| Q | CCA | Title |
---|
05000354/FIN-2017004-01 | 2017Q4 | H.2 | Scaffold Installed with Insufficient Separation from Safety Related Equipment |
05000354/FIN-2017004-02 | 2017Q4 | P.5 | Inadequate Design Control of Emergency Diesel Generator Speed Switch |
05000354/FIN-2018001-01 | 2018Q1 | | Implementing Procedures for Beyond Design Basis FLEX Mitigating Strategies Not Followed |
05000354/FIN-2018001-02 | 2018Q1 | | Concern Regarding As-Found Values for Safety Relief Valve Lift Setpoints Exceed Technical Specification Allowable Limit |
05000354/FIN-2018410-01 | 2018Q1 | | Security |
05000354/FIN-2018002-01 | 2018Q2 | H.1 | Inadequate Instructions for Station Service Water Pump Maintenance |
05000354/FIN-2018003-02 | 2018Q3 | H.3 | Inadequate Procedures for Restoration of the A Reactor Feed Pump Turbine Following Maintenance |
05000354/FIN-2018003-03 | 2018Q3 | H.6 | inadequate Procedures for Fuel Conditioning Results in Multiple Fuel Leaks |
05000354/FIN-2018003-04 | 2018Q3 | | Enforcement Action (EA)-18-044: EGM on Dispositioning BWR Licensee Noncompliance With TS Containment Requirements During Operations With A Potential For Draining The Reactor Vessel (EGM-11-003) |
05000354/FIN-2018003-05 | 2018Q3 | | Minor Violation |
05000354/FIN-2018403-01 | 2018Q3 | H.3 | Security |