Finding | |
---|---|
Title | Failure to Scope Tainter Gate Flood Protection Features in Maintenance Rule Resulting in Degraded Performance |
Description | A self-revealing Green NCV of 10 CFR 50.65(b)(2)(ii) was identified for the failure to scope the external flood protection function of the Robinson Lake Dam spillway (Tainter) gates in the maintenance rule (MR) monitoring program. The failure to include the Tainter gates in the MR program resulted in ineffective maintenance being performed and subsequent degraded opening capability which challenged the availability of safety-related equipment during design basis rainfall events due to site flooding. The licensee took immediate corrective actions to replace/refurbish the chains to both gates and completed full open testing to restore their functionality. In addition, the licensee has developed and initiated implementation of an action plan to improve and ensure reliability of the gates, and initiated actions to revise the MR scoping program to include the Tainter gates. The issue was entered into the licensees CAP as CR 2035500. The failure to scope the flood protection function of the Lake Robinson Dam Tainter gates in the maintenance rule monitoring program was a PD. The finding is more than minor because it is associated with the protection against external factors (i.e., flood hazard) attribute of the Mitigating Systems Cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, failure to monitor flood protection features associated with the Tainter gates resulted in degraded gate opening performance that could have resulted in site flooding during design basis rainfall events and adversely impact multiple trains of safety-related equipment due to water intrusion. Using IMC 0609, Appendix A, The SDP for Findings At-Power, Exhibit 2, Mitigating Systems Screening Questions, the inspectors determined the finding involved the degradation of equipment specifically designed to mitigate flooding events. In accordance with Exhibit 4, External Events Screening Questions, the inspectors determined that the finding represented a degradation of two or more trains of a multi-train system or function during an external flooding event, therefore it required a detailed risk evaluation. A regional senior reactor analyst completed a detailed risk evaluation in accordance with NRC IMC 0609 Appendix A, and Appendix M, Significance Determination Process Using Qualitative Criteria, using the latest NRC Robinson Standardized Plant Analysis Risk model. The high uncertainty associated with estimating flood frequencies was the reason for using the NRC IMC Appendix M approach. The major analysis assumptions included a one-year exposure interval, recovery credit for opening the Tainter gates subsequent to binding of the chain, and limited credit for FLEX flooding mitigation strategies. If the rainfall produced a water surface elevation which would overtop the dam, the dam was considered failed and the ultimate heat sink lost. The rainfall frequencies requiring gate operation were estimated using a combination of National Oceanographic and Atmospheric Administration rainfall data and a probabilistic technique to establish precipitation frequency estimates performed by the licensee. The dominant sequence was a flood event inducing a non-recoverable loss of offsite power and loss of the emergency buses with a failure of the operators to manually recover the Tainter gates and failure of the operators to depressurize the steam generators to facilitate FLEX injection leading to a loss of core heat removal and core damage. The risk was mitigated by the low flood frequency, and the likely recovery of the Tainter gates prior to site flooding. There were additional conservatisms which were not applied to the result but would reduce the risk. These included the fact that the plant would be shutdown prior to flooding impacting safety-related equipment, which would reduce decay heat cooling required, and additional FLEX flooding strategies which could provide cooling even if the dam was lost. The risk increase due to the performance deficiency was < 1.0E-6/year, a Green finding of very low safety significance. The licensees analysis and full scope probabilistic risk assessment model produced a similar result. The inspectors determined that since the scoping of plant systems had occurred more than three years in the past, the finding did not represent current plant performance and therefore did not have a cross-cutting aspect associated with it. |
Site: | Robinson |
---|---|
Report | IR 05000261/2016003 Section 1R12 |
Date counted | Sep 30, 2016 (2016Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.12 |
Inspectors (proximate) | C Dykes J Reece J Zeiler R Kellner S Rose W Loo W Pursley |
Violation of: | 10 CFR 50.65 10 CFR 50.65(b) |
INPO aspect | |
' | |