10 CFR 63.7, License Not Required for Certain Preliminary Activities

From kanterella
(Redirected from 10 CFR 63.7)
Jump to navigation Jump to search

License not required for certain preliminary activities The requirement for a license set forth in § 63.3(a) is not applicable to the extent that DOE receives and possesses source, special nuclear, and byproduct material at a geologic repository at the Yucca Mountain site:

a

(a) For purposes of site characterization; or

b

(b) For use, during site characterization or construction, as components of radiographic, radiation monitoring, or similar equipment or instrumentation.


External Links

NRC website 10 CFR 63.7