| Q | CCA | Title |
---|
05000339/FIN-2017001-01 | 2017Q1 | H.5 | Inadequate Design Control of 2 -RC- P-1C Piping Supports |
05000338/FIN-2017001-02 | 2017Q1 | | Chemical Addition System Outside of Technical Specification Due to Excessive Unseating Thrust on MOVs |
05000338/FIN-2017007-03 | 2017Q2 | | Failure to Obtain NRC Review and Approval for Changes to Safety-Related Dike West of Unit 2 Turbine Building |
05000338/FIN-2017007-01 | 2017Q2 | | Failure to Qualify MCCs in Cable Penetration areas in accordance with 10 CFR 50.49 |
05000338/FIN-2017007-02 | 2017Q2 | | Failure to Qualify EGS Quick Disconnects in Accordance With IEEE Std. 323-1974 |
05000338/FIN-2017403-01 | 2017Q4 | H.1 | Security |