05000423/LER-1997-010, Forwards LER 97-010-00,documenting Condition Determined at Millstone Unit 3 on 970129 Per 10CFR50.73(a)(2)(v). Commitments Attached

From kanterella
Jump to navigation Jump to search
Forwards LER 97-010-00,documenting Condition Determined at Millstone Unit 3 on 970129 Per 10CFR50.73(a)(2)(v). Commitments Attached
ML20136A547
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/28/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20136A551 List:
References
B16205, NUDOCS 9703070200
Download: ML20136A547 (5)


LER-2097-010, Forwards LER 97-010-00,documenting Condition Determined at Millstone Unit 3 on 970129 Per 10CFR50.73(a)(2)(v). Commitments Attached
Event date:
Report date:
4232097010R00 - NRC Website

text

l

  • ""id"'r "- ("""'" ' 3* *"'"'"' " f *333 '

Northerst

\ Nuclear Energy waion, Nm.iear ro.,r statiou Northeast Nuclear Energy Company P.O. Ilos 123

' Waterfor 1, Cr OMM Ol28 l (860)447 1791 Fax (860) 444 4277 The Northeast Utilities System February 28,1997 Docket No. 50-423 B16205 Re:10CFR 50.73(a)(2)(v)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 4

Millstone Nuclear Power Station Unit 3 l Licensee Event Report 97-010-03

Submitted Pursuant to 10CFR 50.7&a)(2)M This letter forwards Licensee Event Report 97-010-00, documenting a condition that was determined at Millstone Unit No. 3 on January 29,1997. This LER is submitted pursuant to 10CFR 50.73(a)(2)(v). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

. Should you have any questions regarding this submittal, please contact Mr.

James M. Peschel at (860) 437-5840. f l

Very truly yours, ,

NORTHEAST NUCLEAR ENERGY COMPANY M[,

D  ;

} T QN l J  ;

G. D. Hicks "

Unit Director, Millstone Unit No. 3 070082 9703070200 970228 y )'

DR ADOCK0500g3 5.8585P555#R )

, U.S. Nuclear Regulatory Commission B16205/Page 2

Attachment:

1) NNECO's commitments in response to LER 97-010-00
2) LER 97-010-00 cc: H. J. Miller, Region l Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 W. D. Travers, Dr., Director, Special Projects l

l

Docket No. 50-423 B16205 I Attachment 1 i Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To (LER 97-010-00) 1 l

i l

l February 28,1997 i

I

4 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Any other actions discussed in the submittal represent intended or i planned actions by NNECO. They are described to the NRC for the NRC's

information and are not regulatory commitments. Please notify the Manager -
Nuclear Licensing a 'he Millstone Nuclear Power Station Unit No. 3 of any questions regarding this docu.wa. or any associated regulatory commitments.

Number Commitment Due B16205-01 A review of calculations, setpoints and Prior to entry into components will be performed to ensure mode 4.

voltage for safety related equipment will be adequate and to restore configuration control

] for the degraded grid voltage calculations.-

i Setpoints and/or components will be revised or modified, if needed.

. I r

f

, l l

4 t

i 4

a

4 1

{ Docket No. 50-423

.' S16205 1.

l-i 4

1 i

)

i Attachment 2 9

Yr

! Millstone Nuclear Power Station, Unit No. 3 ,

I NNECO's Submittal of (LER 97-010-00) i i

i 4

3 1

1 i

'I 1

i k'

1

)

4 i

5 A

1 i

February 28,1997 l 1

l l