05000255/FIN-2017004-01

From kanterella
Jump to navigation Jump to search
01
Site: Palisades Entergy icon.png
Report IR 05000255/2017004 Section 1R22
Date counted Dec 31, 2017 (2017Q4)
Type: NCV: Green
cornerstone Barrier Integrity
Identified by: Self-revealing
Inspection Procedure: IP 71111.22
Inspectors (proximate) A Nguyen
J Boettcher
B Bartlett
J Coroju-Sandin
G Hansen
V Myers
L Rodriguez
D Sargis
E Duncan
Violation of: 10 CFR 50 Appendix B, Appendix B to Part 50-Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants

10 CFR 50 Appendix B Criterion V, Instructions, Procedures, and Drawings

Technical Specification
CCA H.2, Field Presence
INPO aspect LA.2
'