05000275/FIN-2016007-02
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Promptly Correct the Lack of Design Verification of 460 Vac Motors at Maximum Allowable Frequency |
Description | The team identified a Green, non-cited violation of 10 CFR Part 50, Appendix B, Criterion XVI, Corrective Action, which states, in part, Measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are promptly identified and corrected. Specifically, prior to March 16, 2016, the licensee failed to assure that the lack of design verification of 460 Vac motors, which could be overloaded at the maximum allowable diesel generator frequency, was promptly corrected after having been identified in a 2013 apparent cause evaluation and again in a 2015 self-assessment as documented in Notifications 50572850 and 50826105, respectively. In response to this finding, the licensee performed a preliminary evaluation of the affected 460 Vac motors and concluded that operation at maximum emergency diesel generator frequency would not cause them to overheat or trip on overcurrent. This finding was entered into the licensee's corrective action program as Notifications 50835699 and 50838988. The team determined the failure to correct the lack of design verification of 460 Vac motors at maximum allowable frequency when powered from the emergency diesel generators was a performance deficiency. The performance deficiency was more-than-minor, and therefore a finding, because it related to the design control attribute of the Mitigating Systems cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, operation of 460 Vac motors above their rated or analyzed maximum allowable frequencies could result in motor overheating or a trip of the thermal overload relays. In accordance with Inspection Manual Chapter 0609, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, dated July 19, 2012, the finding screened as having very low safety significance (Green) because it was a design or qualification deficiency that did not represent a loss of operability or functionality; did not represent an actual loss of safety function of the system or train; did not result in the loss of one or more trains of nontechnical specification equipment; and did not screen as potentially risk-significant due to seismic, flooding, or severe weather. This finding had a cross-cutting aspect in the area of problem identification and resolution associated with evaluation because the licensee failed to ensure that the organization thoroughly evaluated issues to ensure that resolutions address causes and extent of conditions [P.2]. |
Site: | Diablo Canyon |
---|---|
Report | IR 05000275/2016007 Section 1R21 |
Date counted | Mar 31, 2016 (2016Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | C Steely D Loveless H Leake J Braisted J Zudans M Hayes N Okonkwo R Kopriva R Latta T Farnholtz |
Violation of: | 10 CFR 50 Appendix B Criterion XVI |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |
Finding - Diablo Canyon - IR 05000275/2016007 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Diablo Canyon) @ 2016Q1
Self-Identified List (Diablo Canyon)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||