Letter Sequence Response to RAI |
---|
EPID:L-2019-LLA-0039, License Amendment Request to Address Issues Identified in Westinghouse Document NSAL-15-1 (Approved, Closed) |
|
|
Similar Documents at Cook |
---|
Category:Letter type:AEP
MONTHYEARAEP-NRC-2024-01, Emergency Plan Revision 482024-01-0808 January 2024 Emergency Plan Revision 48 AEP-NRC-2023-56, Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor2023-12-20020 December 2023 Report Per Technical Specification 5.6.6 for Inoperability of Unit 1 Post Accident Monitoring Reactor Coolant (Loop 3 Cold Leg) Wide Range Temperature Recorder Thermal Sensor AEP-NRC-2023-45, Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 Unit 2 - Schedular Exemption for Enhanced Weapons, Firearms, Background Checks, and Security Event Notifications Implementation AEP-NRC-2023-40, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2023-08-29029 August 2023 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2023-29, Core Operating Limits Report2023-06-19019 June 2023 Core Operating Limits Report AEP-NRC-2023-32, Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations2023-06-0606 June 2023 Response to NRC Regulatory Issue Summary 2023-1 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2023-33, Renewable Operating Permit2023-06-0505 June 2023 Renewable Operating Permit AEP-NRC-2023-30, Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump2023-06-0101 June 2023 Follow-Up Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-27, Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Annual Radiological Environmental Operating Report AEP-NRC-2023-19, Annual Radioactive Effluent Release Report2023-04-30030 April 2023 Annual Radioactive Effluent Release Report AEP-NRC-2023-23, Annual Report of Individual Monitoring for 20222023-04-24024 April 2023 Annual Report of Individual Monitoring for 2022 AEP-NRC-2023-24, Notification of Ph Non-Compliance for Turbine Room Sump2023-04-12012 April 2023 Notification of Ph Non-Compliance for Turbine Room Sump AEP-NRC-2023-20, Annual Report of Property Insurance2023-04-0303 April 2023 Annual Report of Property Insurance AEP-NRC-2023-15, Decommissioning Funding Status Report2023-03-28028 March 2023 Decommissioning Funding Status Report AEP-NRC-2023-11, Form OAR-1, Owner'S Activity Report2023-01-31031 January 2023 Form OAR-1, Owner'S Activity Report AEP-NRC-2023-02, Request for Approval of Change Regarding Neutron Flux Instrumentation2023-01-26026 January 2023 Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-66, Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring2022-12-15015 December 2022 Report Per Technical Specification 5.6.6 for Inoperability of Unit 2 Post Accident Monitoring Neutron Flux Monitoring AEP-NRC-2022-46, Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in2022-12-12012 December 2022 Notification of Deviation from Electric Power Research Institute (EPRI) Materials Reliability Program 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in AEP-NRC-2022-61, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-062022-10-24024 October 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Supplemental Examination Requirements, ISIR-5-06 AEP-NRC-2022-58, U1C31 Steam Generator Tube Inspection Report2022-10-24024 October 2022 U1C31 Steam Generator Tube Inspection Report AEP-NRC-2022-56, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2022-10-12012 October 2022 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2022-30, Core Operating Limits Report2022-10-0606 October 2022 Core Operating Limits Report AEP-NRC-2022-51, Evacuation Time Estimate Analysis2022-08-31031 August 2022 Evacuation Time Estimate Analysis AEP-NRC-2022-50, Form OAR-1, Owner'S Activity Report2022-08-25025 August 2022 Form OAR-1, Owner'S Activity Report AEP-NRC-2022-35, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2022-08-18018 August 2022 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2022-47, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 472022-08-0202 August 2022 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan, Revision 47 AEP-NRC-2022-42, Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-07-18018 July 2022 Unit 2 Updated Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements AEP-NRC-2022-29, Annual Radiological Environmental Operating Report for 20212022-05-13013 May 2022 Annual Radiological Environmental Operating Report for 2021 AEP-NRC-2022-15, CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations2022-05-0404 May 2022 CFR 72.48(d)(2) Summary Report of 10 CFR 72.48 Evaluations AEP-NRC-2022-28, 2021 Annual Radioactive Effluent Release Report2022-04-29029 April 2022 2021 Annual Radioactive Effluent Release Report AEP-NRC-2022-27, Annual Report of Individual Monitoring2022-04-27027 April 2022 Annual Report of Individual Monitoring AEP-NRC-2022-05, Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-04-0707 April 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements AEP-NRC-2022-18, Annual Report of Property Insurance2022-03-28028 March 2022 Annual Report of Property Insurance AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2022-12, Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source2022-03-0202 March 2022 Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source AEP-NRC-2022-02, Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2022-02-0101 February 2022 Unit 2 - Supplement to Application to Revise Technical Specifications to Adopt TSTF-5, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2022-01, Quality Assurance Program Change Request for Internal Audit Frequency2022-02-0101 February 2022 Quality Assurance Program Change Request for Internal Audit Frequency AEP-NRC-2022-03, Final Supplemental Response to NRC Generic Letter 2004-022022-01-20020 January 2022 Final Supplemental Response to NRC Generic Letter 2004-02 AEP-NRC-2021-68, Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation2021-12-16016 December 2021 Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation AEP-NRC-2021-67, Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation2021-12-0909 December 2021 Unit 2 - Decommissioning Funding Plan for Independent Spent Fuel Storage Installation AEP-NRC-2021-66, 2020 Annual Radioactive Effluent Release Report Correction2021-11-17017 November 2021 2020 Annual Radioactive Effluent Release Report Correction AEP-NRC-2021-65, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2021-11-0808 November 2021 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-47, Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections2021-11-0808 November 2021 Unit 2 - Application to Revise Technical Specifications to Adopt TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections AEP-NRC-2021-60, Registration of Dry Spent Fuel Storage Cask2021-10-12012 October 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-55, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2021-09-20020 September 2021 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-48, Cycle 26 Core Operating Limits Report, Revision 02021-09-14014 September 2021 Cycle 26 Core Operating Limits Report, Revision 0 AEP-NRC-2021-53, Registration of Dry Spent Fuel Storage Cask2021-08-26026 August 2021 Registration of Dry Spent Fuel Storage Cask AEP-NRC-2021-50, Annual Report of Loss-of-Coolant Accident Evaluation Model Changes2021-08-25025 August 2021 Annual Report of Loss-of-Coolant Accident Evaluation Model Changes AEP-NRC-2021-44, Form OAR-1, Owner'S Activity Report2021-08-12012 August 2021 Form OAR-1, Owner'S Activity Report 2024-01-08
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARAEP-NRC-2022-03, Final Supplemental Response to NRC Generic Letter 2004-022022-01-20020 January 2022 Final Supplemental Response to NRC Generic Letter 2004-02 AEP-NRC-2021-68, Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation2021-12-16016 December 2021 Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation AEP-NRC-2021-43, Response to Request for Additional Information Regarding Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval2021-07-21021 July 2021 Response to Request for Additional Information Regarding Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval AEP-NRC-2021-16, Unit 2 - Response to Request for Additional Information Regarding CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval2021-02-25025 February 2021 Unit 2 - Response to Request for Additional Information Regarding CFR 50.55a Request Associated with the Fifth Ten-Year Inservice Testing Interval AEP-NRC-2021-18, Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2021-02-18018 February 2021 Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2020-50, Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2020-07-0909 July 2020 Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2019-56, Seismic Probabilistic Risk Assessment in Response to Near Term Task Force Recommendation 2.1: Seismic2019-11-0404 November 2019 Seismic Probabilistic Risk Assessment in Response to Near Term Task Force Recommendation 2.1: Seismic AEP-NRC-2019-32, Unit 2 - Response to Request for Additional Information Regarding Unit 2 Leak-Before-Break Analysis and Deletion of Containment Humidity Monitors for Unit 1 and Unit 22019-08-22022 August 2019 Unit 2 - Response to Request for Additional Information Regarding Unit 2 Leak-Before-Break Analysis and Deletion of Containment Humidity Monitors for Unit 1 and Unit 2 AEP-NRC-2019-40, Response to Request for Additional Information Regarding License Amendment Request to Address NSAL-15-1, Rev. 02019-07-30030 July 2019 Response to Request for Additional Information Regarding License Amendment Request to Address NSAL-15-1, Rev. 0 AEP-NRC-2018-81, Supplement to Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping2018-11-27027 November 2018 Supplement to Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping AEP-NRC-2018-82, Response to Request for Additional Information Regarding the Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination2018-11-20020 November 2018 Response to Request for Additional Information Regarding the Alternative Request for Elimination of the Reactor Pressure Vessel Threads in Flange Examination AEP-NRC-2018-64, Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping2018-09-27027 September 2018 Response to Request for Additional Information Regarding License Amendment Request for Approval of Application of Proprietary Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping ML18334A2722018-09-18018 September 2018 LTR-SDA-II-18-41-NP, Revision 1, Responses to NRC Questions on the Expanded Scope Leak-Before-Break Evaluations for D.C. Cook, Units 1 and 2. AEP-NRC-2018-45, Response to Request for Additional Information Concerning 2017 Decommissioning Funding Status Report2018-08-0909 August 2018 Response to Request for Additional Information Concerning 2017 Decommissioning Funding Status Report AEP-NRC-2018-01, Response to Request for Additional Information Regarding Generic Letter 2016-012018-05-25025 May 2018 Response to Request for Additional Information Regarding Generic Letter 2016-01 AEP-NRC-2018-23, Response to Request for Additional Information Regarding Independent Spent Fuel Storage Installation Decommissioning Funding Plan2018-04-11011 April 2018 Response to Request for Additional Information Regarding Independent Spent Fuel Storage Installation Decommissioning Funding Plan ML18092A0842018-03-28028 March 2018 Donald C. Cook Nuclear Plant Unit 2, Response to Request for Additional Information Regarding Supplemental Information Regarding the Reactor Vessel Internals Aging Management Program ML17346A7662017-12-0808 December 2017 Enclosures 2 & 3 to AEP-NRC-2017-56 - Response to Request for Additional Information Regarding the License Amendment Request to Revise Emergency Action Levels and EAL Technical Basis Manual AEP-NRC-2017-56, Response to Request for Additional Information Regarding the License Amendment Request to Revise Emergency Action Levels2017-12-0808 December 2017 Response to Request for Additional Information Regarding the License Amendment Request to Revise Emergency Action Levels AEP-NRC-2017-30, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.9.3, Containment Penetrations2017-05-26026 May 2017 Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.9.3, Containment Penetrations AEP-NRC-2017-16, Submittal of Focused Evaluation in Response to March 12, 2012, Request for Information Regarding Near- Term Task Force Recommendation 2.1: Flooding2017-05-11011 May 2017 Submittal of Focused Evaluation in Response to March 12, 2012, Request for Information Regarding Near- Term Task Force Recommendation 2.1: Flooding AEP-NRC-2017-09, Response to Request for Additional Information Regarding the License Amendment Request for the Containment Leakage Rate Testing Program2017-02-27027 February 2017 Response to Request for Additional Information Regarding the License Amendment Request for the Containment Leakage Rate Testing Program AEP-NRC-2016-81, Unit 2 - Supplemental Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTP-425, Relocate Surveillance Frequencies Program to Licensee Control-Risk Informed ...2016-11-0303 November 2016 Unit 2 - Supplemental Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTP-425, Relocate Surveillance Frequencies Program to Licensee Control-Risk Informed ... AEP-NRC-2016-80, Response to NRC Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2016-10-31031 October 2016 Response to NRC Generic Letter 2016-01: Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools AEP-NRC-2016-79, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident2016-10-12012 October 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident AEP-NRC-2016-69, Follow-up Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to License Control-Risk Informed Technical Specification Task Force.2016-09-0909 September 2016 Follow-up Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to License Control-Risk Informed Technical Specification Task Force. AEP-NRC-2016-56, Response to Seventh Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2016-07-12012 July 2016 Response to Seventh Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2016-48, Unit 2 - Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to Licensee-Control...2016-06-16016 June 2016 Unit 2 - Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies Program to Licensee-Control... AEP-NRC-2016-54, Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 582016-06-16016 June 2016 Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-425, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 58 ML16169A1152016-05-0606 May 2016 Donald C. Cook Nuclear Plant Units 1 and 2 - Response to Sixth Request for Additional Information the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2016-24, Response to Fifth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2016-02-19019 February 2016 Response to Fifth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2016-14, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2016-01-21021 January 2016 Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation AEP-NRC-2015-11, Response (Part 2) to Fourth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-12-17017 December 2015 Response (Part 2) to Fourth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term ML15323A4332015-11-16016 November 2015 Supplemental Response to Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions. ML15323A4342015-11-16016 November 2015 Response (Part 1) to Fourth Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-98, Supplemental Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program2015-10-30030 October 2015 Supplemental Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program AEP-NRC-2015-99, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11 and 3.8.1.152015-10-30030 October 2015 Response to Request for Additional Information Re License Amendment Request to Revise Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11 and 3.8.1.15 ML15308A0932015-10-15015 October 2015 Pressurized Water Reactor Owners Group (Pwrog), 15066-NP, Revision 1, Responses to Follow-Up NRC RAI 2 on the D.C. Cook, Units 1 and 2, Reactor Internals Aging Management Program. AEP-NRC-2015-86, Supplemental Response to Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent With. Previously Licensed Conditions.2015-09-18018 September 2015 Supplemental Response to Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent With. Previously Licensed Conditions. AEP-NRC-2015-80, Response to Third Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-08-28028 August 2015 Response to Third Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-88, Response to Request for Additional Information Regarding Proposed Alternative to the American Society of Mechanical Engineers Code, Section XI Repair Requirements2015-08-24024 August 2015 Response to Request for Additional Information Regarding Proposed Alternative to the American Society of Mechanical Engineers Code, Section XI Repair Requirements AEP-NRC-2015-75, Response to Second Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-08-24024 August 2015 Response to Second Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-69, Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program2015-08-0606 August 2015 Response to Follow-Up Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program ML15223A4362015-07-28028 July 2015 PWROG-15066-NP, Revision 0, Responses to Follow-Up NRC RAI 2 on the DC Cook Units 1 and 2 Reactor Internals Aging Management Program. AEP-NRC-2015-64, Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term2015-07-17017 July 2015 Response to Request for Additional Information Regarding the License Amendment Request to Adopt TSTF-490 and Implement Alternative Source Term AEP-NRC-2015-63, Response to Request for Additional Information Regarding 2014 Unit 1 Steam Generator Tube Inspection2015-07-17017 July 2015 Response to Request for Additional Information Regarding 2014 Unit 1 Steam Generator Tube Inspection AEP-NRC-2015-60, Response to a Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.152015-07-0909 July 2015 Response to a Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification Section 3.8.1, AC Sources - Operating, Surveillance Requirements 3.8.1.10, 3.8.1.11, and 3.8.1.15 AEP-NRC-2015-66, Response to Request for Additional Information Regarding Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation2015-07-0202 July 2015 Response to Request for Additional Information Regarding Exigent License Amendment Request Regarding Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation ML18219D0951978-09-29029 September 1978 D.C Cook - Acknowledges 07/12/1978 Letter Advising of Additional Information to Complete NRC Staff'S Review of D.C Cook Nuclear Plant'S Ice - Basket Stress Analysis ML18219D7991978-09-29029 September 1978 Response to Request for Additional Information on Ice Basket Stress Analysis, Prepared by Westinghouse Electric Corporation 2022-01-20
[Table view] |
Text
=
INDIANA MICHIGAN POWER'"
A unit afAmerican Electric Power Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 lndianaMichiganPower.com
. July 30, 2019 AEP-NRC-2019-40 10 CFR 50.90 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission AlTN: Document Control Desk Washington, DC 20555-0001 Donald C. Cook Nuclear Plant \.)nit 1 and Unit 2
- Response to Request for Additional Information Regardin{License Amendment Request to Address NSAL-15-1.
References:
- 1. Letter from Q. S. Lies, Indiana Michigan Power Company (l&M), to U. S. Nuclear Regulatory Commission (NRC), "Donald C. Cook Nuclear Plant, Unit 1 and Unit 2, License Amendment
- Request to Address Issues Identified in Westinghouse Document NSAL-15-1 ," dated February 26, 2019, Agencywide Documents Access and Management System Accession (ADAMS)
No. ML19060A060.
- 2. E-mail from R. F. Kuntz, NRC, to M. K. Scarpello, l&M, "D. C. Cook Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to address NSAL-15-1 (EPID L-2018-LLA-0246),"
dated July 3, 2019.
This letter provides Indiana Michigan Power Company's (l&M), licensee for Donald C. Cook Nuclear Plant (CNP) Unit 1 and Unit 2, response to the Request for Additional Information (RAI) by the U. S.
Nuclear Regulatory Commission (NRC) concerning a License Amendment Request (LAR) for an amendment to Technical Specifications for CNP, Unit 1 and Unit 2.
By Reference 1, l&M submitted the LAR to address a deficiency identified in the Westinghouse Nuclear Safety Advisory Letter (NSAL) NSAL-15-1, Rev 0. By Reference 2, the NRC transmitted an RAI concerning the LAR submitted by l&M in Reference 1.
Enclosure 1 to this letter provides an affirmation statement. l&M is providing Enclosure 2 to this letter as its response to the NRC's RAI from Reference 2.
U. S. Nuclear Regulatory Commission AEP-NRC-2019-40 Page 2 There are no new regulatory commitments made in this letter. Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Director, at (269) 466-2649.
Sincerely, 2~J.G Site Vice President JMT/mll
U. S. Nuclear Regulatory Commission AEP-NRC-2019-40 Page 3
Enclosures:
- 1. Affirmation
- 2. Response to Request for Additional Information Regarding License Amendment Request to Address c:1 Deficiency Identified in the Westinghouse Nuclear Safety Advisory Letter (NSAL)
NSAL-15-1, Rev 0.
c: R. J. Ancona - MPSC R. F. Kuntz - NRC Washington D.C.
EGLE - RMD/RPS NRC Resident Inspector D. J. Roberts - NRC Region Ill ,
A. J. Williamson - AEP Ft. Wayne, w/o enclosures
Enclosure 1 to AEP-NRC-2019-40 AFFIRMATION I, Q. Shane Lies, being duly swom, state that I am the Site Vice President of Indiana Michigan Power Company (l&M), that I am authorized to sign and file this request with the U. S. Nuclear Regulatory Commission on behalf of l&M, and that the statements made and the matters set forth herein pertaining to l&M are true and correct to the best of my knowledge, information, and belief.
Indiana Michigan Power Company f)~J.~
a!s:'nelies Site Vice President SWORN TO AND SUBSCRIBED BEFORE ME THIS 30 DAY OF j'v- \'-( I 2019
~~a~~
My Commission Expires Oo? / dO / d) S--
.\
/'
/
Enclosure 2 to AEP-NRC-2019-40 Response to Request for Additional Information Regarding License Amendment Request to Address a Deficiency Identified in the Westinghouse Nuclear Safety Advisory Letter (NSAL)
NSAL-15-1, Rev 0.
The U. S. Nuclear Regulatory Commission (NRC) staff is reviewing the Indiana Michigan Power Company (l&M), the Licensee for Donald C. Cook Nuclear Plant (CNP) Unit 1 and Unit 2, License Amendment Request (LAR) application dated February 26, 2019, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19060A060). The proposed change will expand criteria within TS 3.2.1 Surveillance Requirements (SRs) which will apply an appropriate penalty factor to the heat flux hot channel factor (Fa(Z)), specifically the measured tra*nsient (Fow(Z)).
The proposed modification of the SR was to address a deficiency identified in the Westinghouse Nuclear Safety Advisory Letter (NSALJ NSAL-15-1, Rev. 0. The NRC staff has determined that additional information is necessary in order to complete its review.
By electronic mail dated July 3, 2019, the NRC transmitted a Request for Additional Information (RAI) regarding the February 26, 2019, LAR.
SRXB RAl-1 Regulatory Basis:
10 CFR 50.34, "Contents of applications; technical information," requires that safety analysis reports analyze the design and performance of structures, systems, and components provided for the prevention of accidents and the mitigation of the consequences of accidents. As part of the core reload process, licensees perform reload safety evaluations to ensure that their safety analyses remain bounding for the design cycle. To confirm that the analyses remain bounding,.they confirm that the inputs to the safety analyses are conservative with respect to the current design cycle. These inputs are checked using analytical models, and if key safety analysis parameters are not bounded, further analysis of the affected transients or accidents is performed to ensure that the applicable acceptance criteria are satisfied.
In 10 CFR 50.36, Technical specifications,"the NRG established its regulatory requirements related to the content of TSs. As discussed in 10 CFR 50.36(c)(3), surveillance requirements (SRs) are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the LCOs will be met.
Fo is an input used in safety analyses and is a parameter that is subject to the surveillance requirements of 10 CFR 50. 36.
SRXB RAl-1 a) a) Does the fuel thermal conductivity degradation (TCD) issue, as described in NRG Information Notice 2012-21, impact measured transient Fo(Z)? If so,
Enclosure 2 to AEP- NRC-2019-40 Page2 l&M Response to SRXB RAl-1a)
The TCD issue does not impact the measured transient Fa(Z), Faw(Z), and is not effected by the additional surveillance actions. Technical Specification (TS) Section 3.2.1, "Heat Flux Hot Channel Factor," ensures that Fa(Z) is maintained within the limits assumed in the plant safety analysis.
Compliance with the TS Limiting Condition of Operation (LCO) is demonstrated by measuring the steady-state peak power density at each axial elevation and verifying that both the steady-state heat flux hot channel factor (Fac(Z)), and the Faw(Z), are within the Fa(Z) limits specified in the cycle specific Core Operating Limits Report (COLR). The Fa(Z) limit used in the safety analysis incorporates the effect of TCD on peak cladding temperature (PCT) in the Westinghouse Electric Company furnished realistic emergency core cooling system (ECCS) evaluation models as discussed in RAl-1b).
SRXB RAl-1b) b) Confirm that the TCD issue was addressed for CNP. Otherwise, explain how fuel TCD is accounted for.
l&M Response to SRXB RAl-1b)
The TCD issue was addressed by l&M letter dated March 19, 2012, (ML12088A104) in response to NRC request (ML12041A384) to provide information regarding the effect of a potentially significant
on peak cladding temperature in the Westinghouse Electric Company furnished realistic emergency core cooling system (ECCS) evaluation models. The submitted report provided an estimate of the effect of the error on the predicted peak cladding temperature (PCT) for CNP Unit 1 and Unit 2. The report was supplemented by l&M letter dated June 11, 2012, (ML12173A025), and referred to a letter from Westinghouse Electric Company dated March 7, 2012, (ML12072A035).
l&M's response was that in order to support the Loss of Coolant Accident (LOCA) evaluation of thermal conductivity degradation (TCD) on the best estimate LOCA (BELOCA) analyses of record (AOR), Westinghouse Nuclear Design proposed changes to the peaking factor limits. The Westinghouse LOCA group evaluated TCD with these proposed limits to demonstrate that the TCD objectives for both units are met. Presently, the Fa(Z) limit remains the same with a lowering of the enthalpy rise hot channel factor (FhH) limit on both units with respect to TCD. The rationale for lowering the FhH limit was to fully take advantage of the available nuclear design margin to support the LOCA TCD. The COLR was updated appropriately to ensure the plant is operated within these new constraints. l&M's explanation of peaking factor adjustments, and rationale for each adjustment, was evaluated by the NRC in letter dated March 7, 2013, (ML13077A137).
The NRC evaluated l&M's March 19, 2012, letter, along with its supplemental information and Westinghouse letter. The NRC staff performed a detailed review of the input parameters and limiting results that were used to generate the estimate and concluded that the estimate enables the current analysis to maintain a high level of probability that the 2200 °F PCT acceptance criterion is not exceeded, The NRC staff determined that the licensee's response was acceptable because it showed that the cycle-specific core designs meet the analyzed limits.
to AEP- NRC-2019-40 Page3 The NRC determined in their March 7, 2013, letter that the March 19, 2012, l&M letter, along with its supplemental information and the March 7, 2012, Westinghouse letter satisfied the reporting requirements of 10 CFR 50.46(a)(3). The l&M letters dated March 19, 2012, and June 11, 2012, also enabled the NRC to: (1) determine that it agreed with the licensee's assessment of the significance of the error; (2) confirm that the evaluation model remained adequate; (3) verify that the licensee continued to meet the PCT acceptance criterion promulgated by 10 CFR 50.46(b); and (4) determine that the licensee's proposed schedule for reanalysis was acceptable in light of the information provided.
- Moving forward, the TCD evaluation is maintained by being assessed for updates due to modifications and changes to the facility. For instance, the Unit 1 TCD evaluation was reassessed as part of the project to restore normal reactor coolant system pressure and temperature consistent with previously licensed conditions, and received NRC review and approval as reflected in their letter dated November 30, 2015 (ML14197A097).