DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA
===Subpart A-General Provisions===
Sec.
- 63.1 Purpose and scope.
- 63.2 Definitions.
- 63.3 License required.
- 63.4 Communications and records.
- 63.5 Interpretations.
- 63.6 Exemptions.
- 63.7 License not required for certain preliminary activities.
- 63.8 Information collection requirements: OMB Approval.
- 63.9 Employee protection.
- 63.10 Completeness and accuracy of information.
- 63.11 Deliberate misconduct.
===Subpart B-Licenses===
- 63.15-Site characterization.
- 63.16-Review of site characterization activities.
- 63.21 Content of application.
- 63.22 Filing and distribution of application.
- 63.23 Elimination of repetition.
- 63.24 Updating of application and environmental impact statement.
- 63.31 Construction authorization.
- 63.32 Conditions of construction authorization.
- 63.33 Amendment of construction authorization.
- 63.41 Standards for issuance of a license.
- 63.42 Conditions of license.
- 63.43 License specification.
- 63.44 Changes, tests, and experiments.
- 63.45 Amendment of license.
- 63.46 Particular activities requiring license amendment.
US/IAEA Safeguards Agreement
- 63.47 Facility information and verification.
- 63.51 License amendment for permanent closure.
- 63.52 Termination of license.
===Subpart C-Participation by State Government, Affected Units of Local Government, and Affected Indian Tribes===
- 63.61 Provision of information.
- 63.62 Site review.
- 63.63 Participation in license reviews.
- 63.64 Notice to State.
- 63.65 Representation.
===Subpart D-Records, Reports, Tests, and Inspections===
- 63.71 Records and reports.
- 63.72 Construction records.
- 63.73 Reports of deficiencies.
- 63.74 Tests.
- 63.75 Inspections.
- 63.78 Material control and accounting records and reports.
===Subpart E-Technical Criteria===
- 63.101 Purpose and nature of findings.
- 63.102 Concepts.
- 63.111 Performance objectives for the geologic repository operations area through permanent closure.</a>
Preclosure Safety Analysis
<a href="part063-0112.html">63.112 Requirements for preclosure safety analysis of the geologic repository operations area.
- 63.113 Performance objectives for the geologic repository after permanent closure.
- 63.114 Requirements for performance assessment.
- 63.115 Requirements for multiple barriers.
- 63.121 Requirements for ownership and control of interests in land.
===Subpart F-Performance Confirmation Program===
- 63.131 General requirements.
- 63.132 Confirmation of geotechnical and design parameters.
- 63.133 Design testing.
- 63.134 Monitoring and testing waste packages.
===Subpart G-Quality Assurance===
- 63.141 Scope.
- 63.142 Quality assurance criteria.
- 63.143 Implementation.
- 63.144 Quality assurance program change.
===Subpart H-Training and Certification of Personnel===
- 63.151 General requirements.
- 63.152 Training and certification program.
- 63.153 Physical requirements.
===Subpart I-Emergency Planning Criteria===
- 63.161 Emergency plan for the geologic repository operations area through permanent closure.
===Subpart J-Violations===
- 63.171 Violations.
- 63.172 Criminal penalties.
===Subpart K-Preclosure Public Health and Environmental Standards===
- 63.201 Purpose and scope.
- 63.202 Definitions for Subpart K.
- 63.203 Implementation of Subpart K.
- 63.204 Preclosure standard.
===Subpart L-Postclosure Public Health and Environmental Standards===
- 63.301 Purpose and scope.
- 63.302 Definitions for Subpart L.
- 63.303 Implementation of Subpart L.
- 63.304 Reasonable expectation.
- 63.305 Required characteristics of the reference biosphere.
- 63.311 Individual protection standard after permanent closure.
- 63.312 Required characteristics of the reasonably maximally exposed individual.
- 63.321 Individual protection standard for human intrusion.
- 63.322 Human intrusion scenario.
- 63.331 Separate standards for protection of ground water.
- 63.332 Representative volume.
- 63.342 Limits on performance assessments.
- 63.343 Severability of individual protection and ground-water protection standards.
Authority: Atomic Energy Act secs. 51, 53, 62, 63, 65, 81, 161, 182, 183, (42 U.S.C. 2071, 2073, 2092, 2093, 2095, 2111, 2201, 2232, 2233); Energy Reorganization Act secs. 201, 202, 206, 211 (42 U.S.C. 5841, 5842, 5846, 5851); sec 14, Pub. L. 95- 601 (42 U.S.C. 2021a); National Environmental Policy Act sec. 102 (42 U.S.C. 4332); Nuclear Waste Policy Act secs. 114, 117, 121 (42 U.S.C. 10134, 10137, 10141; sec. 1704, 112 Stat. 2750 (44 U.S.C. 3504 note); Energy Policy Act of 2005, Pub. L. 109-58, 119 Stat. 594 (2005).
Source: 66 FR 55792, Nov. 2, 2001, unless otherwise noted.
- 73 FR 63572, Oct. 24, 2008; 74 FR 10829, Mar. 13, 2009; 77 FR 39908, Jul. 6, 2012]
External Links
NRC website 10 CFR 63
Code of Federal Regulations |
---|
Title 10 Part 63 - DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA |
|
|