10 CFR 63

From kanterella
Jump to navigation Jump to search

DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA
===Subpart A-General Provisions===
Sec.

63.1 Purpose and scope.
63.2 Definitions.
63.3 License required.
63.4 Communications and records.
63.5 Interpretations.
63.6 Exemptions.
63.7 License not required for certain preliminary activities.
63.8 Information collection requirements: OMB Approval.
63.9 Employee protection.
63.10 Completeness and accuracy of information.
63.11 Deliberate misconduct.

===Subpart B-Licenses===

63.15-Site characterization.
63.16-Review of site characterization activities.
63.21 Content of application.
63.22 Filing and distribution of application.
63.23 Elimination of repetition.
63.24 Updating of application and environmental impact statement.
63.31 Construction authorization.
63.32 Conditions of construction authorization.
63.33 Amendment of construction authorization.
63.41 Standards for issuance of a license.
63.42 Conditions of license.
63.43 License specification.
63.44 Changes, tests, and experiments.
63.45 Amendment of license.
63.46 Particular activities requiring license amendment.

US/IAEA Safeguards Agreement

63.47 Facility information and verification.
63.51 License amendment for permanent closure.
63.52 Termination of license.

===Subpart C-Participation by State Government, Affected Units of Local Government, and Affected Indian Tribes===

63.61 Provision of information.
63.62 Site review.
63.63 Participation in license reviews.
63.64 Notice to State.
63.65 Representation.

===Subpart D-Records, Reports, Tests, and Inspections===

63.71 Records and reports.
63.72 Construction records.
63.73 Reports of deficiencies.
63.74 Tests.
63.75 Inspections.
63.78 Material control and accounting records and reports.

===Subpart E-Technical Criteria===

63.101 Purpose and nature of findings.
63.102 Concepts.
63.111 Performance objectives for the geologic repository operations area through permanent closure.</a>

Preclosure Safety Analysis

<a href="part063-0112.html">63.112 Requirements for preclosure safety analysis of the geologic repository operations area.

63.113 Performance objectives for the geologic repository after permanent closure.
63.114 Requirements for performance assessment.
63.115 Requirements for multiple barriers.
63.121 Requirements for ownership and control of interests in land.

===Subpart F-Performance Confirmation Program===

63.131 General requirements.
63.132 Confirmation of geotechnical and design parameters.
63.133 Design testing.
63.134 Monitoring and testing waste packages.

===Subpart G-Quality Assurance===

63.141 Scope.
63.142 Quality assurance criteria.
63.143 Implementation.
63.144 Quality assurance program change.

===Subpart H-Training and Certification of Personnel===

63.151 General requirements.
63.152 Training and certification program.
63.153 Physical requirements.

===Subpart I-Emergency Planning Criteria===

63.161 Emergency plan for the geologic repository operations area through permanent closure.

===Subpart J-Violations===

63.171 Violations.
63.172 Criminal penalties.

===Subpart K-Preclosure Public Health and Environmental Standards===

63.201 Purpose and scope.
63.202 Definitions for Subpart K.
63.203 Implementation of Subpart K.
63.204 Preclosure standard.

===Subpart L-Postclosure Public Health and Environmental Standards===

63.301 Purpose and scope.
63.302 Definitions for Subpart L.
63.303 Implementation of Subpart L.
63.304 Reasonable expectation.
63.305 Required characteristics of the reference biosphere.
63.311 Individual protection standard after permanent closure.
63.312 Required characteristics of the reasonably maximally exposed individual.
63.321 Individual protection standard for human intrusion.
63.322 Human intrusion scenario.
63.331 Separate standards for protection of ground water.
63.332 Representative volume.
63.342 Limits on performance assessments.
63.343 Severability of individual protection and ground-water protection standards.

Authority: Atomic Energy Act secs. 51, 53, 62, 63, 65, 81, 161, 182, 183, (42 U.S.C. 2071, 2073, 2092, 2093, 2095, 2111, 2201, 2232, 2233); Energy Reorganization Act secs. 201, 202, 206, 211 (42 U.S.C. 5841, 5842, 5846, 5851); sec 14, Pub. L. 95- 601 (42 U.S.C. 2021a); National Environmental Policy Act sec. 102 (42 U.S.C. 4332); Nuclear Waste Policy Act secs. 114, 117, 121 (42 U.S.C. 10134, 10137, 10141; sec. 1704, 112 Stat. 2750 (44 U.S.C. 3504 note); Energy Policy Act of 2005, Pub. L. 109-58, 119 Stat. 594 (2005).
Source: 66 FR 55792, Nov. 2, 2001, unless otherwise noted.

Federal Register

73 FR 63572, Oct. 24, 2008; 74 FR 10829, Mar. 13, 2009; 77 FR 39908, Jul. 6, 2012]


External Links

NRC website 10 CFR 63