| Q | CCA | Title |
---|
05000254/FIN-2014004-01 | 2014Q3 | | Angle Iron Support Installed with Minimal Clearance to Unit 2 Torus Shell |
05000254/FIN-2014004-02 | 2014Q3 | H.7 | Inadequate Evacuation Time Estimate Submittals |
05000254/FIN-2014007-01 | 2014Q3 | H.9 | Inadequate Rounds Package Acceptance Criteria |
05000254/FIN-2014007-02 | 2014Q3 | P.3 | Inadequate Administrative Controls 05000265/2014007-02 |
05000254/FIN-2014008-01 | 2014Q4 | H.1 | Failure to Identify Aging Effects on Plant Equipment and Structures |
05000254/FIN-2014005-01 | 2014Q4 | H.13 | HPCI Flood Barrier Degraded |
05000254/FIN-2014005-02 | 2014Q4 | | Failure to Submit a Report Required by 10 CFR 50.72(b)(3)(xiii) |
05000254/FIN-2014008-03 | 2014Q4 | | Testing of MSIVs with Instrument Air or Drywell Pneumatic System Aligned to Actuators |
05000254/FIN-2014008-02 | 2014Q4 | | Non-Conservative DGCW Pump Break Horsepower Assumed in EDG Loading Analysis |
05000254/FIN-2015001-01 | 2015Q1 | P.2 | Failure to Establish and Maintain Service Life for Safety-Related Relay Results in Failure and Inoperability |
05000254/FIN-2015001-02 | 2015Q1 | H.5 | Failure to Ensure Standby Lineup Results in Steam Release in the HPCI Room |
05000254/FIN-2015201-01 | 2015Q2 | | Security |
05000254/FIN-2015002-02 | 2015Q2 | H.5 | Inadequate Zone of Protection for Electrical Bus Maintenance |
05000254/FIN-2015002-01 | 2015Q2 | H.7 | Failure to Conduct Post-Maintenance Testing Following Manual Operation of RCIC MOV |