05000336/FIN-2018003-01

From kanterella
Jump to navigation Jump to search
01
Site: Millstone Dominion icon.png
Report IR 05000336/2018003 Section 1R15
Date counted Sep 30, 2018 (2018Q3)
Type: NCV: Green
cornerstone Mitigating Systems
Identified by: NRC identified
Inspection Procedure: IP 71111.15
Inspectors (proximate) J Fuller
L Mckown
C Highley
K Mangan
H Anagnostopoulos
L Dumont
B Haagensen
D Schroeder
Violation of: 10 CFR 50 Appendix B, Appendix B to Part 50-Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants

10 CFR 50 Appendix B Criterion VII, Control of Purchased Material, Equipment, and Services
INPO aspect
'