MONTHYEARML23060A1092023-03-0101 March 2023 Proof of Financial Protection (10 CFR 140.15) ML23024A0822023-01-20020 January 2023 Stephens Insurance, Entergy - 2023 Nuclear Energy Liability Evidence of Financial Protection ML22073A1892022-03-14014 March 2022 River Bend Nuclear Station; and Waterford Steam Electric Station, Unit 3 - Proof of Financial Protection (10 CFR 140.15) ML21089A3222021-03-30030 March 2021 Entergy Operations, Inc and Entergy Nuclear Operations, Inc. - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML21029A1392021-01-25025 January 2021 Entergy - 2021 Nuclear Energy Liability Evidence of Financial Protection CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML19045A6752019-02-14014 February 2019 Entergy - 10 CFR 140.15 Proof of Financial Protection ML19016A1662019-01-11011 January 2019 Entergy - 2019 Nuclear Energy Liability Evidence of Financial Protection CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2013-00006, Decommissioning Funding Status Report - Entergy Operations, Inc2013-03-29029 March 2013 Decommissioning Funding Status Report - Entergy Operations, Inc CNRO-2013-00004, Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2013-03-25025 March 2013 Entergy Operations, Inc. and Entergy Nuclear Operations, Inc., Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML1123800222011-11-14014 November 2011 2010 DFS Report Analysis for Waterford Generating Station, Unit 3 ML1123718252011-11-14014 November 2011 2010 DFS Report Analysis for River Bend Station ML1123510692011-11-14014 November 2011 2010 DFS Report Analysis for Arkansas Nuclear One, Unit 1 ML1123510882011-11-14014 November 2011 2010 DFS Report Analysis for Arkansas Nuclear One, Unit 2 ML1123700122011-11-14014 November 2011 2010 DFS Report Analysis for Grand Gulf Nuclear Station CNRO-2011-00002, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2011-03-31031 March 2011 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML0934313182009-12-0101 December 2009 Updated Decommissioning Shortfalls as of December 1, 2009 CNRO-2007-00008, Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21)2007-02-22022 February 2007 Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21) CNRO-2005-00049, Entergy Operations Inc. - Proof of Financial Protection (10 CFR 140.15)2005-08-31031 August 2005 Entergy Operations Inc. - Proof of Financial Protection (10 CFR 140.15) CNRO-2005-00022, Entergy Operations, Inc., Status of Decommissioning Funding Report2005-03-31031 March 2005 Entergy Operations, Inc., Status of Decommissioning Funding Report CNRO-2005-00020, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2005-03-24024 March 2005 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2004-00013, Entergy Operations, Inc. - Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21)2004-02-26026 February 2004 Entergy Operations, Inc. - Proof of Financial Protection (10CFR140.15) and Guarantee of Payment of Deferred Premiums (10CFR140.21) CNRO-2003-00036, Entergy Operations, Inc., Proof of Financial Protection (10 CFR 140.15)2003-08-29029 August 2003 Entergy Operations, Inc., Proof of Financial Protection (10 CFR 140.15) CNRO-2003-00007, Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21)2003-02-28028 February 2003 Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15) & Guarantee of Payment of Deferred Premiums (10 CFR 140.21) ML0224901392002-08-29029 August 2002 Entergy Operations, Inc - Proof of Financial Protection (10 CFR 140.15) GNRO-2002/00038, Annual Financial Report for South Mississippi Electric Power Association (Smepa)2002-04-23023 April 2002 Annual Financial Report for South Mississippi Electric Power Association (Smepa) 2023-03-01
[Table view] Category:Letter type:CNRO
MONTHYEARCNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process2022-05-26026 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process CNRO-2021-00023, Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-10-0606 October 2021 Entergy Operations, Inc. - Supplement to CNRO-2021-00002, Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2021-00002, Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L2021-01-28028 January 2021 Entergy Operations, Inc. - Basis for Concluding the Terms of Confirmatory Order EA-17-132/EA-17-153 Are Complete, Element L CNRO-2020-00023, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary2020-12-17017 December 2020 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2020 Summary CNRO-2020-00021, Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-0192020-11-0909 November 2020 Response to Request for Additional Information Regarding Relief Requests GG-ISI-020 and RBS-ISI-019 CNRO-2020-00016, Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv)2020-08-12012 August 2020 Entergy Nuclear Operations, Inc - Relief Request EN-RR-20-002: Proposed Use of Subsequent ASME Code Edition and Addenda in Accordance with 10 CFR 50.55a(g)(4)(iv) CNRO-2020-00015, Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)2020-06-0808 June 2020 Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) CNRO-2020-00009, Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 12020-02-26026 February 2020 Application to Revise Technical Specifications to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1 CNRO-2020-00006, Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 22020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Revision 2 CNRO-2020-00008, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-24024 January 2020 Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR-Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process CNRO-2019-00030, Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary2019-12-30030 December 2019 Response to Confirmatory Order EA-17-132/EA-17-153, Element K 2019 Summary CNRO-2019-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2019-03-28028 March 2019 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2019-00007, Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report2019-03-28028 March 2019 Grand Gulf Nuclear Station; and Waterford 3 Steam Electric Station - Decommissioning Funding Status Report CNRO-2019-00013, Entergy Response to Confirmatory Order EA-17-132/EA-17-1532019-03-21021 March 2019 Entergy Response to Confirmatory Order EA-17-132/EA-17-153 CNRO-2019-00009, Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 22019-03-0707 March 2019 Stations - Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR, Revision 2 CNRO-2019-00003, Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 42019-01-31031 January 2019 Application to Revise Technical Specifications to Adopt TSTF-529 11 Clarify Use and Application Rules, 11 Revision 4 CNRO-2019-00002, Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-01-31031 January 2019 Relief Request Number EN-19-RR-1, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 CNRO-2018-00051, Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K2018-12-28028 December 2018 Grand Gulf Nuclear Station, Palisades Nuclear Plant, River Bend Station, Pilgrim Nuclear Station and Waterford 3 - Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element K CNRO-2018-00039, Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J2018-09-27027 September 2018 Entergy Response to Confirmatory Order EA-17-132/EA-17-153, Element J CNRO-2018-00021, Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in the Spent Fuel Pools for Indian Point Energy Center, Unit 3 and Waterford 3 Steam Electric Station CNRO-2018-00011, Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Submittal of Joint Plant Access Shared Information Table CNRO-2017-00022, Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 12017-11-17017 November 2017 Relief Request Number EN-17-RR-1 - Proposed Alternative to Use ASME Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate-Energy Class 2 or 3 Piping, Section XI, Division 1 CNRO-2017-00010, Entergy Operations, Inc. - Decommissioning Funding Status Report2017-03-31031 March 2017 Entergy Operations, Inc. - Decommissioning Funding Status Report CNRO-2017-00007, Nuclear Property Damage Insurance (10 CFR 50.54(w)(3))2017-03-30030 March 2017 Nuclear Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2017-00005, and Isfsl - License Amendment Request for Administrative Change to Licensee Name2017-03-29029 March 2017 and Isfsl - License Amendment Request for Administrative Change to Licensee Name CNRO-2016-00023, Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities2016-12-0101 December 2016 Request EN-ISI-16-1: Use of Later Edition/Addenda of Amse Section XI Code for ISI Related Activities CNRO-2016-00017, Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual2016-07-19019 July 2016 Entergy Nuclear Operations - Request for Approval of Change to the Quality Assurance Program Manual CNRO-2016-00016, Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated)2016-06-0202 June 2016 Entergy - Response to RAI Questions and Submittal of Relief Request EN-ISI-15-1 (Updated) CNRO-2016-00008, Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2016-03-30030 March 2016 Entergy - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2016-00005, Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM)2016-02-25025 February 2016 Response to Request for Additional Information Pertaining to a Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2016-00004, Notice Regarding Acquisition of Title to Leased Interest2016-02-10010 February 2016 Notice Regarding Acquisition of Title to Leased Interest CNRO-2016-00002, Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Secti2016-01-29029 January 2016 Entergy - Relief Request Number RR EN-15-1, Rev. 1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Water Service, Section Xl, CNRO-2015-00002, Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 12015-12-0404 December 2015 Entergy Operations, Inc. - Response to RAI Questions and Submittal of RR EN-15-2, Rev. 1 CNRO-2015-00022, Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code2015-11-20020 November 2015 Entergy - Relief Request EN-ISI-15-1: Proposed Alternative to Maintain ISI-Related Activities to the 2001 Edition/2003 Addendum of ASME Section Xl Code CNRO-2015-00023, Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM)2015-11-0606 November 2015 Request for Approval of Change to the Entergy Quality Assurance Program Manual (QAPM) CNRO-2015-00021, Confirmatory Order - Action H2015-11-0303 November 2015 Confirmatory Order - Action H CNRO-2015-00020, ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance2015-09-23023 September 2015 ISFSI and Waterford 3 Steam Electric Station and ISFSI Re Required Notification of Receipt of All Required Regulatory Approvals of the Proposed Transfer Actions and Documentary Evidence of Required Insurance CNRO-2015-00018, Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1.2015-08-20020 August 2015 Entergy - Relief Request Number RR EN-15-2 - Proposed Alternative to Use ASME Code Case N-786-1, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping, Section XI, Division 1. CNRO-2015-00017, Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, D2015-06-0505 June 2015 Entergy Submits Relief Request RR EN-15-1 - Proposed Alternative to Use ASME Code Case N-789-1, Alternative Requirements for Pad Reinforcement of Class 2 and 3 Moderate Energy Carbon Steel Piping for Raw Waster Service, Section XI, Division CNRO-2015-00012, Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual2015-04-30030 April 2015 Arkansas, Units 1 & 2, Grand Gulf, River Bend, Waterford, Unit 3, Indian Point, Units 1, 2, & 3, Pilgrim, James A. FitzPatrick, Big Rock, Palisades - Submittal of Revision of Quality Assurance Program Manual CNRO-2015-00011, Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 20142015-03-27027 March 2015 Grand Gulf Nuclear Station Unit 1 and Waterford 3 Steam Electric Station Submittal of Decommssioning Funding Status Report for 2014 CNRO-2015-00010, Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3))2015-03-27027 March 2015 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) CNRO-2015-00003, RBS Security Confirmatory Order - Action C2015-02-0505 February 2015 RBS Security Confirmatory Order - Action C CNRO-2015-00007, ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments2015-01-30030 January 2015 ISFSI, Waterford, Unit 3, and ISFSI, Responses to NRC Request for Additional Information Regarding Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00009, Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations2014-07-24024 July 2014 Response to Request for Additional Information for Review of the Decommissioning Funding Plans for Entergy Operations, Inc., Independent Spent Fuel Storage Installations CNRO-2014-00007, ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments2014-06-10010 June 2014 ISFSI, Waterford 3 and ISFSI - Application for Order Approving Transfers of Licenses and Conforming License Amendments CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G CNRO-2014-00004, Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/20142014-04-0303 April 2014 Unit 3, Letter (CNRO-2014-00002/ENOC-14-00010) of Same Subject 03/31/2014 CNRO-2014-00001, Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-0962014-02-26026 February 2014 Completion of Change to the Entergy Quality Assurance Program Manual with Regards of Confirmatory Order EA-11-096 CNRO-2013-00011, Notice Regarding Renewal of Lease2013-12-0303 December 2013 Notice Regarding Renewal of Lease 2022-05-26
[Table view] |
Text
Entergy Operations, Inc.
- Entergy 1340 Echelon Parkway Jackson, Mississippi 39213-8298 Tel 601-368-5758 F. G. Burford Acting Director Nuclear Safety & Licensing CNRO-2005-00049 August 31, 2005 U.S. Nuclear Regulatory Commission Attn: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 (301) 415-7000
SUBJECT:
Entergy Operations, Inc. - Proof of Financial Protection (10 CFR 140.15)
River Bend Station Grand Gulf Nuclear Station Docket No. 50-458 Docket No. 50-416 License No. NPF-47 License No. NPF-29 Arkansas Nuclear One Waterford 3 Steam Electric Units 1 & 2 Station Docket Nos. 50-313 & 50-368 Docket No. 50-382 License Nos. DPR-51 & NPF-6 License No. NPF-38
Dear Sir or Madam:
In accordance with 10 CFR 140.15, certified copies of liability insurance policy endorsements issued in the first half of 2005 for each Entergy Operations, Inc. nuclear unit are submitted to the Commission as proof of financial protection. The attached list summarizes the enclosed endorsements.
This letter contains no new commitments.
Sincerely, ft3m 5 i . " o Dct-FGB/LAE/baa attachments cc: (See next page) p\ O'D I
CNRO-2005-00049 Page 2 of 2 cc: (All Below w/ Endorsements)
Mr. T. A. Burke (ECH)
Mr. W. R. Campbell (ECH)
Mr. J. P. DeRoy (ECH)
Mr. J. S. Forbes (ANO)
Mr. P. D. Hinnenkamp (RBS)
Mr. J. R. McGaha (ECH)
Mr. N. S. Reynolds (W&S)
Mr. L. Jager Smith (Wise, Carter)
Mr. J. E. Venable (W-3)
Mr. G. A. Williams (GGNS)
Mr. D. G. Holland, Project Manager, ANO-2 Mr. N. Kalyanam, Project Manager, W-3 Mr. M. C. Thadani, Project Manager, ANO-1 Dr. B. S. Mallett, Regional Administrator, Reg. IV Mr. M. K. Webb, Project Manager, RBS Mr. B. K. Vaidya, Project Manager, GGNS
Attachment to CNRO-2005-00049 Nuclear Liability Policies Of Insurance Certified True Copies Of Endorsements Received In First Half of 2005 Entergy Operations, Inc. and Entergy Arkansas, Inc. (formerly Arkansas Power & Light Company)
- Arkansas Nuclear One FacilitV Form American Nuclear Insurers Policy No. NF - 0210 Endorsement No. 151 Entergy Operations, Inc.; System Energy Resources, Inc.; Entergy Mississippi, Inc.
(formerly Mississippi Power & Light Company); and South Mississippi Electric Power Association
- Grand Gulf Nuclear Station FacilitV Form American Nuclear Insurers Policy No. NF - 0257 Endorsement No. 139 Entergy Operations, Inc.; Entergy Gulf States, Inc. (formerly Gulf States Utilities Company); and Cajun Electric Power Cooperative, Inc.
- River Bend Station FacilitV Form American Nuclear Insurers Policy No. NF - 0286 Endorsement No. 111 Entergy Operations, Inc. and Entergy Louisiana, Inc. (formerly Louisiana Power & Light Company)
- Waterford Unit 3 Facility Form American Nuclear Insurers Policy No. NF - 0263 Endorsement No. 125 1
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION CHANGES IN SUBSCRIBING COMPANIES AND IN THEIR PROPORTIONATE LIABILITY ENDORSEMENT CALENDAR YEAR 2005
- 1. It is agreed that with respect to bodily injury, property damage, environmental damage or evacuation of the public caused, during the effective period of this endorsement, by the nuclear energy hazard:
- a. The word "companies" wherever used in the policy means the subscribing companies listed below.
- b. The policy shall be binding on such companies only.
- c. Each such company shall be liable for its proportion of any obligation assumed or expense incurred under the policy because of such bodily injury, property damage, environmental damage or evacuation of the public as designated below.
- 2. It is agreed that the effective period of this endorsement is from the beginning of the effective date of this endorsement stated below to the close of December 31, 2005 or to the time of the termination or cancellation of the policy, if sooner.
AXIS Reinsurance Company 14.826676 %
Employers Mutual Casualty Company 2.965335 %
Federal Insurance Company 34.101355 %
Motors Insurance Corporation 0.661271 %
Nat'l Union Fire Ins Co of Pitts, PA 14.826676 %
State Farm Mutual Automobile Insurance Company 17.792011 %
Zurich American Insurance Company 14.826676 %
Total 100.000000 %- NE-2005 This is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part of the Nuclear Energy Liability Policy (Facility Form) as designated hereon. No insurance is afforded hereunder.
John L. Quattrocchi, Senior Vice President, Underwriting, American Nuclear Insurers Effective Date of this Endorsement: January 1, 2005 To form a part of Policy No. NF -0210 (12:01 A.M. Standard Time)
Issued to: Entergy Operations, Inc. and Entergy Arkansas, Inc. (formerly Arkansas Power
& Light Company)
Date of Issue: February 28, 2005 For the subscribing companies By _ee t12.
C/' c} President Endorsement No.: 151 Countersigned by CERTIFIED COPY
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION CHANGES IN SUBSCRIBING COMPANIES AND IN THEIR PROPORTIONATE LIABILITY ENDORSEMENT CALENDAR YEAR 2005
- 1. It is agreed that with respect to bodily injury, property damage, environmental damage or evacuation of the public caused, during the effective period of this endorsement, by the nuclear energy hazard:
- a. The word "companies" wherever used in the policy means the subscribing companies listed below.
- b. The policy shall be binding on such companies only.
- c. Each such company shall be liable for its proportion of any obligation assumed or expense incurred under the policy because of such bodily injury, property damage, environmental damage or evacuation of the public as designated below.
- 2. It is agreed that the effective period of this endorsement is from the beginning of the effective date of this endorsement stated below to the close of December 31, 2005 or to the time of the termination or cancellation of the policy, if sooner.
AXIS Reinsurance Company 14.826676 %
Employers Mutual Casualty Company 2.965335 %
Federal Insurance Company 34.101355 %
Motors Insurance Corporation 0.661271 %
Nat'l Union Fire Ins Co of Pitts, PA 14.826676 %
State Farm Mutual Automobile Insurance Company 17.792011 %
Zurich American Insurance Company 14.826676 %
Total I 00.000000 % NE-2005 This is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part of the Nuclear Energy Liability Policy (Facility Form) as designated hereon. No insurance is afforded hereunder.
John L. Quattrocchi, Senior Vice President, Underwriting, American Nuclear Insurers Effective Date of this Endorsement: January 1, 2005 To form a part of Policy No. NF -0257 (12:01 A.M. Standard Time)
Issued to: Entergy Operations, Inc.; System Energy Resources, Inc.; Entergy Mississippi, Inc. (formerly Mississippi Power & Light Company); and South Mississippi Electric Power Association Date of Issue: February 28, 2005 For the subscribing companies By Je -1 L IS )
A d President Endorsement No.: 139 Countersigned by CERTIFIED COPY
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION CHANGES IN SUBSCRIBING COMPANIES AND IN THEIR PROPORTIONATE LIABILITY ENDORSEMENT CALENDAR YEAR 2005
- 1. It is agreed that with respect to bodily injury, property damage, environmental damage or evacuation of the public caused, during the effective period of this endorsement, by the nuclear energy hazard:
- a. The word "companies" wherever used in the policy means the subscribing companies listed below.
- b. The policy shall be binding on such companies only.
- c. Each such company shall be liable for its proportion of any obligation assumed or expense incurred under the policy because of such bodily injury, property damage, environmental damage or evacuation of the public as designated below.
- 2. It is agreed that the effective period of this endorsement is from the beginning of the effective date of this endorsement stated below to the close of December 31, 2005 or to the time of the termination or cancellation of the policy, if sooner.
AXIS Reinsurance Company 14.826676 %
Employers Mutual Casualty Company 2.965335 %
Federal Insurance Company 34.101355 %
Motors Insurance Corporation 0.661271 %
Nat'l Union Fire Ins Co of Pitts, PA 14.826676 %
State Farm Mutual Automobile Insurance Company 17.792011 %
Zurich American Insurance Company 14.826676 %
Total 1Q0.0Q 0 NE-2005 This is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part of the Nuclear Energy Liability Policy (Facility Form) as designated hereon. No insurance is afforded hereunder.
John L. Quattrocchi, Senior Vice President, Underwriting, American Nuclear Insurers Effective Date of this Endorsement: January 1, 2005 To form a part of Policy No. NF -0286 (12:01 A.M. Standard Time)
Issued to: Entergy Operations, Inc.; Entergy Gulf States, Inc. (formerly Gulf States Utilities Company); and Cajun Electric Power Cooperative, Inc.
Date of Issue: February 28, 2005 For the subscribing companies By 1C.) "
_-F r
(,/O c -President Endorsement No.: 111 Countersigned by \. 2s-~ A CERTIFIED COPY
NUCLEAR ENERGY LIABILITY INSURANCE NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION CHANGES IN SUBSCRIBING COMPANIES AND IN THEIR PROPORTIONATE LIABILITY ENDORSEMENT CALENDAR YEAR 2005
- 1. It is agreed that with respect to bodily injury, property damage, environmental damage or evacuation of the public caused, during the effective period of this endorsement, by the nuclear energy hazard:
- a. The word "companies" wherever used in the policy means the subscribing companies listed below.
- b. The policy shall be binding on such companies only.
- c. Each such company shall be liable for its proportion of any obligation assumed or expense incurred under the policy because of such bodily injury, property damage, environmental damage or evacuation of the public as designated below.
- 2. It is agreed that the effective period of this endorsement is from the beginning of the effective date of this endorsement stated below to the close of December 31, 2005 or to the time of the termination or cancellation of the policy, if sooner.
AXIS Reinsurance Company 14.826676 %
Employers Mutual Casualty Company 2.965335 %
Federal Insurance Company 34.101355 %
Motors Insurance Corporation 0.661271 %
Nat'l Union Fire Ins Co of Pitts, PA 14.826676 %
State Farm Mutual Automobile Insurance Company 17.792011 %
Zurich American Insurance Company 14.826676 %
Total 1 0=000000 % NE-2005 This is to certify that this is a true copy of the original Endorsement having the endorsement number and being made part of the Nuclear Energy Liability Policy (Facility Form) as designated hereon. No insurance is afforded hereunder.
John L. Quattrocchi, Senior Vice President, Underwriting, American Nuclear Insurers Effective Date of this Endorsement: January 1, 2005 To form a part of Policy No. NF -0263 (12:01 A.M. Standard Time)
Issued to: Entcrgy Operations, Inc. and Entergy Louisiana, Inc. (formerly Louisiana Powcr & Light Company)
Date of Issue: February 28, 2005 For the subscribing companies By a/
JL't-)
4r President
(&"'
Endorsement No.: 125 Countersigned by CERTIFIED COPY