05000254/FIN-2018003-01
Jump to navigation
Jump to search
Site: | Quad Cities |
---|---|
Report | IR 05000254/2018003 Section 1R15 |
Date counted | Sep 30, 2018 (2018Q3) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | R Murray K Carrington L Rodriguez N Feliz-Adorno N Fields M Learn C Mathews K Stoedter |
Violation of: | 10 CFR 50 Appendix B 10 CFR 50 Appendix B Criterion III, Design Control |
INPO aspect | |
' | |