| Q | CCA | Title |
---|
05000306/FIN-2018001-01 | 2018Q1 | | Questions Regarding Corrective Action Program, Use of Operating Experience, and Qualification of the 21 125 VDC Battery due to Cell Lid Cracking |
05000282/FIN-2018001-02 | 2018Q1 | | Questions Regarding the Corrective Action and Aging Management Programs Following the Discovery of 122 DDCLP FOST Vent Piping Degradation |
05000282/FIN-2018011-01 | 2018Q2 | H.6 | Failure to Justify Load Combinations Used in Main Steam Piping Stress Analysis |
05000282/FIN-2018011-02 | 2018Q2 | | Potential Failure to Protect Class I Structures, Systems,and Components from Tornado Generated Missiles |
05000282/FIN-2018002-01 | 2018Q2 | | Results of ISFSICask Array Dose Calculation Not Incorporated into FSAR |
05000282/FIN-2018003-01 | 2018Q3 | H.3 | Failure to Repair a D2 EDG Jacket Water Leak per the Leak Management Process |
05000282/FIN-2018003-02 | 2018Q3 | | Failure to Maintain a Preventative Maintenance Strategy for 12 and 22 Cooling Water Pump Diesel Engines |
05000282/FIN-2018003-03 | 2018Q3 | P.2 | Failure to Promptly Identify Degradation of the 122 DDCLP FOST Vent Piping |
05000306/FIN-2018003-04 | 2018Q3 | H.14 | Failure to Promptly Identify and Correct 21 125 VDC Battery Lid Conditions Adverse to Quality |