05000423/LER-1997-003, Forwards LER 97-003-00 Which Documents Condition That Was Determined at Mnps,Unit 3 on 970113,per 10CFR50.73(a)(2)(ii) (B).List of Commitments,Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 97-003-00 Which Documents Condition That Was Determined at Mnps,Unit 3 on 970113,per 10CFR50.73(a)(2)(ii) (B).List of Commitments,Encl
ML20134P574
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/11/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134P578 List:
References
B16163, NUDOCS 9702260032
Download: ML20134P574 (5)


LER-2097-003, Forwards LER 97-003-00 Which Documents Condition That Was Determined at Mnps,Unit 3 on 970113,per 10CFR50.73(a)(2)(ii) (B).List of Commitments,Encl
Event date:
Report date:
4232097003R00 - NRC Website

text

_ _.

\ Northeast "- "=

  • Rope Ferry Rd., Waterford, CT

, , Utilities System r.o. u 128 l Waterford, CT 06385-0128 (20*l) 447-1791 l

i I

February 11,1997 Docket No. 50-423 B16163 Re:10CFR50.73(a)(2)(ii)(B) l

{

, U. S. Nuclear Regulatory Commission l Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 Licensee Event Report 97-003-00 Submitted Pursuant to 10CFR50.73(a)(2)(ii)

This letter forwards Licensee Event Report 97-003-00, documenting a condition ,

that was determined at Millstone Unit No. 3 on January 13,1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(ii)(B). NNECO's commitments in response to this event are contained within Attachment 1 and the LER is contained in Attachment 2 to this letter.

Should you have any questions regarding this submittal, please contact Mr.

James M. Peschel at (860) 437-5840.

Very truly yours,

-v f}V NORTHEAST NUCLEAR ENERGY COMPANY

\

250053 g i

[G. D. HicVMillstone Unit Director, ~ Unit No. 3 9702260032 970211 DR ADOCK0500g3

- . - - - . . = - . .

, U.S. Nucle r Regul; tory Commi:sion

- B16163\Page 2

Attachment:

1) NNECO's commitments in response to LER 97-003-00
2) LER 97-003-00 cc: H. J. Miller, Region I Administrator A. C. Cerne, Senior Resident inspector, Millstone Unit No. 3 J. W. Andersen, NRC Project Manager, Millstone Unit No. 3  :

W. D. Travers, Dr., Director, Special Projects I

i i

l i

f F

1 l

Docket No. 50-423 B16163 i

Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments In Response To (LER 97-003-00) 1 1

l February 1997 l

l

)

j .

1

, U.S. Nuclecr R:gulatory Commission

, , B16163\ Attachment 1\Page 2 Enclosure List of Regulatory Commitments The following table identifies those actions committed to by NNECO in this document. Any other actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager. - 1 Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions I regarding this document or any associated regulatory commitments.

I Number Commitment Due B16163-01 An svaluation of the RSS water column Prior to Unit Startu;5 ,

separation issue will be performed to J determine if transient piping and I equipment loads are acceptable or require design modification.

I l

i i

Docket No. 50-423 B16163 Attachment 2 Millstone Nuclear Power Station, Unit No. 3 NNECO's Submittal of (LER 97-003-00)

February 1997 i