05000336/LER-1997-016, Forwards LER 97-016-00 Per 10CFR50.73(a)(2)(i)(B).Also Includes Commitments Made in Ltr

From kanterella
Jump to navigation Jump to search
Forwards LER 97-016-00 Per 10CFR50.73(a)(2)(i)(B).Also Includes Commitments Made in Ltr
ML20141G104
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/15/1997
From: Bowling M
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141G109 List:
References
B16453, NUDOCS 9705220166
Download: ML20141G104 (2)


LER-2097-016, Forwards LER 97-016-00 Per 10CFR50.73(a)(2)(i)(B).Also Includes Commitments Made in Ltr
Event date:
Report date:
3362097016R00 - NRC Website

text

- . . . _ - - - _ - _ __-. - -. - .

I' '[ Northeast ""I " I "" "' ' t """'" ^" ' ' "'"'""' 'T "'"85 kfjff)/ NuclearEnergy u,nsi..n,. snci ., vo.,, soi .n s,.nh ... suci a, En ro con,pon3 P O IM 128 4 userf ,nt. CT oram , u128 (8bO) ++7- 1741 fat (800) +++ 427' ne sonhe.4i ninneO7"i5,1997 Docket No. 50-336 B16453 Re: 10 CFR 50.73(a)(2)(i)(B)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-016-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on April 15,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i)(B).

The following are NNECO's commitments made within this letter.

B16453-01: The surveillance procedure for the Turbine Driven Auxiliary Feedwater -

(TDAFW) Pump will be revised prior to entry into Mode 4 frorr the current outage to ensure that the required 15 minute run of the TDAF W Pump is started from the CR and is performed prior to unit entry into Mode 3.

B16453-02: Technical Specification surveillance procedures will be reviewed to ensure compliance with Technical Specifications surveillance ,

requirements as part of Millstone Unit 2 Operational Readiness Plan i (Reference NOV 336/96-08-07, NNECO Commitment No. B16076-2).

Very truly yours, l 1

NORTHEAST NUCLEAR ENERGY COMPANY m o\ '

9705220166 970515 M. L. Bowling J gDR ADOCK0500g6 Millstone Unit No. 2 Recovery Officer cc: see page 2 I

_ ,_ l$!!fOlNll[$l5l$$!

U. S. Nuclear Regulatory Commission i o .

B16453/Page 2

Attachment:

LER 97-016-00 cc: W. D. Travers, Director of Special Projects H. J. Miller, Region i Administrator D. P. Beaulieu, Senior Resident Inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2 l

l l

r