Tennessee Valley Authority , 1101 Market Street, Chattanooga , Tennessee 37402 CNL-19-022 April 1, 2019 10 CFR 50.54(w) 10 CFR 50.4 ATTN : Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Renewed Facility Operating License Nos. DPR-33, DPR-52 , and DPR~68 NRC Docket Nos. 50-259 , 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Renewed Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket No. 50-390 and 50-391

Subject:

Annual Insurance Status Report Title 10, Code of Federal Regulations, Section 50.54(w) (10 CFR 50.54(w)) requires power reactor licensees for production facilities to take reasonable steps to obtain insurance, at a minimum coverage limit for each licensed reactor station site of either $1.06 billion or whatever amount of insurance is generally available from private sources, whichever is less.

Also , 10 CFR 50.54(w)(3) requires that each licensee report on April 1 of each year the current levels and sources of this insurance.

In accordance with 10 CFR 50.54(w), Tennessee Valley Authority (TVA) has purchased onsite property damage insurance for Browns Ferry Nuclear Plant (BFN}, Sequoyah Nuclear Plant (SQN}, and Watts Bar Nuclear Plant (WBN). Enclosed is the required information on source and level of coverage for TVA's facilities.

There are no new regulatory commitments contained in this letter. If you have any questions regarding this matter, please contact Michael A. Brown at (423) 751-3275.

Respectfully,

~~

E. K. Henderson Director, Nuclear Regulatory Affairs

Enclosure:

Nuclear Property and Decontamination Liability Insurance Annual Report cc: see Page 2

U.S. Nuclear Regulatory Commission CNL-19-022 Page 2 April 1, 2019 cc:(Enclosure)

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector - Watts Bar Nuclear Plant

ENCLOSURE Nuclear Property and Decontamination Liability Insurance Annual Report Insurance Carrier Coverage Limit Policy Number Browns Ferry Nuclear Plant (BFN)

Nuclear Electric Insurance Ltd. $1.5 billion P19-033 NEIL $560 million in excess of $1.5 billion BX19-009*

Sequoyah Nuclear Plant (SQN)

Nuclear Electric Insurance Ltd. $1.5 billion P19-043 NEIL $560 million in excess of $1.5 billion BX19-009*

Watts Bar Nuclear Plant (WBN)

Nuclear Electric Insurance Ltd. $1.5 billion P19-060 NEIL $560 million in excess of $1.5 billion BX19-009*

  • NEIL Policy BX19-009 is a Blanket Excess, Decontamination Liability, Decommissioning Liability and Excess Property Insurance Policy which is applicable to all three sites (BFN, SQN, and WBN) that provides a maximum Limit of Liability resulting from any one Accident that will not exceed $560 million.