2-04-017, Report of Compliance with Compensatory Measures Related to Access Authorization
- GO2-04-020, Schedule for Achieving Operable Oscillation Power Range Monitors
- GO2-04-023, January 2004 Monthly Operating Report for Columbia Generating Station
- GO2-04-031, Transmittal of Fitness-for-Duty Semi-Annual Performance Data Report, July 1 - December 31, 2003
- GO2-04-032, Schedule for Requesting Revision of Technical Specification P/T Curves and Adoption of the BWRVIP Integrated Surveillance Program
- GO2-04-034, February 2004 Monthly Operating Report for Columbia Generating Station
- GO2-04-036, Registration of Spent Fuel Cask Use
- GO2-04-037, Registration of Spent Fuel Cask Use
- GO2-04-038, Registration of Spent Fuel Cask Use
- GO2-04-047, Emergency Response Data System, Change to Data Point Library
- GO2-04-049, 2003 Annual Environmental Operating Report
- GO2-04-053, Notification of 1-year Extension to Columbia'S Second Ten-year Interval Inservice Testing Program Plan
- GO2-04-065, Request to Incorporate ASME Code Case N-663 in Columbia'S Second Ten-Year Interval Inservice Inspection Program Plan
- GO2-04-074, License Amendment Request Adoption of TS Task Force (TSTF) Traveler - 287, Revision 5, Ventilation System Envelope Allowed Outage Time
- GO2-04-078, Registration of Spent Fuel Cask Use
- GO2-04-079, Independent Spent Fuel Storage Installation (Isfsi), Request Registration of Spent Fuel Cask Use
- GO2-04-082, Registration of Spent Fuel Cask Use
- GO2-04-083, Supplemental Response to the April 29, 2003 Order
- GO2-04-085, Registration of Spent Fuel Cask Use
- GO2-04-088, Annual Report of Individual Monitoring
- GO2-04-095, Annual Radiological Environmental Operating Report
- GO2-04-099, Clarification on the Role of Reactor Core Isolation Cooling During a Station Blackout
- GO2-04-103, Justifications on the Use of Alternative Measures for Compliance with 10 CFR 73.55
- GO2-04-107, License Amendment Request to Revise Technical Specification 3.4.11, Reactor Coolant System Pressure and Temperature Limits
- GO2-04-123, June 2004 Monthly Operating Report for Columbia Generating Station
- GO2-04-125, Request for Permanent Relief from Inservice Inspection Requirements of 10 CFR 50.55(g) for the Volumetric Examination of Circumferential Reactor Pressure Vessel Welds
- GO2-04-130, Northwest Responses to Request for Additional Information Regarding Training and Qualification Plan
- GO2-04-131, Supplemental Responses to Requests for Additional Information Regarding Plant Security Plan
- GO2-04-137, Request for Amendment to Technical Specifications for One-Time Extension of Containment Leak Rate Test Interval
- GO2-04-140, July 2004 Monthly Operating Report for Columbia Generating Station
- GO2-04-159, August 2004 Monthly Operating Report for Columbia Generating Station
- GO2-04-160, Supplemental Submittal of Revisions to Physical Security Plan for Columbia Generating Station
- GO2-04-168, Report of Implementation Status of Interim Compensatory Measures Required by NRC Order (EA-02-104) of October 16, 2002
- GO2-04-174, Resubmittal of Revisions to Physical Security Plan for Columbia Generating Station Pursuant to Order EA-03-086
- GO2-04-177, License Amendment Request: Control Rod Drop Accident Analysis
- GO2-04-188, Confirmation of Verbal Agreement for Extension of Response Due Date
- GO2-04-204, Additional Information to Include with Request to Implement 2ISI-29 Addressing ASME Section XI, IWA-5213, Test Condition Holding Times, for the Second Inservice Inspection Interval
- GO2-05-009, Corrected Page for the License Amendment Request to Revise the Reactor Pressure Vessel Material Surveillance Program
- GO2-05-020, Request to Implement 2ISI-31 Addressing Use of Subsequent ASME Section XI Edition and Addenda for Code Category C-H
- GO2-05-030, 2004 Annual Environmental Operating Report
- GO2-05-032, Changes to Distribution List
- GO2-05-044, Notification of Qualification for Performing Neutronic Calculations
- GO2-05-050, February 2005 Monthly Operating Report for Columbia Generating Station
- GO2-05-054, Response to Request for Additional Information Addressing Chemistry Issues Associated with the Alternative Source Term License Amendment Request
- GO2-05-057, Emergency Technical Specification Change Request for One-Time Extension of Completion Time for Limiting Condition for Operation Condition 3.5.1.B
- GO2-05-061, Submittal of Level of Financial Protection, Annual Reporting Requirement
- GO2-05-062, Decommissioning Fund Status Report
- GO2-05-065, Review of NRC Violation 50-397/04-05-02
- GO2-05-098, Response to NRC Guidance Regarding Mitigation Strategies
- GO2-05-099, License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power
- GO2-05-105, Emergency Response Data System, Change to Data Point Library
- GO2-05-108, CFR 50.46 Report of Significant Changes in Cycle 17 and 18 Emergency Core Cooling System Evaluation Analysis
- GO2-05-126, Emergency Response Data System, Change to Data Point Library
- GO2-05-138, Notification of Intent to Comply with Order EA-05-007
- GO2-05-142, Response to Inspection Report 05000397-05-007
- GO2-05-144, Generation Station Physical Security Plan, Revision 2
- GO2-05-145, Response to Request for Additional Information Regarding the License Amendment Request for a One-time Extension to Technical Specification 3.7.1
- GO2-05-148, Cycle 18 Core Operating Limits Report Revision 1
- GO2-05-153, Analytical Evaluation of Inservice Inspection Examination Results
- GO2-05-157, Voluntary Response to Regulatory Issue Summary 2005-19
- GO2-05-166, Submittal of the Third Ten-Year Interval Pump and Valve Inservice Testing (IST) Program Plan
- GO2-05-171, Response to Request for Additional Information Regarding February 2002, Order Section B.5.b
- GO2-05-179, Changes to Distribution List
- GO2-05-183, 2005 Annual Financial Report
- GO2-05-184, Supplement to the License Amendment Request for a One-Time Extension to Technical Specification 3.7.1
- GO2-05-186, Supplement to the License Amendment Request for a One-Time Change to Technical Specifications
- GO2-05-194, Guarantee of Payment of Deferred Premium
- GO2-05-196, Submittal of the Third Ten-Year Interval Inservice Inspection Program Plan and 10 CFR 50.55a Requests 3ISI-01 Through 3ISI-07
- GO2-06-004, Clarification of Response to Request for Additional Information Regarding License Amendment Request for Extension of Diesel Generator Completion Time
- GO2-06-019, Response to Request for Additional Information Regarding License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power
- GO2-06-029, Clarification Regarding a Commitment Associated with the License Amendment Request for Extension of Diesel Generator Completion Time
- GO2-06-042, Revised Technical Specification Bases Change (for Information) and Summary of Commitments Associated with the License Amendment Requests for Extension of Diesel Generator Completion Time
- GO2-06-043, Response to Request for Additional Information Related to Alternative Source Term License Amendment Request
- GO2-06-049, Level of Financial Protection Annual Reporting Requirement
- GO2-06-059, License Amendment Request to Adopt Origen-ARP for Calculating Fuel Pool Decay Heat Load
- GO2-06-060, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process
- GO2-06-061, Request for Amendment to Technical Specifications Surveillance Requirements for the Suppression Chamber-to-Drywell Vacuum Breakers and the Drywell-to-Suppression Chamber Bypass Leakage Test
- GO2-06-062, Correction to Third Ten-Year Interval Inservice Inspection Program Plan
- GO2-06-064, Annual Environmental Operating Report
- GO2-06-065, Annual Report of Individual Monitoring
- GO2-06-073, Transmittal of Columbia Generating Station, 2005 Annual Radiological Environmental Operating Report
- GO2-06-080, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Emergency Diesel Generator Surveillance Testing
- GO2-06-081, Request for Use of Higher Assigned Protection Factors with Use of French-Designed Air-Line Respirator Equipment
- GO2-06-082, Notification of Deviation from Boiling Water Reactor Vessel Internals Project (BWRVIP) Program Element
- GO2-06-084, Notification of NPDES Permit Renewal
- GO2-06-086, Response to Generic Letter 2006-003, Potentially Nonconforming Heymc and MT Fire Barrier Configurations.
- GO2-06-087, Response to Inspection Report 05000397-06-002
- GO2-06-092, Supplemental Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power.
- GO2-06-100, Generation Station Groundwater Questionnaire
- GO2-06-105, Response to Request for Additional Information Related to Alternative Source Term License Amendment Request
- GO2-06-108, Response to Request for Additional Information Related to Alternative Source Term License Amendment Request
- GO2-06-116, Revision to Proposed Changes Associated with License Amendment Request - Alternative Source Term
- GO2-06-118, Voluntary Response to Regulatory Issue Summary 2006-15
- GO2-06-119, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 72.214 for Dry Cask Storage
- GO2-06-133, Notification of Deviation from Boiling Water Reactor Vessel Internals Project (BWRVIP) Program Element
- GO2-06-137, Revised Completion Dates for Commitments Made in Response to Temporary Instruction 2515/164 NRC Inspection Report 05000397/2005012
- GO2-06-138, Withdrawal of Request 3ISI-01 for Plant
- GO2-06-153, Guarantee of Payment of Deferred Premium
- GO2-06-154, Notification of Deviation from Boiling Water Reactor Vessel and Internals Project (BWRVIP) Program Element
- GO2-06-155, Initial Exam - 11/2006 - Post Exam Comments
- GO2-06-156, Supplemental Information Regarding Second Ten-Year Interval Request 2ISI-32-2
- GO2-07-004, Transmittal of Columbia Generating Station - 2006 Annual Financial Report
- GO2-07-008, Response to Request for Additional Information Regarding License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power
- GO2-07-021, License Amendment 199 Safety Evaluation Corrections
- GO2-07-024, GO2-07-024 - Columbia Generating Station - Exigent License Amendment Request - Amend Operating License to Revise TS 3.6.1.7 Suppression Chamber-to-Drywell Vacuum Breakers
- GO2-07-025, Response to Request for Additional Information Regarding the Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Emergency Diesel Generator Surveillance Testing
- GO2-07-034, Response to Request for Additional Information Regarding Relief Request 3ISI-07
- GO2-07-035, Response to Request for Additional Information Regarding the Third Ten-Year Interval Inservice Testing Program
- GO2-07-036, Response to Request for Additional Information Regarding License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power
- GO2-07-038, Information Regarding Future Plans for MSIV Testing
- GO2-07-045, Final Response to Generic Letter 2003-01 Control Room Habitability.
- GO2-07-053, Response to Request for Additional Information Regarding License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power
- GO2-07-057, Decommissioning Fund Status Report
- GO2-07-058, Changes to Distribution List
- GO2-07-071, Transmittal of Annual Report of Individual Monitoring
- GO2-07-078, Submittal of the 2006 Annual Environmental Operating Report
- GO2-07-079, Response to Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients.
- GO2-07-089, Cycle 19 Core Operating Limits Report (Colr), Revision 0
- GO2-07-109, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level
- GO2-07-111, License Amendment Request for Proposed Changes to Columbia Technical Specifications: Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves
- GO2-07-112, License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 485
- GO2-07-115, Response to Request for Additional Information Regarding Second 10-Year Inservice Inspection Interval Request for Relief 2ISI-32
- GO2-07-116, Request for Amendment to Technical Specification to Modify Requirements Regarding Control Room Envelope Habitability Using the Consolidated Line Item Improvement Process (CLIIP)
- GO2-07-123, License Amendment Request to Technical Specifications Associated with Condensate Storage Tank Level
- GO2-07-141, Inservice Inspection Summary Report for Refueling Outage R-18
- GO2-07-156, Supplement to License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 485
- GO2-07-163, Response to Request for Additional Information Related to License Amendment Request for Condensate Storage Tank Technical Specifications
- GO2-07-164, Response to Request for Additional Information Related to GL-07-001
- GO2-07-174, Change to Distribution List
- GO2-08-005, 2007 Annual Financial Report
- GO2-08-010, Withdrawal of Request for Emergency Plan Change
- GO2-08-017, Generation Station 60-day Response to NRC Bulletin 2007-01
- GO2-08-025, Fitness for Duty Semi-Annual Performance Data Report, July 1 to December 31, 2007