Forwards LER 97-002-00 Re Torquing of Battery Connections Not Performed as Part of Connection Tightness Checks. Util Commitments in Response to Events Contained within Attachment 1 to Ltr
ML20134J776
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/07/1997
From: Hicks G
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134J779 List:
References
B16148, NUDOCS 9702120298
Download: ML20134J776 (3)


LER-2097-002, Forwards LER 97-002-00 Re Torquing of Battery Connections Not Performed as Part of Connection Tightness Checks. Util Commitments in Response to Events Contained within Attachment 1 to Ltr
Event date:
Report date:
4232097002R00 - NRC Website

text

_ . - - . . - - .-._ - -.. - ~- .... ... - - . .- - . - . ~ . - - .-. ... . ..

u, Northeast Miitzione office. . nope rerry na., r.ierrora. cr Utilities System P.o.i w 128

  • Waterford, CT 06385-0128 (203) 447-1791 1

l February 7,1997 Docket No 50-423 B16148

Re
10CFR50.73(a)(2)(i) l U. S. Nuclear Rogulatory Commission Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station Unit 3 LicensenEventReport.97.-002-00 Submitted Pursuant to 10CFR 50.73(a)(2)(i)

This letter forwards Licensee Event Report 97-002-00, documenting a condition that was determined at Millstone Unit No. 3 on January 8,1997. This LER is submitted pursuant to 10CFR 50.73(a)(2)(i). NNECO's commitments in response to this event are contained within Attachment 1 to this letter.

l Should you have any questions regarding this submittal, please contact Mr.

James M. Peschel at (860) 437-5840.

)

I l

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY 8

x 7

l . . Hicks \

l. Director, Millstone Unit No. 3 } l 1

l 120003 i 9702120298 970207 PDR ADOCK 05000423 S PDR s

t .

U.S. Nucl:ar Regulatory Commission B16148\Page 2 i '

Attachment:

1) NNECO's commitments in response to LER 97-002-00

'. 2) LER 97-002-00 cc: H. J. Miller, Region 1 Administrator A. C. Corne, Senior Resident inspector, Millstone Unit No. 3 l J. W. Andersen, NRC Project Manager, Millstone Unit No. 3 I W. D. Travers, Dr., Director, Special Projects  ;

i i

l l

e Docket No. 50-423 B16146

+

t Attachment 1 Millstone Nuclear Power Station, Unit No. 3 NNECO's Commitments in Response To ilJiRDI-902-901 l

l l

l February 1997  ;

l l

' U.S. Nuclear Regulatory Commission i

  • B16148%ttachment 1Page 2 i,  ;

Enclosure List of Regulatory Commitments l The following table identifies those actions committed to by NNECO in this document. Any other actions discussed in the submittal represent intended or planned actions by NNECO. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the Manager -

Nuclear Licensing at the Millstone Nuclear Power Station Unit No. 3 of any questions regarding this document or any ==widM regulatory commitments.

Number Commitment Due B16148-01 Mechanical and electrical surveillance March 30,1997 procedures will be reviewed to ensure they satisfy Technical Specification requirements.

B16148-02 Battery surveillance procedures will be March 30,1997 reviewed for compliance with IEEE Standard 450-1980.

B16148-03 The FSAR will be revised to reflect the June 30,1997 commitments to IEEE Standard 450- l 1980. i B16148-04 Technical Specification surveillance June 30,1997 I requirements and the FSAR will be reviewed for requirements pertinent to mechanical maintenance and olectrical surveillance procedures.