B17455, Provides Notification of Completion of Eligibility Requirements for TR Berger & Ms Noniewicz,Per 10CFR55.31 for Operator License.Summary of Reactivity Manipulations for Subject Individuals,Encl

From kanterella
Jump to navigation Jump to search
Provides Notification of Completion of Eligibility Requirements for TR Berger & Ms Noniewicz,Per 10CFR55.31 for Operator License.Summary of Reactivity Manipulations for Subject Individuals,Encl
ML20153F715
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/22/1998
From: Bowling M
NORTHEAST NUCLEAR ENERGY CO.
To: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
B17455, NUDOCS 9809290216
Download: ML20153F715 (6)


Text

= . . . - . . . -

4 gggg Itope Ferry Ild. (Route 156), Wtterford, Cr 06385 Nuclear Energy Malstone Nuclear Pomcr Station Northcaat Nuclear Energy Company P.O. Box 128 Waterford, CT 06385-0128 (860) 447-1791 l'as (860) 444-4277 l The Northeast Utilities System SEP 2 21998 Docket No. 50-423 B17455 Re:10CFR55.31 Mr. H. J. Miller, Regional Administrator, Region i U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Notification of Completion of Eligibility Requirements Millstone Nuclear Power Station. Unit 3 Northeast Nuclear Energy Company (NNECO) hereby certifies that the following individuals have completed the eligibility requirements pursuant to 10CFR55.31 for an Operator License: '

Name Docket No.

Todd R. Berger 55-62068 Mark S. Noniewicz 55-62067 Notification for these individuals is effective September 15,1998.

Based on completion of the eligibility requirernents, Northeast Nuclear Energy Company (NNECO) hereby requests, consistent with 10CFR55.33, that licensing action be taken for the above named individuals. t t; . .

  1. f 9809290216 980922 PDR ADOCK 05000423 V PDR .,

0S3422 5 HEV.12 %

- .. - . - - . . - . . - . ._~ _ . - -- - - _ - _ _ . . -

U.S. Nuclear Regulatory Commission B17455\ Page 2 Should you have any questions regarding this matter, please contact Mr. R. W Flanagan 'at (860) 437-5817.

Very truly yours, I NORTHEAST NUCLEAR ENERGY COMPANY l

MBA Martin L. Bowling \/

Millstone Unit No.2 Recovery Officer Attachments: (2)

1. Reactivity Manipulations for Todd R. Berger
2. Reactivity Manipulations for Mark S. Noniewicz cc: H. J. Miller, Region i Administrator j R. J. Conte, Chief of Operator Licensing, NRC Region I ,

J. W. Andersen, NRC Project Manager, Millstone Unit 3 A. C. Cerne, Senior Resident inspector, Millstone Unit 3 U.S. Nuclear Regulatory Commission  ;

ATTN: Document Control Desk

{

Washington, DC 20555 l j

RWF:rf I

. ... . - . . . . . . -~ . . . =..

o .

I' .

- j I

i Docket Nos. 50-423 B17455  ;

l l

Attachment 1 1

Millstone Nuclear Power Station, Unit No. 3 l Reactivity Manioulations -

19I Todd R. Beraer i

a l

L l

f September 1998

l. .

U.S. Nuclear Regulatory Commission B17455 \ Attachment 1 \ Page 1

! Attachment 1 Reactivity Manioulations L fo_[

Todd R. Beraer The following table identifies those Reactivity Manipulations performed pursuant to the l eligibility requirements of 10CFR55.31 by Todd R. Berger at Millstone Unit No. 3. '

Number Description Control Operator Date Position Performed

1. Reactor Power change from 100% . Balance of Plant 8/1/98 to 90% utilizing turbine control to perform the load change.
2. Reactor Power change from 78% to Primary Plant 8/12/98 L 67% utilizing using boration and control rods.
3. Reactor Power change from 67% to Balance of Plant 8/12/98 55% utilizing turbine control to perform the load change.  ;
4. Reactor Power change from 47% to Balance of Plant 8/22/98 57% utilizing turbine control to perform the load change.
5. Reactor Power change from 57% to Primary Plant 8/22/98 67% utilizing using boration and control rods.

1 e

i i l

. . .. . . ~ - - _ _ ~ _. _ . . - _ _ . _ - - .__. ~- . -..~. . ..=.

4 . .

I 1

I j , . , Docket Nos. 50-423 B17455 )

\

i 1

i Attachment 2 Millstone Nuclear Power Station, Unit No. 3 Reactivity Manipulations -

, foi l Mark S. Noniewicz l l

)

l 1

5 I

4 September 1998

- -. ~ . . - .- . - _ _ . . . - - - - . - . - - . . - . - . - - - . - . - . . . . _ -

~'

U.S. Nucisar Regulatory Commission B17455 \ Attachment 2 \ Page 1 l-l Attachment 2 Reactivity Manipulations

! fo_I Mark S. Noniewicz The following table identifies those Reactivity Manipulations performed pursuant to the eligibility requirements of 10CFR55.31 by Mark S. Noniewicz at Millstone Unit No. 3.

Number Description Control Operator Date

Position Performed
1. Reactor Power change from 50% to Balance of Plant 7/11/98

, 60% utilizing turbine control to perform the load change.

2. Reactor Power change from 60% to Primary Plant 7/11/98 70% utilizing using boration and control rods.

! 3. Reactor Power change from 89% to Primary Plant ' 7/14/98 99% utilizing turbine control to

i. perform the load change.
4. Reactor Power change from 89% to Primary Plant 8/12/98 79% utilizing turbine control to perform the load change.
5. Reactor Power change from 79% to Balance of Plant 8/12/98 67% utilizing using boration and control rods.

l L

i l

--.