B17834, Forwards Proprietary Revised NRC Form 398,which Certifies That SL Doboe Has Completed Eligibility Requirements for Sro,Per 10CFR55.31.Proprietary Info Withheld

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Revised NRC Form 398,which Certifies That SL Doboe Has Completed Eligibility Requirements for Sro,Per 10CFR55.31.Proprietary Info Withheld
ML20210E146
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/20/1999
From: Olivier L
NORTHEAST NUCLEAR ENERGY CO.
To: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20137Y184 List:
References
B17834, NUDOCS 9907280139
Download: ML20210E146 (3)


Text

-

g Northeast Rogw Feny RddRoute 156WtufwW 06385 j' Nuclear Emrgy Maistone Nuclear Power St: tion Northeast Nuclear Energy Company P.O. Box 128 Waterford, CT 06385-0128 (860) 447-1791 Fax (860) 444 4277

'Ihe Northeast Utilities System JUL 2 0 1999 Docket No. 50-336  ;

B17834 l Re:10CFR55.61(a)

Mr. H. J. Miller, Regional Administrator, Region i U. S. Nuclear Regulatory Commission i

475 Allendale Road King of Prussia, PA 19406 Millstone Nuclear Power Station, Unit No. 2 Notification of Completion of Eliaibility Reauirements  :

Northeast Nuclear Energy Company (NNECO) hereby certifies that the following individual has completed the eligibility requirements pursuant to 10CFR55.31 for a Senior Operator License:

Name Docket No.

Sandra L. Doboe 55-62009 As required under the condition for her license, a revised NRC Form 398 is hereby submitted (Attachment 1). She has completed the reactivity manipulations required for an Senior Operator License pursuant to 10CFR55.31(a)(5). This individual has also completed greater than 520 hours0.00602 days <br />0.144 hours <br />8.597884e-4 weeks <br />1.9786e-4 months <br /> on-shift training, under instruction. In addition, she has been enrolled in, and remains current in, the Licensed Operator Re-qualification Program since completion of her examination.

Based on completion of the eligibility requirements, NNECO hereby requests, consistent with 10CFR55.61(a), that Ccense be amended to remove the stipulation that required her to comply with the following condition:

"You shall not perform licensed duties until you have complied with 10CFR55.31(a)(5) and documented this on a revised Form-398." I

\

na,..

-L I 9907290139 990720 PDR v

ADOCK O g 3j6 , {h' m a.C j i w/op Y 9' ~ 4. M(LL IDL.

A / Ok I iv/:rYY

U.S. Nuclecr Regul: tory Commission

.- '

  • B17834\ Pcge 2 There are no regulatory commitments contained within this letter.

Should you have any questions regarding this matter, please contact i Mr. R. W. Flanagan at (860) 437-5817.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY m

LWon J. Oli r Senior Vi resident and Chief Nuclear Officer Attachments: 1. NRC Form 398 (Revised) for Sandra L. Doboe cc: J. Conte, Chief of Operator Licensing, NRC Region R. B. Eaton, NRC Senior Project Manager, Millstone Unit No. 2 D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 RWF:rf I

i l

. 4:

.. s.

{

Docket Nos. 50-336 B17834 i

Attachment 1 Milistone Nuclear Power Station, Unit No. 2 NRC Form 398 (Revised) for Sandra L. Doboe i

1 l

July 1999 I l