10 CFR 60.3, License Required

From kanterella
(Redirected from 10 CFR 60.3)
Jump to navigation Jump to search

License required

a

(a) DOE shall not receive or possess source, special nuclear, or byproduct material at a geologic repository operations area except as authorized by a license issued by the Commission pursuant to this part.

b

(b) DOE shall not commence construction of a geologic repository operations area unless it has filed an application with the Commission and has obtained construction authorization as provided in this part. Failure to comply with this requirement shall be grounds for denial of a license.


External Links

NRC website 10 CFR 60.3