| Q | CCA | Title |
---|
05000247/FIN-2015012-02 | 2016Q1 | | Security |
05000286/FIN-2016001-03 | 2016Q1 | H.14 | Inadequate Screening of Reactor Protection System Test Method Change |
05000247/FIN-2016001-02 | 2016Q1 | H.7 | Failure to Adequately Implement Risk Management Actions for the Containment Key Safety Function |
05000247/FIN-2016001-04 | 2016Q1 | P.2 | Failure to Implement Surveillance Requirement for Main Boiler Feed Pump Trip Function |
05000247/FIN-2016001-05 | 2016Q1 | H.11 | Failure to Provide Adequate Procedural Guidance in Order to Prevent an Overcurrent Condition |
05000247/FIN-2015012-01 | 2016Q1 | | Security |
05000247/FIN-2016001-01 | 2016Q1 | | Baffle-Former Bolts with Identified Anomalies |
05000247/FIN-2016001-07 | 2016Q1 | | January 2016 Groundwater Contamination |
05000247/FIN-2016001-06 | 2016Q1 | | 23 Emergency Diesel Generator Automatic Voltage Regulator Failure |
05000247/FIN-2016002-04 | 2016Q2 | | Failure to Scope Safety-Related Main Boiler Feedwater Pump Discharge Valves into the Maintenance Rule Program |
05000247/FIN-2016002-03 | 2016Q2 | H.12 | Failure to Maintain Flow Channeling Gates Closed in Accordance with the Containment Procedure |
05000286/FIN-2016002-02 | 2016Q2 | | Withdrawn - Failure to Follow Operability Determination Procedure for Unit 3 Baffle-Former Bolts |
05000247/FIN-2016002-01 | 2016Q2 | | CVCS Goal Monitoring Under the Maintenance Rule |
05000247/FIN-2016003-07 | 2016Q3 | P.3 | Inadequate Control of Floor Drains to Minimize Groundwater Contamination |
05000247/FIN-2016003-02 | 2016Q3 | | Missed Inspections on Automatic Voltage Regulator Cards Results in Emergency Diesel Generator Failure to Run |
05000286/FIN-2016003-03 | 2016Q3 | H.14 | Untimely Corrective Actions to Address Degraded Automatic Voltage Regulator Cards |
05000247/FIN-2016003-04 | 2016Q3 | H.8 | Entry into a High Radiation Area without Radiological Briefing |
05000247/FIN-2016003-05 | 2016Q3 | H.5 | Failure to Maintain Radiation Exposure ALARA During Unit 2 Reactor Cavity Liner Repairs |
05000247/FIN-2016003-06 | 2016Q3 | H.5 | Failure to Maintain Two Qualified AC Sources of Offsite Power |
05000286/FIN-2016003-01 | 2016Q3 | P.1 | Failure to Adequately Assess Fire Risk Associated with Maintenance on the Unit 3 Appendix R Diesel Generator |
05000247/FIN-2016004-04 | 2016Q4 | H.2 | Failure to Follow RPS Logic Train B Actuation Logic Test |
05000286/FIN-2016004-03 | 2016Q4 | H.14 | Failure to Provide Indication of a Bypassed RPS Channel During Testing |
05000286/FIN-2016004-02 | 2016Q4 | H.12 | Inadequate Operability Evaluation of Leak in Service Water Pump Discharge Pipe |
05000286/FIN-2016004-01 | 2016Q4 | | Inadequate Preventive Maintenance Classification of Starting Air Relief Valve Led to Failure |
05000247/FIN-2016404-01 | 2016Q4 | H.9 | Security |
05000286/FIN-2016009-01 | 2016Q4 | H.12 | 345 kV Insulator Failure Causes Reactor Trip |