05000336/LER-1997-008, Forwards LER 97-008-00,documenting Event Occurred at Unit 2 on 970310.Commitments Made within Ltr Listed as Submitted

From kanterella
Jump to navigation Jump to search
Forwards LER 97-008-00,documenting Event Occurred at Unit 2 on 970310.Commitments Made within Ltr Listed as Submitted
ML20137T631
Person / Time
Site: Millstone Dominion icon.png
Issue date: 04/08/1997
From: Price J
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20137T636 List:
References
B16371, NUDOCS 9704160134
Download: ML20137T631 (2)


LER-2097-008, Forwards LER 97-008-00,documenting Event Occurred at Unit 2 on 970310.Commitments Made within Ltr Listed as Submitted
Event date:
Report date:
3362097008R00 - NRC Website

text

l

. - s,..)N ortheast RWeny Rd. (Route 156) TaufwW M83

$ Nuclear Energy Mahtom Nudear Power Stadon Northeast Nudear Energy Company P.O. Box 128 Waterford, CT 06385-0128 (203) 447-1791 Fax (203) 444-4277 The Northeast Utilities System April 8,1997 Docket No. 50-336 B16371 Re: 10 CFR 50.73(a)(2)(i)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 l

1 This letter forwards Licensee Event Report (LER) 97-008-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. 2 on March 10,1997. This LER is being submitted pursuant to 10 CFR 50.73(a)(2)(i). l l

The following are NNECO's commitments made within this letter. l B16371-01: The surveillance procedures for testing the bistables will be revised prior to entry into Mode 4 from the current outage to verify the red status lamps on the bistables.

B16371-02: The facility Generic Letter 96-01 review, which will verify that all circuits are tested properly from the detector to the Reactor Trip circuit breakers, shall be completed prior to entry into Mode 4 from the current outage.

\

fGW\

' 9704160134 97040s PDR S ADOCK 05000336 PDR ,

h. .N,@

OH3422-5 REY.194 L;_

U. S. Nuclocr R:gulatory Commission B16371/Page 2 B16371-03: In the response to NOV 336/96-08-07 (NNECO Commitment No.

B16076-2), Millstone . Unit No. 2 committed to perform a review of l Technical Specification surveillance procedures to ensure compliance with Technical Specification surveillance requirements as part of the Operational Readiness Plan.

Very truly yours, l

NORTHEAST NUCLEAR ENERGY COMPANY l 1

hY '

J. A. Price Director - Millstone Unit No. 2

Attachment:

LER 97-008-00 cc: W. D. Travers, Director of Special Projects H J. Miller, Region I Administrator D. P. Beaulieu, Senior Resident inspector, Millstone Unit No. 2 D. G. Mcdonald, Jr., NRC Senior Project Manager, Millstone Unit No. 2