05000277/FIN-2018010-02
Jump to navigation
Jump to search
Site: | Peach Bottom |
---|---|
Report | IR 05000277/2018010 Section 1R05 |
Date counted | Jun 30, 2018 (2018Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | C Bickett E Dipaolo P Ott J Patel C Cahill G Dentel |
Violation of: | 10 CFR 50.54(hh) License Condition |
INPO aspect | |
' | |