Forwards LER 97-008,Rev 00 & Submits Commitments.Revised Qcop 2300-13 Is to Include Steps to Fully Disengage Turning Gear If Necessary for Testing Purposes
ML20138H812
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 04/29/1997
From: Pearce L
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138H815 List:
References
LWP-97-044, LWP-97-44, NUDOCS 9705070294
Download: ML20138H812 (2)


LER-2097-008, Forwards LER 97-008,Rev 00 & Submits Commitments.Revised Qcop 2300-13 Is to Include Steps to Fully Disengage Turning Gear If Necessary for Testing Purposes
Event date:
Report date:
2542097008R00 - NRC Website

text

P Commonwealth 1:dison Comp.iny ~

Quad Citich Generating Station

. 22?lo 206th Asenue North 8 , (brdova.11 612 i2-9'40 Tei .w>m2n i LWP-97-044 l

April 29, 1997 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk

Reference:

Quad Cities Nuclear Power Station Docket Number 50-254, DPR-29, Unit One Enclosed is Licensee Event Report (LER)97-008, Revision 00, for Quad Cities Nuclear Power Station, i

This report is submitted in accordance with the requirements of the '

Code of Federal Regulations, Title 10, Part 50.73(a)(2)(v)(D). The licensee shall report any event or condition that alone could have prevented the fulfillment of the safety function of structures or systems that are needed to mitigate the consequences of an accident.

The following commitments are being made by this letter:

1. Revise QCOP 2300-13 to include steps to fully disengage the turning gear if necessary for testing purposes. This will be completed by 060197.
2. System Engineer to review with General Electric available information on this type of turning gear to ensure that correct repair instructions are included in the vendor manual and are available for future repairs. This will be completed by 090197.

\

9705070294 970429 PDR ADOCK0500g4 O /})

,fg ff lb l ff}[ll STMGRW4497.LWP A I nicom ( .ompJnV

9 4- ,

LWP-97-044 2 April 29, 1997 If there are any questions or comments concerning this letter, please refer them to Charles Peterson, Regulatory Affairs Manager at 309-654-2241, ext. 3609.

Respectfully, COMMONWEALTH EDISON COMPANY QUAQ CITIES CLEAR POWER STATION YdA UG L. W. Pearce Station Manager LWP/CP/plm Enclosure cc: A. B. Beach, Regional Administrator, Region III R. M. Pulsifer, Project Manager, NRR C. G. Miller, Senior Resident Inspector, Quad Cities W. D. Leech, MidAmerican Energy Company D. C. Tubbs, MidAmerican Energy Company P. L. Piet, Licensing, Comed F. A. Spangenberg, Regulatory Affairs Manager, Dresden INP0 Records Center l