05000275/FIN-2010007-10
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Update Text to Reflect Credited Design Class I Makeup Flowpath to Component Cooling Water Expansion Tank in the Final Safety Analysis Report Update |
Description | The team identified a Severity Level IV noncited violation of 10 CFR 50.71, \"Maintenance of records, asking of reports.\" Title 10 CFR 50.71, paragraph (e) states, \"Each person licensed to operate a nuclear power reactor shall update periodically the final safety analysis report originally submitted as part of the application for the license, to assure that the information included in the report contains the latest information developed.\" In the Final Safety Analysis Report Update Table 9.2-7, Component 5, it states, \"This 250 gpm, Design Class I, makeup water flowpath, described under Makeup Provisions in Subsection 2.3.3 (Section 9.2.2.3.3), can be started within 10 minutes.\" Final Safety Analysis Report Update, Section 9.2.2.3.3 states, \"All piping and valves in the makeup path from the condensate storage tank (including their crossconnections) and the firewater tank, through the makeup water transfer pumps up to and including the makeup valves on the component cooling water system lines, are Design Class I.\" Text later in the section implied that the flow path from the firewater tank was not Design Class I. Review by the licensee staff revealed that the only Design Class I flow path to provide makeup to the component cooling \'vvater expansion tank is via the condensate storage tank. This revealed that the text provided in Final Safety Analysis Report Update, Section 9.2.2.3.3 stating that both the condensate storage tank and firewater tank makeup paths are credited is incorrect. Contrary to above, since 1984 (Final Safety Analysis Report Update, Revision 0), the licensee did not update Final Safety Analysis Report Update, Section 9.2.2.3.3 to correct the error of including firewater as a possible makeup path to the component cooling water expansion tank. The licensee has entered this issue into their corrective action process as Notification 50301884. Failure to periodically update the Final Safety Analysis Report Update with a known error is a performance deficiency. Using Inspection Manual Chapter 0612, Appendix B, the team determined that this performance deficiency was to be evaluated using the traditional enforcement process because the performance deficiency had the potential for impacting the NRC\'s ability to perform its regulatory function. Using General Statement of Policy and Procedure for NRC Enforcement Actions, Supplement I, Reactor Operations, dated January 14, 2005, to evaluate the significance of this violation, the team concluded that the violation is more than minor because the incorrect Final Safety Analysis Report Update information had a potential impact on safety and licensed activities. Using Supplement I, Section D, Item 6, of the NRC Enforcement Policy, this performance deficiency will be treated as a Severity Level IV violation. Because this violation is of very low safety significance and entered into the licensee\'s corrective action program, this violation is being treated as a noncited violation, consistent with Section VI.A.1 of the NRC Enforcement Policy. The team reviewed the finding for crosscutting aspects and none were identified. |
Site: | Diablo Canyon |
---|---|
Report | IR 05000275/2010007 Section 1R21 |
Date counted | Jun 30, 2010 (2010Q2) |
Type: | TEV: Severity level IV |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | T Farnholtz S Makor B Correll S Hedger R Kbpriva |
INPO aspect | |
' | |