05000348/LER-1998-002, Forwards LER 98-002-00 Re SG Tube Leakage Investigation Repair & Evaluation.Commitments Contained in Corrective Action Section of Event Rept,Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 98-002-00 Re SG Tube Leakage Investigation Repair & Evaluation.Commitments Contained in Corrective Action Section of Event Rept,Listed
ML20151U234
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 09/03/1998
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20151U239 List:
References
NUDOCS 9809100332
Download: ML20151U234 (1)


LER-2098-002, Forwards LER 98-002-00 Re SG Tube Leakage Investigation Repair & Evaluation.Commitments Contained in Corrective Action Section of Event Rept,Listed
Event date:
Report date:
3482098002R00 - NRC Website

text

. +-

Dave Morey Southern Nuclear Vice President Oparating C:mpany Farley Project R0. Box 1295 Birmingham. Alabama 35201 Tel 205.992.5131 September 3, 1998 COMPANY Energy to Serve %rWorld

Docket No.: 50-348 10 CFR 50.73 l

I U. S. Nuclear Regulatory Commission 1 ATTN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant - Unit 1 l

Licensee Event Report No. 98-002-00 Steam Generator Tube Leakage Investination. Reoair. and Evaluation  ;

Ladies and Gentlemen:

Joseph M. Farley Nuclear Plant - Unit i Licensee Event Report No. 98-002-00 is being voluntarily submitted. The following NRC commitments are contained in the corrective action section of this l event report, no other corrective actions should be considered formal NRC conunitments. '

. A + Point inspection of the ends (excluding lower full length tubesheet sleeve ends) of sleeved tubes will be performed during future outages on both units as appropriate.

. Eddy current analyst training will be revised to address this event prior to the next outage.

If you have any questions, please advise.

Respectfully submitted, f

Dave Morey 7

EWC/maf980020Jac Enclosure cc: Mr. L. A. Reyes, Region II Administrator Mr. J. I. Zimmerman, NRR Project Manager / g'J/

Mr. T. P. Johnson, Plant Sr. Resident Inspector 9909100332 900903 ADOCK 05000348 ..,

U PDR -

S ,, ,,

PDR L